Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Waste Medical Incinerators


Product Description

Nanjing Clover Medical Technology Co., Ltd..

Items/Model TS50(PLC)
Picture  
Burn Rate 50 kg/hour
Feed Capacity 100kg
Control Mode PLC
Combustion Chamber 560L
Internal Dimensions 100x80x70cm
Secondary Chamber 280L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.7Kw
Oil Consumption (kg/hour) 12.1–24
Gas Consumption (m3/hour) 9.9–26.1
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 100L
Feed Door 70x55cm
Chimney 5Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800 degree–1000degree
2nd. Chamber Temperature 1000degree-1200degree
Residency Time 2.0 Sec.
Gross Weight 4500kg
External Dimensions 230x130x155cm

TS model PLC incinerator is newest design for waste treatment, include medical waste, animal cremation and other solid waste. This gear quality structural for types of website, crematory burner, crematory gear, crematory equipment manufacture, crematory filter, crematory in china, crematory incineratorincineration, crematory manufacturer china, such as hospital, environmental department, animal cremation bureaus, etc.. CLOVER Incinerator provide updated versions with double combustion room and smoke filter room using refractory lines, along with the combustion room temperature up to 1200 deg C.

3 Chamber Incinerator


Primary chamber:
Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.
Secondary Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.
Third Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.
Integrated dual flu gas washer:

Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.
Chimney:
Heavy duty 5mm or more stainless steel casing mild steel casing.
Stack cap/spark arrestors.
Control Panel:
a.Temperature Monitoring with 4 digit display.
b.Thermostat control device for burner (fuel saver)
c.Temperature control 0-12 hours.
d.Integral fan timer control


Tinian solid waste: Where to go?


The Marine Forces Pacific lately held an ad hoc committee meeting with the Bureau of Environmental and Coastal Quality, Environmental Protection Agency, Tinian Mayor’s Office, Department of Public Works and Administration agents at the BECQ office on Middle Road to map out the directions to take relating to this potential solid waste solutions beneficial for both the military and the civilian inhabitants.

In light of this ongoing National Environmental Policy Act process on the construction of ranges and training areas on Tinian, the Marine Forces Pacific examined these choices and discussed these with the CNMI.

In analyzing these choices, the U.S. military held the premise that the present dumpsite situated at Puntan Diablo on Tinian — the area where the Chinese group of investors is planning to grow in an integrated hotel — will be shut and a transfer station is being considered.

MARFORPAC environmental specialist Sherri Eng said the dumpsite isn’t something that the military will be able to use.

Only by taking a look at the requirements and the benefits of the options explored, Eng said that the simplest are the off-island disposal.”

In choosing the off-island disposal alternative, the parties will have to check in the capability of the Marpi landfill to adapt the waste coming from Tinian — both military and civilian waste.

Eng, in a meeting with the regional regulatory officials and agencies walked them through the 3 systems being considered.

She stated that this system could cause significant waste reduction and energy production.

However, there are challenges to be met: siting and permitting, preserving consistent operations, the demand for waste and sorting monitoring, high first price, high maintenance cost and deadline for construction.

“Construction timeline is extended. It is not something that we can set up tomorrow,” said Eng.

Department of Public Works Secretary Martin C. Sablan mentioned about the CNMI getting an incinerator which it never used because of the problem of permitting through the regulatory agencies.

“Permitting was a issue,” said Sablan.

Choice 2: Fukuoka Landfill

The Fukuoka landfill is a new approach to handling solid waste. It is a semi-aerobic landfill with a leachate gathering pipe set up at the landfill floor that drains the leachate to a treatment facility.

This method does not require a synthetic lining.

But if that were to be pursued, Tinian will require an extra 15 hectares and the usage of certain construction material.

The MARFORPAC agents said they’ve conducted research on this particular method.

It was performed in Palau, Yap and American Samoa but nowhere else in the continental United States due to permitting.

“We have to find some type of waiver,” said Eng mentioning it isn’t a permitted system from the U.S.

However with Fukuoka method, there’s a potential to convert the existing dumpsite on Tinian.

As for leachate, the military is contemplating to upsize its waste water treatment center to adapt this if this would be the option to consider.

Since the Fukuoka landfill may require clay, Eng said their research showed the deficiency of the material on Tinian; however, it was suggested there’s a supply in Papago.

Choice 3: Off-island disposal

This alternative proposes to use the existing Marpi landfill.

With this option, Eng stated there will be no extra land requirements.

She explained this centralizes waste management program on Saipan.

But Eng was quick to point out that one of the challenges is how to manage the perception that Saipan becomes a dumping ground.

The military sees the need to upgrade shipping infrastructure.

“We are eager to accept military waste,” said DPW Secretary Martin C. Sablan.

He explained that they had excavated the floor to assemble the third cell of the landfill facility.

With this option, Eng assured that”anything we do, we are going to take the Tinian squander with us.”

Asked by DPW if the military were to foot the bill for shipping and transfer of this waste, Eng stated,”We agree to find the solution and expect to find the solution.” She explained she could not commit to anything.

Sablan said it’ll cost less for the military to deliver their waste to Saipan but the municipality will be needing assistance.

Feasibility study for three choices?

Eng pointed out that the choices needs to be brought down to two.

“I do not think we’ve got the time and cash to do all three,” she explained.

Transfer station is vital

As they mulled the prospective solutions to Tinian’s solid waste issues, Eng stated it is supposed that there’ll be a transfer station.

“Transfer station is important in these sytems,” she explained.

Closure of this dumpsite

Tinian Mayor Ramon M. Dela Cruz pointed out It Is not the responsibility of the developer to close the Present dumpsite at Puntan Diablo.

He, however, stated that Alter City has dedicated to supplying around $5 million in support.

Mayor Dela Cruz stated three years will be reasonable.

“That will permit the developer to work on the adjoining property,” he explained.

Alter City Group is proposing to build a golf course at the present site of the dumpsite.

Alter City dedicated to assist

At a hearing prior to the CNMI legislature a week, Alter City’s legal counsel Rober Torres stated,”Investor is prompted to assist in its elimination.”
By: http://www.mvariety.com/special-features/business-edge/70491-tinian-solid-waste-where-to-go

“That will allow the developer to work on the adjacent property,” he said.

Alter City Group is proposing to build a golf course at the current site of the dumpsite.

Alter City committed to assist

At a hearing before the CNMI legislature last week, Alter City’s legal counsel Rober Torres said, “Investor is motivated to assist in its removal.”
But he said the government too has to pitch in.
by: http://www.mvariety.com/special-features/business-edge/70491-tinian-solid-waste-where-to-go


Two combustion chambers type incinerator

Load Capacity minimum:  1500 kg
Burner fuel type:  Diesel
Burner fuel rate max.:   20-25 Liter diesel/ per hour
Burners minimum: 3
Burning rate minimum: 200-300kg/per hour
Furnace bar area minimum: 2 м3
Fuel tank capacity minimum: 300L
Main chamber burning temperature min. 1100 0C
Afterburner chamber burning temperature min.  1300 0C
Power supply 220V
Incinerator items and electrical appliances should be weather proof
and humidity resistant within the range of 30-90 %
Incinerator should be compliant to the environmental protection rules
in accordance to national legislation
Maximum dimensions – Length – 5m, width – 3.5m, height – 5m.Medical and Biological wastage.
3.1              Main unit
3.1.1
Application      For incineration, general and pathological
3.1.2                                            Capacity       100 – 120 kg/h burn rate
3.1.3
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4         Operating time                   Minimum 8 hours daily
3.1.5          Operating temperature        From 850 0C to 1200 0C, Automatic controlled
3.1.6          Residual Ash                       5 to 10%
3.2     Primary Chamber
3.2.1
Construction    Constructed from heavy duty mild or aluminized  steel
Or equal and approved equivalent
3.2.2
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
3.2.3
Internal Construction           Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material
3.2.4
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
3.2.5          Door Lock                             Automatic, Electric type
3.2.6
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
3.2.7                                    Gratings       Provided
3.2.8                                            Loading    Manual loading of waste
3.2.9           Primary Burner                           Fully automatic, with fuel, temperature and speed  controls with ignition system  flame detector                                                         Air fan Complete with safety features, flame failure                                                                    Diesel fired fuel injector type
Flange mounted
3.2.10    Blower      Provided.  3 phase for supplying excess combustion air through the distribution system with speed control system
3.2.11    Temperature    Minimum exit 850 0C
3.2.12                               Observation port    To be provided with protective glass type
3.3    Secondary chamber
3.3.1
Construction    Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2                                            Insulation    Refractory material lining
3.3.3             Combustion Temperatures      Above 850 0C, controlled electronically
3.3.4             Gas residue or retention time                                              > 2 second at minimum 850 0C
3.3.5    Secondary Burner    Provided,
Diesel fired,
Fully automatic, with fuel, temperature and speed controls
With ignition system
Flame detector
Air fan
Complete with safety features, flame failure
Diesel fired fuel injector type
Flange mounted
3.3.6    Ejector    Provided, Venturi type, for cooling the flue gases
3.3.7
Combustion Air Fan                      Provided for supplying combustion and creating a
negative drift and turbulences with variable speed control
3.3.8                                         Temperature    Maximum  1600 0C
3.4       Chimney
3.4.1
Construction    Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent
Refractory material lining
3.4.2                                                    Length    10 m above ground
3.4.3                                                        Bore    about 350mm diameter
3.4.4            Discharge temperatures             About 850 0C
3.4.5                                            Emissions    To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
3.5.1    Control unit                                           Fully automatic with microprocessor based control
unit (PLC) automating all operations of the incinerator
Capable of monitoring all incinerator parameters
With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and second chambers , turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
3.5.2    Isolator switch                                  Supply and install isolator switch 100A, 3 phase, 415V, 50Hz, for the incinerator unit , including all necessary cables 10m
3.5.3
Distribution Board           Supply and install distribution board 100 A, 3 phase 415V, 50Hz, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
3.5.4
Wiring       Make provisions for wiring the isolator switch,
Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.
Working length 20m.
Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6    Fuel System
3.6.1          Fuel Tank                                            Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Tank capacity, 500 liters, constructed from preferable
suitable metallic material or high temperature
resistance material
Fuel type    Diesel
3.6.2
Fuel Lines                                       Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.  Working length , 20m
Fuel pipe material    Special copper pipes or similar and approved materials
4. Physical characteristics
4.1              Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions    About 2.5 x 2.8m (WxD)
5.  Operating environment
5.1              Power Requirements                      415V, A/C 50Hz, Three phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6             Accessories
6.1             Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
7. Spare parts
7.1                                                      Burner        1 set
7.2              Fuel Filters                                         6 sets
7.3
All other spare parts                 required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
8.2
Manufacturing standards               Environmental Management and Coordination Act, 1999
Legal Notice No.121 of 29th September 1999 on                                                                         waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
9.1                                                         Available    Should be available locally
9.2           Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
10.1                                                        KEMSA    For inspection and verification
10.2
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
11    Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12    Installation and testing    Complete installation and setup of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
13            Training
13.1
User training                                           On site user training on operation and daily up keep
13.2
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14    Technical Documentations
14.1         User manuals                                          2 sets
14.2         Service manuals                                     2 sets
14.3                                                     Drawings    2 sets
15        Commissioning
15.1    Testing and Commissioning of the machine to the satisfaction of the user
16    Warranty
16.1                                                  Equipment      Minimum of one year after commissioning on all parts.
16.2       Equipment system                                     Nil
17.    Maintenance contract
17.2         Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

Capacity per day around 8-10 kg wastage/day.·         Which product do you offer, only incinerator or also compactor, shredder machine, any other equipment related to waste treatment ?

·         For the incinerator, can you propose (and of so please send us specs and price) incinerator for 25 kg/hr, 50 Kg / hr, 100 kg / hr, 200 kg / hr ? what is your minimum and maximum size available ?

·         As we are not so experience in incineration process, can you tell us which type of waste can go into the incinerator and still respecting international environmental regulation ?

·         Do you equipped your incinerator with filters ? if so which one and they are following which standard ?

·         Can you supply exhaust pipe from incinerator to the roof, and then whirly bird to avoid the rain water to go into the pipe ?

·         When we install an incinerator within a building, what are the distance to observe between equipment and wall and roof (as we need to supply also the building to house the incinerator )

Hospital Incinerator


Product Description

Ypes of Medical Waste: The Medical Waste is generated in the diagnosis, treatment, or immunization of human beings or animals, in research pertaining thereto, or in the manufacturing or testing of biologicals. Medical waste may be identified by one of three different categories: Infectious, hazardous, and general, (Medical Waste A/B/C/D/E) 

Incineration is the controlled burning of this medical waste in a dedicated medical waste incinerator. Among industry folks, these components are often referred to as hospital/medical/infection waste incinerators. The waste usually passes through the incinerator onto a belt, and since most medical waste may be emptied, the waste is not sorted or separated prior to treatment. Incineration has the price of incinerator 20 kg/hrcost of incinerator for cremating animals, price of big animal crematorycost of pet cremation equipment, price of little incinerator, advantage of decreasing the amount of the waste, sterilizing the waste, and eliminating the need to get pre-processing the waste before treatment. The resulting incinerated waste could be disposed of in traditional procedures, for example brought to a landfill. The downside of incineration is possible pollution from emissions generated during incineration. The EPA has strict requirements on emissions from medical incinerators. The incineration process can be applied to many medical waste types, including pathological waste, and also the method reduces the amount of the waste by up to 90%. 

Clover Medical Waste Incinerator Equipment

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm