BURNER DESCRIPTION
The Version is for as much as 300kgs capability per batch bunches in addition to will absolutely lose at around 55kgs per hour.
The system has leading packing style and has a strong refractory concrete lining for optimal heat retention. Gadget have huge leading cover for extremely easy loading, along with especially made front ash door, for ash elimination.
This system performs at over 1100 ° C in the vital chamber to guarantee total combustion. This design likewise benefits
from a strong second chamber as well as burner that makes particular a complete re-burn of any smoke along with exhausts along with a 0.5 second gas retention time.
Thaw rate 150kg/h minimum
Second Chamber Yes.
Gas Retention Time 2 secs.
Gas Diesel/LPG/LNG.
Power Supply for Control Box 220V-240V 50Hz singular phase.
Minimum Operating Temperature Level 920 ˚C
PRIMARY CHAMBER.
Resilient steel case.
Outstanding quality refractory lining as well as insulation.
Substantial full dimension leading lots door and also fluid retention sill.
1 x diesel oil terminated ignition heating systems operated on/off.
EXTRA CHAMBER.
Sturdy steel housing.
High quality refractory lining along with insulation.
1 x diesel oil fired ignition heating units ran on/off.
Requirements for Dual Chamber Incinerator:.
Key Burning.
The primary burning chamber will be approved as the crucial burning area.
The minimum burning temperature of the vital chamber shall not be much less than 800 degrees c.
Additional Burning.
The house time in the second chamber will certainly not be a lot less than 2 secs.
The gas temperature degree as gauged versus the within wall surface in the additional chamber, not in the fire zone will certainly not be less than as suggested in Lot 1-7.
Both the additionally additional as well as primary temperature levels will be maintained till all the waste has actually been completely ignited.
Chimney.
The chimney shall have a very little height of 4 metres over ground level.
The minimal departure rate of the discharges will not be less than 10metres/second.
Temperature Cautions.
When the second temperature level drops to listed below the required temperature level, a distinct and/or recognizable alarm to alert the operator.
General.
Control box can be divided and also installed on different stand of atleast 1.5 metres from the burner at about 1.6 metre altitude.
CE certified or equal for burners of this measurement and additionally design.
Drawings along with images for the provided whole lots.
1 year extra parts, gas containers as well as 10metre pipe ahead typical with every heater.
Specs for Mobile Heater Units.
Trailer mounted mobile burner tools excellent for the following applications.
Clinical waste.
Residential waste.
Industrial waste.
Pet cadavers.
SMOKESHAFT.
Resilient stainless-steel situation.
1.5 m dimension.
0.6 m refractory lined stack.
CONTROL PANEL.
Control of 1 heating unit.
Timer control 0- 12 hrs.
Vital fan timer control.
Temperature level Monitoring.
Thermostatic Control.
Automatic Control.
Cycle time developed.
ANCILLARIES.
Running along with maintenance handbooks.
Saves listing.
CONTAINERISATION.
incinerator absolutely mounted within 10 ft ISO accredited container.
3,5 kwA electrical power generator, 1000 litres fuel storage tank.
Burner placed on the silenblock padding.
Item | Specification | |||||
Model | YD-30 | YD-50 | YD-100 | YD-150 | YD-300 | YD-500 |
Burning Rate | 30kgs/Hour | 50kgs/Hour | 100kgs/Hour | 150kgs/Hour | 300kgs/Hour | 500kgs/Hour |
Main Product List | Double Combustion Chamber | |||||
Mix-Combustion Chamber | ||||||
Smoke Filter Chamber | ||||||
Control Case | ||||||
Stack | ||||||
Italy oil/gas burner: 02 units | ||||||
Oil Tank (if oil fuel) |
Nanjing Clover Medical Technology Co., Ltd..
If you call 911 about a fever and vomiting in Allegheny County, don’t be surprised if the operator asks whether you recently traveled to West Africa.
Preparing for an Ebola case to be diagnosed in Pennsylvania is an orchestra of government departments, health care entities and private businesses, conducted by state and local public health departments, with guidance and manpower from the Centers for Disease Control and Prevention.
But dealing with the reality of an Ebola case can go very differently — missteps in Texas delayed treatment for Thomas E. Duncan, who died of the virulent disease last week.
Pennsylvania health officials are watching.
“I don’t think Texas changes on how we prepare for infectious disease outbreaks,” said Holli Senior, spokeswoman for the Pennsylvania Department of Health. “We will continue to watch, learn and adjust here in Pennsylvania as the situation evolves domestically and globally.”
The largest hospitals in Western Pennsylvania said they are prepared to treat patients with symptoms of the illness. Health giant UPMC trained special “SWAT” teams that will address Ebola cases. Allegheny County 911 operators could ask about travel before sending emergency responders to the houses of potential victims, county spokeswoman Amie Downs said.
Hazardous waste transporters who spoke with the Tribune-Review said that if a person falls ill at home, a private cleaning crew and transporter would be needed.
Contaminated materials likely would end up in an incinerator in Maryland because Pennsylvania has no incinerators for medical waste outside of hospitals, said David Henritz, owner of Bio-Haz Solutions in Lehighton in Carbon County.
It’s not clear what would happen if Maryland state officials or a company refused the medical waste.
Related: Stricter U.S. Ebola screenings to begin for travelers
“This is a complicated thing, and it’s not that anyone’s doing poor work. A lot of these players are organizations that haven’t worked together in the past,” said David Dausey, who leads preparedness drills as director of Mercyhurst University Institute of Public Health in Erie.
Many preparedness plans assume that someone would seek treatment at an urgent care clinic or emergency department.
“We’re making sure all the providers know what the checklists are. All those emergency rooms and hospitals should know what they should be doing,” said Dr. Karen Hacker, director of the Allegheny County Health Department.
Bill Smith, senior director of emergency preparedness at UPMC, said electronic medical records remind doctors and nurses to take precautions if a patient has symptoms and a travel history that suggest Ebola.
The patient would be isolated, though it could be in an exam room with a closed door and controlled access, Smith said.
“Our current thinking is that we don’t want to move anybody,” he said.
Hospitals within the Allegheny Health Network, including Allegheny General in the North Side and West Penn in Bloomfield, keep carts with special supplies ready to treat a patient with Ebola.
The carts contain items used in other functions in the hospital — face shields, goggles, extra gloves. Rather than paper gowns, there is a plastic, impermeable gown and plastic leggings. The goal is to make a liquid-proof barrier between patient and health care provider, said Dr. Robert Keenan, chief quality officer for the two hospitals.
Emergency preparedness involves steps fashioned to deal with severe acute respiratory syndrome, or SARS, avian flu or seasonal influenza, Keenan said.
Hacker said emergency providers should have appropriate safety gear if they arrive at a home with a possible Ebola case.
If someone goes to the hospital, his or her home may need to be cleaned and decontaminated. This requires a cleaning crew and the ability to transport hazardous biological waste on the highway.
“You’d pretty much have to destroy anything that person came in contact with,” said Bill Krulac, an emergency response expert with the hazardous waste management company McCutcheon Enterprises in Apollo.
Krulac said the company carries protective clothing and respirators and would remove anything in the house that came in contact with a patient’s bodily fluids. This could be sheets, a mattress and even clothes. Everything would be dunked in bleach and other cleaners and loaded onto a truck to go to an incinerator. The virus is heat-sensitive.
Staff at UPMC have been trained in intricacies such as the appropriate way to take off a hazmat suit, which starts with one ungloved hand slipping inside the suit at the shoulder and rolling it down to avoid touching the outside.
If someone dies, the body is double-wrapped in impermeable bags and taken to a crematorium, following federal guidelines, Keenan said. But the corpse of an Ebola patient is infectious, and it’s unclear what would happen if cremation companies refused.
Such weak links break an emergency response chain, said Dausey at Mercyhurst.
“If you come out and say, ‘Yeah, we were completely prepared,’ and something goes wrong, people think you lied,” he said. “If we’re prepared for the Ebola today, that’s great, but what about the Ebola of tomorrow?”
Burring Capacity 100 / 200 KG/ hr Please write your offer here
Number of Burner 02 Nos Please write your offer here
Incinerator Type Dual Chamber
Primary Chamber
Secondy Chamber Please write your offer here
Incinerator Design Controlled Air Please write your offer here
Fuel to be used Natural Gas / Deisel Please write your offer here
Loading System Manual / Batch Type Please write your offer here
Warmer Time 20 minutes Please write your offer here
Type of Paint Heat Resistance enamel paint Please write your offer here.1. Petrol: diesel
2. Consumption: 8-10liter/hour
3. Capacity: to cremate (carrion and spoils) 350-400kg/hour
4. Temperature: 900-1350?C
5. Operation temperature: -30~40?C
6. Incinerator weight: 1800-2000 kg
7. Volume: 0.70-0.80m/cube
8. Exterior dimension: 1.4-1.6*1.0-1.15m (L*W)
Incinerator is a incineration equipment, direct fire squander by gasoline fuel or oi gas. As different circumscription, incinerator could be named many words as under:
Treatment ability: Small scale incinerator, large scale incinerator and incineration pant.
Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators
Incinerator gas: Gas incinerator, oil incinerator
Waste to Energy (WTE): WTE incinerator, non-WTE incinerator
Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.
Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India)
Burning Speed: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour
Nous fournissons des capacité S d 10/15/20/50/100/150/300/500 Kg / Equipements heures. Chaque anné E, nous vendons plus de 50 unité S d'é Quipements d'outre-mer. L'é Quipement est de petite taille, rendement é Levé, processus raisonnable, des technologies medical incineratoe, medical incinerator 10kg cost, medical incinerator 15kg/hr, medical incinerator audit, medical incinerator burner, medical incinerator buyer, de pointe et de haut degré Sans hazard. Il est IDé Al pour les é Quipements de traitement des ordures hô Pital, laboratoire, hô Tel, gare, etc Le brû Leur de combustion, d'origine de l'Italie et le Japon cé Lè Bre marque ou techniques.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
Standards
PLEASE REFER TO BROCHURES ATTACHED FOR DETAILED SPECIFICATION
PLEASE REFER TO BROCHURES ATTACHED FOR DETAILED SPECIFICATION