hog insinerators


Finish

All equipment shall be painted with a coat of zinc rich primer and two coats of high temperature heat resistant

polyurethane type paint. All painted surfaces shall be prepared by either steel shot cleaning or sand blasting.

 

Identification and Name Plates

Identification and name plates containing the manufacturer’s name, model number, serial number, and other pertinent

information shall be securely fastened to the unit in readily visible locations.

 

Fuel Type and Tank

All burners shall be fuel oil (diesel) fired. For all incinerators fitted with fuel oil (diesel) type burners, the

bidder shall supply and install 1000 litres steel tank and all the necessary piping and fittings and initial supply of

1000 litres fuel oil. Where existing fuel is found to be still in good condition from site inspection, contractors must

use existing tanks and therefore must clearly specify in their bids of such usage. The tank shall be positioned at

least 2 meters above ground on steel frame next to the incinerator shed. Fuel delivery to incinerator burners shall be

by gravity feed. The tank should be fitted with a drain plug as standard.

  1. Post – combustion chamber:

Medical waste incinerator

Standard requirement:

The medical incinerator should meet the European standards 2000/76/EC.

Basic requirements:

1-Capacity 100kg/hr.

2-Work for 24 hours.

3-Unit should have enough combustion room consists of two combustion chambers (mounted vertically)

4- Unit should supply with control methods for air entry to the primary and secondary chambers and hence incineration

of the waste is accomplished.

5-The unit charging is done automatically and have an option to be done manually.

6-The ash removal is done automatically and have an option to be done manually

7-The unit should have a dry filtering unit.

8-The unit should be controlled from the control panel.

control panel :

Should show different tasks of operation using (PLC)

-Temperature in combustion chamber

-time of operation and combustion.

-different pressures.

-amount of air in combustion.

-efficiency indicator.

-emergency system in case of increasing pressure or temperature.

f- Time for gas passing:

Minimum time required for passing to combustion chamber for oxidizing 0.5 seconds at 800 degree Celsius .

1- design details:

A-primary combustion chamber:

Oxidize all waste to combustion residuals and temperature not less than 800 degree Celsius.

b- Secondary chamber:

Continue combusting combustion gas residuals and hanging particles using additional burner temperature not less than

1100 degree Celsius and this conditions is reached by harmonizing between temperature and time of passage to ensure

adequate oxidizing supplying enough air to ensure turbulence of gas all the time this is controlled from control panel.


Incinerator: Calculations for Bunker Capacity


Basic Info.

Export Markets:Global

Product Description

Key Attributes:  * All versions with Dual combustion room.  * Stainless Steel chimney/stack, long life. *according to sequence * High fever, long life of incinerator.  * Free or minimum installation onsite.  * High speed, from 10kgs to 500kgs per hour, up to 6ton daily.  * PLC Control Plane. *according to order  * New Design for pet animal cremation enterprise.  * One year warranty on incinerator and parts in stock. 

Program Scope:  1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. 3. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation 

Nanjing Clover Medical Technology Co., Ltd.. Is a leading waste incinerator maker in China. We’re local manufacturer and among the largest exporter of China. Pyrolytic incinerator gear technical is main waste treatment all of the planet, for Medical Waste, Animal Incineration, Pet cremation and other good wste. The capacity from 10kgs/Hr. To 500kgs/Hr. Up to 6ton daily. Presently, we provide where incinerate pet in bangkok, where to buy medical incinerator in china, who zambia incinerator, why clinkers formed in incinerator operation, xiamen city east incineration, different series for local client requirements and design upgraded incinerator with our leading technology. The upgraded design feature of our range of incinerators make them among the most cost effective on the planet.

Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

New Metro incinerator Could cost $1.3 billion more than planned: Research


Metro Vancouver is taking more heat over its strategy to construct a second garbage incinerator, using a new study commissioned by squander firm Belkorp Environmental Services indicating the move could cost around $1.3 billion more than originally estimated.

The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to take care of the state’s rejection of its proposed Bylaw 280, which was essential to its solid waste management program because it could have guaranteed crap created in Metro was kept in the area.

Belkorp, which conducts the Cache Creek ditch, has been engaged in a high-profile lobbying effort against Bylaw 280 as well as Metro Vancouver’s plans to burn off the region’s waste rather than landfill it. Metro is slated to close the Cache Creek ditch in 2016.

“We’re still battling for alternatives that are far better than the incinerator,” said Russ Black, Belkorp’s vice-president of business development. “Regardless of Bylaw 280, we still wanted to demonstrate the true costs of this incinerator.”

The analysis, by ICF’s lead author Seth Hulkower, indicates Metro Vancouver significantly outperforming the revenue it would earn by selling electricity in the new incinerator into BC Hydro within a period of 35 years.

Metro had suggested it would seek to negotiate a cost of $100 per kilowatt hour from BC Hydro, but Hulkower noted the waste-to-energy business plan does not take into account that BC Hydro may correct the cost it pays for electricity after Metro recovers it capital outlay on the undertaking.

Metro Vancouver chairman Greg Moore said he is not surprised with the research’s findings, stating it’s a point that has long been contended by Belkorp.

But he said the research is early considering that Metro has at least 10 proponents offering different forms of waste-to-energy, such as district heat and gasification, and there are many potential scenarios.

“They’re persistent in pursuit of the agenda to continue to possess garbage going to their landfill,” Moore stated. “Until that decision is made I do not believe they’ll stop.”

Belkorp has a Coquitlam site where it proposes to construct a facility to take a”last pass” at waste to remove recyclables such as organics, plastics, paper and alloys, a movement that would ultimately rob the area of enough material to fuel a different waste-to-energy facility.

Black acknowledged multi-material recovery centers directly compete with incinerators however state that they make sense. “When you examine the range of prices, there’s some serious questions that need to be addressed,” he said.

Belkorp already has a Coquitlam site where it proposes to build a facility to take a “last pass” at waste to remove recyclables such as organics, paper, plastics and metals, a move that would ultimately rob the region of enough material to fuel another waste-to-energy facility.

Black acknowledged multi-material recovery facilities directly compete with incinerators but say they make sense. “When you look at the range of costs, there’s some serious questions that have to be addressed,” he said.

by: http://www.vancouversun.com/technology/Metro+incinerator+would+cost+billion+more+than+planned+study/10329525/story.html


Incineraot Msw2000


Basic Info.

Model NO.:MSW2000
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

MSW Model is newest design for municipal solid waste and other waste. This gear quality structural for kinds of site, like hospital, environmental division, animal cremation agencies, etc.. CLOVER Incinerator provide updated models with double combustion room, chinese cremator manufacturers, chinese incinerator, chinese incinerator photo, clinical waste incenarator machines in china, cloer incinerator, mix combustion room and smoke filter room with refractory lines, and the combustion room temperature up to 1200 deg C.

Items Specification
 Model MSW2000 / MSW3000 / MSW4000 / MSW5500
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Incinirator of Chemical Hospital


Basic Info.

Model NO.:incinerators for hospitals from china
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can utilize within this gear?  A: This gear for medical waste, pet animal, Municipal waste, reside waste. Prohibit any volatile and radiation material, liquid gas and waste waste.  GB18484-2001. 

Q: Remedy capacity  A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour)doesn’t indicate any waste material. Incinerator price, incinerator price for 50kg/hr made in china, incinerator producers, incinerator small scale, incinerator suppliers in china, incinerator baths china, The animal/pet combustion speed around 2/3 of average capacity. 

Clover incinerator utilize time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time plus time for feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year based on utilize. 

Ordinarily, we proposition small laboratory, small clinic use capability under 20 kgs per hour. If incinerator use in hospital, please calculate the waste output capability around 2kgs per people per day. If there are 200 sickbed in the hospital, that's mean you need 1 incinerator capability around 400kgs per day, switch to capacity per hour is approximately 30-40 kgs per hour. According the performance time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator.  *How to calculate Animal Cremation Burn Rate: 2/3 of this medical waste. 

Q: Assembly and Testing  A: We provide all documents and incinerators easy to setup and operation. Customer can send people come to our factory to learn installation and operation. Generally, we don’t send engineer to neighborhood website if not ask. The dispatch cost is additional based on order. 

Q: Combustion Temperature  A: The first combustion chamber: 800-1000 centi degree.  The second combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode  A: Default Control manner is common control case. PLC mode based on order and model. 

One person can service 02 device incinerators. The team should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower in accordance with performance user guider, and understand threat of medical waste to protect employee self with mandatory security element. 

Q: The Residency period in secondary combustion chamber  A: 02 sec.

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Hospital Waste Incinerator 200 Kgs Per Hour Capacity


Product Description

Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

costo del incinerador de cremación de mascotas


JQuery(record ).ready(function($) $.post(‘https://www.medicalmate.net/wp-admin/admin-ajax.php’, action: ‘mts_view_count’, id: ‘5585’);

Alimentación intermitente (con cargador opcional): 0,9 yd3 / h (0,7 m3 / h) hasta 8 horas / día

Especificaciones: Longitud total del sistema por lotes de -9′-6 ″ (2896 mm) sin cargador

18′-6 ″ (5639 mm) con sistema de carga opcional Ancho total -7′-6 ″ (2820 mm)

  1. La concentración media de dioxinas y furanos en las emisiones no debe superar los 80 ng / m3 de dioxinas y furanos totales.

Altura (sin pila) -10′-0 ″ (3048 mm) Aprox. (6364 kg) sin

Cargador

si se mide durante un período de 6 per 16 horas.

Nota:

Todas las concentraciones de contaminantes deben expresarse a Oo C y 1.013 x 10 5 N / m2, gasoline seco y corrección de 11% de oxígeno. Los materiales destinados a la incineración deben ser de origen y composición conocidos y deben

incinerarse únicamente en un horno que esté registrado para el tipo particular de residuo.

el mal funcionamiento debe registrarse en un libro de registro y notificarse a la autoridad competente.

autoridad.

11 Limpieza El sitio donde se construye el incinerador debe:

12 Salud y seguridad (equipo de protección) 1. El personal que manipula los desechos debe estar bien capacitado en el manejo seguro de

Desechos peligrosos

gafas de protección.

  1. Se debe mantener un registro de la cantidad, tipo y origen de los residuos a incinerar.
  2. El incinerador debe precalentarse a la temperatura de trabajo antes de cargar cualquier residuo.
  3. No se debe sobrecargar el incinerador.
  4. El incinerador debe estar en buenas condiciones de funcionamiento en todo momento y no debe usarse si falla algún componente. Alguna

);

  1. El operador del incinerador y todo el personal relevante deben estar capacitados de manera que satisfaga el control correspondiente.

JQuery(record ).ready(function($) $.post(‘https://www.medicalmate.net/wp-admin/admin-ajax.php’, action: ‘mts_view_count’, id: ‘5585’);

  1. Tener agua corriente.
  2. Tenga un piso sólido.
  3. Tener iluminación si funciona las 24 horas.
  4. Tenga las cenizas volantes en contenedores y almacenamiento antes de su eliminación.

Alimentación intermitente (con cargador opcional): 0,9 yd3 / h (0,7 m3 / h) hasta 8 horas / día

Especificaciones: Longitud total del sistema por lotes de -9′-6 ″ (2896 mm) sin cargador

  1. El personal debe contar con el equipo de protección adecuado, como máscara de gas, delantales, botas de goma, cascos, guantes,

18′-6 ″ (5639 mm) con sistema de carga opcional Ancho total -7′-6 ″ (2820 mm)

  1. Deben proporcionarse señales de precaución y advertencia.
  2. Se debe proporcionar equipo de extinción de incendios.
  3. No se debe fumar ni comer en el sitio.

Altura (sin pila) -10′-0 ″ (3048 mm) Aprox. (6364 kg) sin

Cargador

si se mide durante un período de 6 per 16 horas.