Big General waste heater Burn Price as much as 250kg per hr


2020-03-22

11000kg

External Dimensions

400x210x300cm( with no smokeshaft)

2020-03-22

Items/Model

TS300( PLC)

Concept

Waste Incineration Treatment

Melt Price

Requirement 250 kg/hour

Control Placing

PLC( Programmable Logic Controller Incinerator)

Burning Chamber

2000L

Inside Dimensions

170x120x100cm

2nd Chamber

1000L

Smoke Filter Chamber

Yes

Feed Establishing

Handbook

Voltage

220V

Electricity

2.5 Kw

Oil Infection (kg/hour)

Typical 28( DO)

Gas Consumption (m3/hour)

***

Infection Level Degree Monitor

Digital Present

Temperature Defense

Yes

Oil Storage Container

1000L

Feed Door

80x60cm

Smokeshaft

10Meter

Smokeshaft Kind

Stainless Steel

1st.

Gross Weight

HICLOVER – Medical Environmental 

11000kg


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

External Dimensions

400x210x300cm( with no smokeshaft)


Hiclover burner 100-150kgs per hour


Model

YD-100

Photo

Burning Price

100-150 kgs/hour

Trick Burning Chamber

2000 Liters

Secondly Combustion Chamber

500 Liters

Feed Establishing

Handbook

Voltage

220V/380V

Electricity

2.5 Kw

Gas Kind

Diesel Oil

Heating Unit

Italy Original

Oil Intake (Diesel Oil)

Average 28 kg/hour

Gas Use (Gas)

***

Inner Dimensions

180x115x98 centimeters (key chamber)

External Dimensions

270x185x280cm (without chimney)

Temperature Level Present

Yes

Oil Tank Capability( if petroleum gas)

200 Liters

Door Opening

55 x 80cm

Chimney Size

6.0 Meters

Smokeshaft Kind

Steel

Equipment Gross Weight

9000 kgs

Treatment Technical Specs

Primary Chamber Temperature Level

800 ℃–– – – -1000 ℃

Second Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Burning Efficiency

> 98 percent

Waste Lower Calorific Power


HICLOVER – Medical Environmental 

3500Kcal


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-22


Biomedical Waste Heater, 10-15 KG.


The machine provided will be made to store and to function normally under the requirements of
Chimney of 30 meters Height:
System Configuration
Maintenance Service during Warranty Period
Epoxy powder coated washable paint finish.
Average fuel consumption: ~29 kg per hour ( Or diminished )
Material: Insulation bricks confirming to international standard.
The bidder must submit diesel consumption for a daily operation of 6 hours.
The bidder must arrange for the equipment to be installed and commissioned by certified or
User (Operating) manual in English.
Power supply: 220-240 VAC, 50Hz single phase/400 — 420 VAC, 50Hz three phase as
above).
Type / Model:

Material: Refractory bricks confirming to international standard.
Modulation: Manual damper control
Type: Centrifugal
Material of Construction: Light steel.
Percent CO2 + percent CO
Temperature: Main Chamber 800 ± 50 oC, Secondary Chamber 1050 ± 50 oC.
Main Chamber:
Type: Centrifugal
It will have 3mm thick rubber lining from inside for security.
It will come with aviation , lightening arrestor, pile, drain, review platform, sampling
I.D. Fan:
Turnkey:
Installation and Commissioning
All compulsory approvals required for the installation and operation of incinerator will be performed
Insulation thickness: approx.115mm thick
Material of Construction: CRCA sheet
It will have acceptance of”Pollution Control Board” of buyer’s state.
Type: Cyclonic
Drive: Bel
Material of Construction: Stainless Steel 304, impeller and mild steel rubber lined casting
Documentation
Type: Static Solid Hearth
Parameters                   Concentration in mg/Nm3 (12% CO2 correction
It will have burning capability 10-15 kg/hr.
Second is a 500kg per/hr incinerator for a company planning to start a
Shall supply pump motor of suitable capacity.
Fuel Oil Storage Tank:
Destruction Efficiency: 99%.
Piping : PPR
Warranty
Fuel: Diesel
Bidder will submit detail drawings, design, and design plan of civil functions.
List of important spare Components and accessories with their part number and costing.
Scrubbing Media: Water with 5% caustic
Switches necessary for installation & commissioning of the equipment.
It will be self-supporting kind.
Burner: Monoblock fully automatic leftovers.


Heaters that may look after Bio-Medical waste crimson bag


heating units that may look after Bio-Medical waste (red bag) from laboratory with degree 2 in improvement to 3, household pet research study, as well as health.

Site 1– – – – 4,650 Kgs regular month-to-month (I have suggest that I put up two replacements at this area provided that It’s a clinical research study center in improvement to the use Is Actually large )

Web Site 2– – – – 1000Kgs each month (this facility bargains added with pet research study nonetheless additionally has red bag waste from their research study side, they have a Huge animal booze heating system)

Web Site 3– – – – 1000Kgs each month (this facility is a region medical care facility with bio-waste from dealing with individuals )


500kg/day thaw ability heater


at acinerator using 300 kg/ hr by twin filter wet and dry.Pet Cadaver Incinerator upto 80 kg, gas run resembles. Pet waste heating unit with ability pertaining to 40Kgs. We will utilize this item to thaw the creature is still equally technique (not ill aninal). Can you please beforehand me quote for heating unit which appropriates for alternative Neighborhood using a people of 200,000 people including various other conventional neighborhood waste to shed. Technical demands information sheet{
(adsbygoogle = window.adsbygoogle || []).push({});|}

Listing in addition to also cost of All of the spares known for annually{
(adsbygoogle = window.adsbygoogle || []).push({});|}
List in Addition to similarly quantities of consumables called for monthly

2 burners one with 500kg/day lose capacity an additional one with 1000kg/day thaw capacity

1 x Electrode

1 x Gas Filter

1 x Photocell

1 x Versatile pipeline

1 x Nozzle

1 x Control Box


eco satisfying burner


50 bed health care centre in addition to additionally would love to have your referral for heater that can properly take care of the lots of 50 mattress hospital.Incinerator for burnable rubbish (newspaper & & & & & & & & all-natural) gadget capability (100/150 lts). Bio Medical Waste Incinerators,

Capability: 50kgs a hr Medical Waste Burner Layout TS50 (PLC) with both choice on Gas (Gas as well as also / or Diesel2 Burners
1 Blower environmentally friendly burner for dropping polyproplylene bags we have 10 lots once a week


Little choice incinerator of falling capacity


Hen Burner – – – – – – – – 400 kgs feed a day.a small scale burner of shedding capability 30kg/hr= 1No. Be aware that it needs to be mobile as this is meant for oil regions service tented camps. It needs to be gas run as our area is remote. 150! Kg per human resources LPG electric burner for use at the global airport terminal. This is a requirement bu the biography security and protection along with security and protection as well as likewise protection that all Worldwide flights require all of rubbish sweltered within an identified time.Required entire lots capability is 150Kg
Chamber – – – – – – – – Primar 900 litres Added: 300Litres

Smoke Filter Chamber: Yes .


Heater ability of devastation of 350 kg/hour


– – – – – – – – Waste will probably be automatic feeding system directly into the burner.

– – – – – – – – Control plank will absolutely be fitted using a beneficial synoptic view disclosing the operating scenario of the entire

heater as well as also cared for by DCS/PLC system.

– – – – – – – – Heating system will certainly be made as a Packaged method, having electrical web link last as well as pre-wired pipes

in placing.

– – – – – – – – Control plank will absolutely be fitted using a valuable synoptic view disclosing the operating situation of the entire

heating system as well as likewise taken care of by DCS/PLC system.

– – – – – – – – TOC of slag as well as bottom ashes will absolutely be much less 3% of the completely dry weight.

– – – – – – – – Heater will surely be created as a Packaged system, having electric connection pre-wired as well as last pipes

in positioning.

– – – – – – – – Burner will surely have automated de-ashing system with higher instructions.

in position.

– – – – Incinerator will possess automated de-ashing system with upward direction.

– – – – Burner will surely have flue gas therapy system comprehensive [emergency scenario by-pass heap, gas heating system,

two activators as well as additionally particulates filtering method ] as well as assurance of discharges out of burner.

– – – – Training of AKU workers at website.

– – – – website could be assessed as well as likewise take a look at existing ATI maker, capacity 150 kg/hr. In 1 day therapy.

– – – – Existing facilities space is conveniently available in basement, 100′ ′ Size x 30 ′ large x 20 ′ Altitude for 2nd Incinerator.

– – – – Existing smokeshaft dimension is 12 meter, and additionally size is 24″ ″ dia.

common daily bloodbath involves 120 pigs. The Condemned thing along with additionally results in the abattoir for Entry is around 1000 kgs.daily{
(adsbygoogle = window.adsbygoogle || []).push({});|}