Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

lab biological waste incineration

1- There are more than 4000 Cubic Meter sludge are packed in Plastic Bags & stored more than 10 years
2- Cleaning and treated 2500 Cubic Meters inside the Oil Tank.
– the waste is biological and coming from lab, can be heavily hazardous in case of terror attack or epidemics or similar events.
– the input is low and occasional, the lab is used when terror or epidemy alarm occures. But occasionly incineration of human or animal carcasses can be demanded.mobile incinerator to work along with a mobile biolab for first responders.is the smallest incinerator available in the market. incinerator of capacities of 10kg/h and 20 kg/h for hospital waste.

Open tray burning wins out over Shut incinerator for M6 propellant in Camp Minden


The first of several public meetings regarding the disposal of over 15 million pounds of M6 propellant in Camp Minden attracted close to 150 concerned officials and citizens into the Minden Civic Center Thursday night.

There, they heard the arrangement reached between the Environmental Protection Agency (EPA) and the U.S. Army, which will finance the $28.5 million tidy from the illegally stored substance left by Explo Systems, Inc., predicts strictly for open air burning.

“Local contractors, the Maddens, made a device,” Webster Parish Sheriff Gary Sexton, that set up the meeting, stated. “For some reason, that device isn’t being considered in this clean up process.”

“We’re disappointed,” James Madden, proprietor of Madden Contracting, stated. Madden’s son, David spent time and money researching and building a prototype which would’ve allowed closed incineration of the product. “We considered we built a better mousetrap.”

But Madden may not be out of it yet. The Army must first design a bid package and undergo a procedure required by legislation to find a company to have the job.

“The Maddens can throw at a bid on the open menu procedure,” Sexton said. “They have the right to come in and I think they can do this.”

State Sen. Robert Adley stated while discussion regarding responsibility was taking place, the Maddens developed a plan to take care of this. Adley, along with others in the local delegation, attended a demo of the incinerator in Camp Minden past January. “We’re not professionals, but under legislation, by their interpretation, the EPA cannot use that procedure. I regret this, but it’s where we’re in this stage of the game.”

Adley stated that under existing legislation, the Louisiana Military Department and Maj. Gen. Glenn H. Curtis are all required to take bids from whoever supplies you.

“In the end of the afternoon he (Curtis) could sit down and decide who’s qualified, that has the experience and if they have the financial backing to get it done,” Adley said. “All of these things are going to be taken into consideration. It’d be fantastic if it was a person who, when they finish, will be sitting here breathing this air .”

David Madden seemed resigned to the EPA’s choice after attending an informal meeting with officials earlier in the afternoon.

“I have studied this procedure andyes, I did work for an incinerator,” he said. “I met with EPA officials and other experts not associated with the EPA, and they’re going down the right path with the open trays.”

Madden stated that his change of heart on the haste with which the disposal must take place to avoid more degradation of the product, which makes it increasingly dangerous.

“It’s important this get started the first quarter of next year,” he said. “I’ve looked in the air quality plumes (from open tray burning). Just 10 percent of this fallout will visit Doyline. There’s an equivalent amount heading toward Bossier and going north. Our business is about a mile and a half since east. We’re going to find some of this.”

“In my site and in my office, we’ll keep all the completely upgraded materials,” Reynolds said. “We’re going to keep (the people ) educated with everything that comes out from that point forward.”

Sexton emphasized the importance of the people’s help.

“Help us calm the fears of those people in the community about what we do not understand will happen with the destruction of the M6 propellant,” he said. “We may all agree on things that may happen, but we do not need to chat about what we need to worry about. The men and women that are going to be responsible — whoever the contractor is — the people which are going to be disposing of this product, keep them in your prayers because something could happen to the men and women that are responsible for going out there and opening those bunkers, choosing this product up, moving it and destroying it where we could live in a safer neighborhood.”

The upcoming public meeting is tentatively scheduled for Dec. 16. Time and location have not been determined.

“Help us calm the fears of the people in the community about what we don’t know is going to happen with the destruction of the M6 propellant,” he said. “We may all speculate on things that may happen, but we don’t need to talk about what we have to worry about. The people who are going to be responsible – whoever the contractor is – the people that are going to be disposing of this product, keep them in your prayers because something could happen to the people who are responsible for going out there and opening those bunkers, picking this product up, moving it and destroying it where we can live in a safer community.”

The next public meeting is tentatively scheduled for Dec. 16. Time and location have not been decided.

 

by: http://press-herald.com/open-tray-burning-wins-out-over-closed-incinerator-for-m6-propellant-at-camp-minden/


Adjumani Hospital incinerator blows up


ADJUMANI.

For the previous four months, support staff at the hospital have been dumping medical waste inside the enclosure of their incinerator rather than burning it.

The hospital administrator, Mr Michael Ojja, told Daily Monitor on Wednesday that the incinerator broke down due to continuous burning of collected waste from the hospital.

“The waste has increased as a result of the overwhelming number of admissions and people going to the outpatient department. But we must find solutions to protect the staff and surroundings,” Ojja said.

The hospital medical superintendent, Dr Dominic Drametu, said they had asked the government for construction of a new incinerator.

He said the incinerator was too small to dispose of their hospital’s voluminous medical waste.

Patients admitted to the general ward near the incinerator expressed fear of infections arising from poor disposal of hazardous medical waste.

As stated by the 2013-2014 annual health industry performance report, Adjumani Hospital registers 11,731 in-patients, 83,953 outpatients and 1,695 deliveries.


medical waste products burner



an incinerator suitable for chemcial waste containers. ability concerning 100 kgs per hr with a scrubber.1- One system of

medical waste materials incinerator
– – Ability: 100 kg–– Gas: gas oil

2 -One system of typical waste products burner – Capability: 150 kg
–– Fuel: gas oil this type of capability will be a waste burning central for a tiny city. you can locate various other

firm. our items primary for small waste output. for hospital straight, neighborhood at hospital, or portable/mobile

burner to one site when end-customer demand. incinerator without smoke and smelting for the setting.

capapcity 500kg per day. Could you define the factor of oil gas? By this you indicate gasoline or diesel?
with dieseil burner.we managed to get a walk in Algeria, and also we intend to export to other nations in Africa.
we define that we have an interest in mobile burners for medical facility usage.



Medical Waste Incinerators


Basic Info.

Model NO.:medical waste incinerator
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Product Description

TS version PLC incinerator is newest layout for waste treatment, include health care waste, animal cremation and other solid waste. This gear quality structural for types of website, like hospital, environmental department, animal cremation agencies, etc.. Pet cremation incinerators, mobile cremation furnace, mobile medical waste incinerator manufacture companies in china, red bag waste incinerator, CLOVER Incinerator provide updated models with double combustion chamber and smoke filter chamber with refractory lines, along with the combustion chamber temperature up to 1200 deg C. 

Nanjing Clover Medical Technology Co., Ltd.. Is a top waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator gear technical is primary waste treatment each one the planet, for Medical waste, Pet animal cremation and other Solid waste. The capacity from 10kgs/Hr. To 600kgs/Hr. Up to 10ton daily.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Clover's Social Media