Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
County scraps plans for waste-to-energy incinerator
The Board of County Commissioners struck plans Thursday to get a regional waste-to-energy incinerator, preferring to haul the county’s waste into a landfill with a short-term contract rather. Commissioners Paul Smith and Billy Shreve cast the dissenting votes to keep the project on the dining table while the county explores its options.
“It is absolutely no charge to the county to keep these options available,” Smith stated. “To do away with these options is mad.”
Terminating the project won’t cost the county any money as the Northeast Maryland Waste Disposal Authority, a quasi-governmental agency which helps the county fulfill its trash disposal needs, will pay the $500,000 conclusion fee. Any remaining funds after this payment is going to be divided between Frederick County and Carroll County, which was a partner in the project. These funds are out of obligations the authority has obtained from Wheelabrator after the service contract was executed in 2010.
However, Young said that he saw no purpose in voting to keep plans for an incinerator, which would burn garbage into energy, open because County Executive-elect Jan Gardner intended to scrap the facility after taking office Dec. 1. Young stated.
County Attorney John Mathias stated Gardner held the power to determine the fate of the incinerator project, not the County Council, when a decision was not made Thursday.
“I believe that you should terminate the entire thing,” Gardner testified in front of the plank and approximately 100 people gathered at Winchester Hall, garnering some applause.
The board unanimously voted in favor of transporting the county’s crap into a out-of-state landfill for $50.95 per ton with a highest last-minute contract.
After considering five suggestions, including three out-of-state prices and two waste-to-energy facilities outside Maryland, the commissioners narrowed their options between two landfills with varying contracts.
Commissioners formerly leaned toward the first option, which provided contracts stretching 25 years at an average of $54.97 per ton, though this cost might escalate annually with the consumer price index and gas rates. On the other hand, the board chose the second option, which Gardner also preferred.
About 30 people testified in front of the board concerning the incinerator project, with a bit more than half in favor of scrapping it and the rest advocating for maintaining the project on the desk to consider it more intensely.
“The incinerator is a waste of energy, a waste of resources (also ) a waste of cash,” Brunswick resident Ellis Burruss testified. “It would be good not to waste any more time .”
Other inhabitants noted that the proposed location of the incinerator, near Monocacy National Battlefield, would ruin the playground ’s tourism and beauty.
However, resident Greg Brown voiced his support for a regional incinerator, supposing it was more environmentally friendly than the other options commissioners were considering.
“Even the top landfills … are at least three times more pollutant than the usual waste-to-energy facility,” Brown stated.
Another resident stated Europe has been constructing waste-to-energy centers for years with no unwanted effects that many have brought up.
“I was actually with this (incinerator project), but with all the energy prices and Carroll County falling out … that I ’m not,” Delauter said, echoing the thoughts of Young and Gray.
Another resident said Europe has been building waste-to-energy facilities for years without the negative consequences that many have brought up.
Jim Warner, CEO of the Lancaster County Solid Waste Management Authority in Pennsylvania, pitched a proposal for hauling the county’s trash, but the commissioners decided to go with an undisclosed out-of-state landfill with a short contract.
“I was actually for this (incinerator project), but with the energy prices and Carroll County dropping out … I’m not,” Delauter said, echoing the sentiments of Young and Gray.
Clover Incinerator
Product Description
The factory workshop local in liuhe Economic Development Zone, suburb of Nanjing and company office local in downtown region. Presently, incinerator line goods marketplace cover former Soviet Union region, Africa countries, Asia countries and Middle East region. From year 2010, we negotiated with updated technology from Europe and America manufacturers and establish alliance relationship in the land of China marketplace. Unfortunately, competition in other countries marketplace, nation discrimination and worries of intellectual property rights cause failure eventually. Presentlywe investment more attempt, funding and technology development in our own brand, we’re to be among the most significant incineration equipment in the world. We have trading division company for expert export company support.
Incinerator is a incineration gear, direct fire waste from gasoline fuel or oi fuel. As different circumscription, incinerator could be named many words as under:
Therapy capacity: Small scale incinerator, big scale incinerator and incineration pant.
Waste substance: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, individual cremators
Incinerator fuel: Gas incinerator, oil incinerator
Waste to Energy (WTE): WTE incinerator, non-WTE incinerator
Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.
Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India)
Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
1st. Chamber Temperature | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree |
2nd. Chamber Temperature | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
Incinerators for Medical Waste Disposal
Product Description
TS model PLC incinerator is newest layout for waste treatment, include medical waste, animal cremation and other solid waste. This equipment quality structural for kinds of site, cremation incinerators, cremation manufacturing company, cremation manufacturers, cremation of animals in malaysia, cremator burners, crematoriam incinerator, crematorium animal, like hospital, environmental division, animal cremation services, etc… CLOVER Incinerator supply updated versions with dual combustion room and smoke filter room with refractory lines, along with the combustion room temperature up to 1200 deg C.
Key Features: * All versions with Dual combustion room. * Stainless Steel chimney/stack, long life. *according to sequence * High fever, long life of incinerator. * Free or minimal installation on site. * High speed, from 10kgs to 500kgs per hourto 6ton per day. *according to order * New Design for pet animal cremation business. * One year guarantee on incinerator and components in stock.
Program Scope: 1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine. 2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste. 3. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation
Items/Model | TS50(PLC) |
Picture | |
Burn Rate | 50 kg/hour |
Feed Capacity | 100kg |
Control Mode | PLC |
Combustion Chamber | 560L |
Internal Dimensions | 100x80x70cm |
Secondary Chamber | 280L |
Smoke Filter Chamber | Yes |
Feed Mode | Manual |
Voltage | 220V |
Power | 0.7Kw |
Oil Consumption (kg/hour) | 12.1–24 |
Gas Consumption (m3/hour) | 9.9–26.1 |
Temperature Monitor | Yes |
Temperature Protection | Yes |
Oil Tank | 100L |
Feed Door | 70x55cm |
Chimney | 5Meter |
Chimney Type | Stainless Steel |
1st. Chamber Temperature | 800degree–1000degree |
2nd. Chamber Temperature | 1000degree-1200degree |
Residency Time | 2.0 Sec. |
Gross Weight | 4500kg |
External Dimensions | 230x130x155cm |
burning 150 kg of waste incinerator
In an attempt to bring a partial relief from the mounting waste disposal difficulties, a new incinerator will start working at the Kozhikode Medical College soon.
The incinerator has been installed using the fund from the Hospital Development Society (HDS).
HDS member Saleem Madavoor advised’City Express’ that the society has allotted’15 lakh towards the expenses which will be acquired for the installation functions.
An official of the medical school said that an expert group, deputed by SIDCO, has seen the medical school to review the primary arrangements.
The work order has been given to SIDCO and an agreement was signed between the medical college authorities and SIDCO officials three weeks back.
The medical school official added that the functions of the incinerator are finished and setup works will start within couple of days. When the new incinerator begins operating, the waste disposal issues will be partially addressed. The incinerator which has a potential of burning 150 kg of waste, will dispose of the residue generated by the medical college hospital.
Meanwhile, the medical school will continue to grapple with the waste being produced from the Institute of Maternal and Child Health (IMCH) and Super Specialty block because the incinerator for these cubes, which are suggested at a price of’63.5 lakh by the state authorities still remains on papers. If the incinerator becomes a reality around 5,000 kg of waste could be disposed regular.
advice from: http://www.newindianexpress.com/states/kerala/Waste-Woes-Medical-College-Gets-Partial-Relief/2015/07/17/article2924500.ece
Hazardous Waste Incinerators
Basic Info.
Additional Info.
Product Description
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
We, Clover Medical Limited, Located at China mainland.