Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

HIGH TECH PYROLYTIC MEDICAL WASTE BURNER


NB.; Civil functions as well as any various other applicable solutions for the installation as well as training of drivers need to be contained in the burner’s rate.

Requirements for the shelter of the burner:

House of the incinerator comprehensive in deal (your home should have toilet as well as hand washing centers as well as firefighting). The size of the shelter shall quantify 4 meter by six meter and will be provided with appropriate air ventilation.

This substance as well as equipment should include at the drop of the burner: foundation in debris stone, isolation roof covering versus humudity; elevation together with block of 20 centimeters (bloc concrete), continuing lintel (linteau) in strengthened concrete; steel frame (charpente en alloy ); roofing covering in sheet B.C.A. 28 BG

25. The technical training of drivers will need to be supplied and provided by a professional from the.
> Nature: Calcium silicate.
6. The incinerator has to avoid the launch of black smoke as well as fine dust, (Smokeless) throughout the.
8. It should be able to hold exhaust at the next burn with gas residence of not much less than two seconds.
* A timer with adjustable temporization for the coverage of every heater.
– The Temperature levels of combustion: Minimum will be 850 ° C as well as maximum 1400 ° C. – Message combustion: > 1100 ° C.
Temperature outside sheet steel.
Control box watertight to grime, such as:.
Ought to be Automatic or hand-operated put de ashing. Refine Filtering system: Scruber to be mentionned as optional

23. Discharge Standards Compliance: BS 3316 or comparable conventional

23. Ability to treat Plastic: Not less than 40% by weight

24. The provider should give sets of additional parts of very first necessity as well as consumable of these.
Having a high substance of aluminum and shields blocks in order to make sure a minimum.
* A regulatory authority with watch for the temperature of postcombustion.
Carried out by valves as well as following the constraint of the automatic cycle. Controls as well as guidelines:.
valve.
* An extra shot of air to be sure excellent oxygen web content.

19. A control box which makes certain the whole cycle of combustion. Fan:.
* A regulator with watch to your temperature level of combustion,.
>> Thickness: > 85 mm.
5.
* Perfectly tight doorway to the hand-operated loading of waste. The loading ought to be Guidebook, Place.
* Plate of burning Carborundum, preventing the dealing with glass as well as slags.

18. A chamber of post burning of gases.
* Carcass in strong sheet steel with help of link.
10. The lower volt electricity (L.C.P) of this waste will surely be 3,500 kcal/kg.
incinerator. The installed burner has to birth a 1 year warranty.
> Thickness: > 100 mm “.
>> Character: 65% of A1203.
14. Heater procedure need to be Automatic On/Off.
– Protect in fibrous panels.
* A gadget of shot air allowing a entire recombustion of gases,.
Private centers, research labs, institutes, etc…….
2. It should Be Able to operate not less than 10 hours/day

22. The supplier should give sets of extra parts of very first necessity as well as consumable of the.
incinerator.

23. The installed burner has to birth a one year warranty.
24. The supplier will perforn an onsite installation of the burner.

25. The technical training of drivers will need to be provided and also provided by a professional from the.
manufacturing facility; it will certainly consist of medicinal as well as precautionary maintenance, and making use of equipment, etc

NB.; Civil works as well as any various other relevant solutions for the installment as well as training of drivers need to be included in the burner’s rate.

Requirements for the shelter of the burner:

House of the incinerator comprehensive in deal (your house must have toilet as well as hand washing centers and also firefighting). The dimension of the shelter shall measure 4 meter by six meter and shall be offered with appropriate air ventilation.

This material as well as equipment must include in the shed of the burner: foundation in debris rock, isolation roof covering versus humudity; elevation with block of 20 centimeters (bloc concrete), continuing lintel (linteau) in strengthened concrete; steel framework (charpente en metal); roof covering in sheet B.C.A. 28 BG


Medical Burner Manufacturers at Supply all set for delivery


Medical Waste Incinerators in Stock. Twitter: https://twitter.com/hiclovercom Phone/WhatsApp/Wechat: +8613813931455, Web: www.hiclover.com Web: www.clover-incinerator.com

Double Combustion Chamber,Double Italy Burner,Smoke Filter Included,Burning Rate: 50-200kgs per hour optional,Primary Combustion Chamber: 1.57M3(1570Liters),Incinerator Mainbody steel: 8mm thickness,Paint for outside face: 800°C Rate,Chamber Material: High Alumina Fire Brick Wall, 1750℃ Rate,Idea for campsite average or below 600 people,Chimney: 10 Meters, Stainless steel…

Items/Model

TS150( PLC)

Picture

Idea

Waste Incineration Treatment

Melt Rate

Typical 150 kg/hour

*( 50/100/200kgs/ hour optional)

Feed Capability

Requirement 750kg/feeding

Control Establishing

PLC( Programmable Logic Controller Incinerator)

Text Steel

8mm density

Chamber Product

High Alumina Fire Block Wall Surface, 1750 ℃ Cost

Paint for outdoors experience

800 ° C Price

Burning Chamber

1570L

Internal Dimensions

150x100x105cm

Second Chamber

750L

Smoke Filter Chamber

Yes

Feed Establishing

Guide

Voltage

210/230V 50/60Hz

Electricity

0.9 Kw

Oil Intake (kg/hour)

Ordinary 20.4-28.0( D.O)

Gas Intake (m3/hour)

***

Infection Degree Present

Digital Display

Temperature Level Safety

Yes

Oil Container

300L

Feed Door

80x60cm

Smokeshaft

10Meter

Smokeshaft Kind

Stainless-steel

1st. Chamber Temperature Level Degree

800 ℃– – -1000 ℃

2nd. Chamber Temperature

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

8500kg

Exterior Measurements

HICLOVER – Medical Environmental 

300x160x280cm( without smokeshaft)


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-10


An Unexpected Ebola Infrastructure Problem: Waste


Patients for this debilitating virus create 440 gallons of medical waste every day, including instruments, dresses, gloves, body fluids, sheets, mattresses and much more. That is a substantial number of medical waste in any circumstance, but it is particularly daunting in this case because it ought to be disposed of extremely carefully, to avoid the chance of spreading infection. What do you do with a problem such as Ebola waste? Because you don’t want to toss it in the garbage.

Somewhat surprisingly, states Bausch, the United States actually faces bigger problems in regards to safely disposing of Ebola waste, which can be only burned in large pits in Africa:”In the United States, naturally, we’re somewhat beholden to higher tech solutions, which in some ways are a tiny bit more problematic in terms of handling all that waste, and we need autoclaves or incinerators that can handle that type of thing. It’s not the actual inactivation that’s particularly difficult; it is just the process of finding the waste out of, of course, that the frontline of care and interaction with the patients safely to the location where it can be incinerated or autoclaved.”

The problem in the United States is ironically compounded by the increased accessibility to healthcare, and the high quality of healthcare services, available. In the United States, patients have been treated by medical teams with access to a massive volume of equipment they use for protection, including masks, gowns, booties, and gloves, along with sanitizers and other tools. Moreover, patients get extensive medical interventions that create waste such as tubing, needles, medical tape, empty IV bags, and much more. The care that has helped the majority of the number of Ebola patients in the United States conquer the disease has contributed to the huge quantity of waste generated, highlighting a critical hole in U.S. medical infrastructure — although African American hospitals may have lacked the staff and supplies required to provide aid to Ebola patients, they are at least prepared to handle the waste.

The CDC just issued guidelines to help clinicians and administrators decide upon how to handle Ebola squander, but The New York Times notes that lots of facilities do not have the autoclave, and incinerator, capacity to handle medical waste on this scale. Some countries prohibit the burning of medical waste entirely, or have barred incineration of Ebola waste, leading to the transport of waste across state boundaries to facilities that can handle it, which introduces its own dangers; with every mile added to transport, there is a greater danger of spreading disease to previously unexposed communities.

Astonishingly, defenders of burning the garbage come in surprising corners. When you are dealing with pathogenic and biological hazards, occasionally the safest thing to do is combustion.” Fears about Ebola, rather than real ecological or public health concerns, are forcing the decision to push incineration of ebola squander in several areas, but the United States will have to face reality: The mounting waste that accumulates in facilities where Ebola patients get treatments has to be disposed of safely, safely and immediately.

The argument in defense of incineration can be bolstered by the fact that medical waste companies specialize in high-efficiency incineration with equipment designed to minimize and trap byproducts of combustion, reducing overall pollution considerably. Fears about Ebola, rather than genuine environmental or public health concerns, are driving the decision to push against incineration of ebola waste in many regions, but eventually, the United States is going to have to face facts: The mounting waste that accumulates in facilities where Ebola patients receive treatments needs to be disposed of safely, and promptly.

 

by: http://www.care2.com/causes/an-unexpected-ebola-infrastructure-problem-waste.html


Incinerator 300 Kgs


Product Description

Nanjing Clover Medical Technology Co., Ltd., local in Nanjing city, China.

Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

 

castable high quality refractory lining and incinerator shell

The incinerator shall have chimney, castable high quality refractory lining and incinerator shell, perforated blind for the primary and secondary combustion chambers and air circulation system.

The incinerator shall also have the following:-
•    Ash door
•    Primary and secondary burners and fans
•    Temperature indicator devices
•    Electrical wiring from the local isolator
•    FD fan
•    Air receiver
•    Air ductwork complete with air dampers
•    Pressure and temperature gauges
•    Fully wired control panel

The bulk oil storage tank shall have a capacity of 10,200 litres and be placed at 0.5m above ground on a firm concrete cradle, complete with the following:-
•    Drain pipe
•    Vent pipe
•    Oil level indicator
•    Access ladder to the top of the tank
•    Coating of the tank with at least 2No. coats of bituminous paint
•    Manhole cover complete with a gasket
•    Dip stick
•    Any other necessary accessory.

E-2

The daily oil tank of capacity 1,800 litres and size 1220x1220x1220mm pressed steel tank high shall be placed 2.5 metres high above finished floor level on a steel stand, firmly secured on the ground and the steel members to be bolted.  The daily oil tank shall have an oil level indicator, access manhole, washout, overflow, inlet and outlets connections and gate valves.

The interconnecting pipe of 50mm diameter between the two tanks shall be class ‘C’ black mild steel pipe, complete with a 50mm diameter strainer.  The burner fuel supply pipe from the daily tank shall be a 25mm diameter class ‘C’ black mild steel.

The following shall also be supplied
•    25mm diameter fire valve
•    25mm diameter high capacity strainer
•    heating tap along the burner supply pipe, 25mm diameter

The burner supply pipe shall have 25mm thick fibre glass insulation and finished with gauge 20SWG galvanised steel sheet.

The tenderer shall provide all the necessary controls for proper safety and satisfactory working of the installation.

1.1.1    BURNER

The burner shall be suitable for 35 sec redwood No. 1 scale fuel oil.  It shall be robust in construction and be manufactured in cast iron or other suitable materials complete with mounting plates.  It must be easily mountable and demountable for ease of cleaning and maintenance.  The burner shall have an adequate supply of oil which will readily ignite and burn in a safe manner.  Adequate provision shall be provided to prevent any solid matter in the oil, or any matter that may separate out from the oil from damaging any components or chocking of any orifices or valves.  The free filtering area should be sufficient to ensure that the filter does not need dismantling for cleaning more often than once a year. The burner shall have flame supervision by photo-electric cell with synchronous sequence controller for automatic start up, running and shut-down of the burner.

The burner shall have all the necessary controls e.g.Solenoid valves, ignition controls, photo electric cell fuel safety controls, low pressure fuel supply cut-off etc.

The burner shall conform to BS 799: part 3 and 6 1981 or any other relevant British standard.The burner shall be as NU-WAY models or equal and approved.

1.1.2    CONTROLS

The incinerator shall operate in an automatic manner with all the necessary controls.  These controls are to include safety elements such as flame failure unit, pilot lamps, fuses, starters, overload contactors, ON and OFF switches for burners and fans, combustion chamber temperature indicators for primary and secondary chambers etc.

i)     Electric ignition switch ‘ON’ before the oil is supplied
ii)    Delayed return to re-start position to allow purging
iii)    Re-start after temporary electric supply failure
iv)    Positive safety lock-out in case of flame failure from whatever cause.
v)    Red signal light on control panel to indicate safety lock out
vi)    Photo electric protective cell as flame failure device.

The controls shall be mounted on suitable control panel to be installed in a position easy to read and control from the charging door side of the incinerator.

The control panel shall be fabricated from anodized, 16SWG, mild steel sheet.

Clover's Social Media