Heat Waste Incinerator Design D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimal Weight( Kg) -4000 kg Additional Chamber
(double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, single
stage 50-60Hz Minimum working temperature amount 1200 oC One year spare parts bundle for total maintainability 10m pipe
pipeline. 1100 litre fuel Storage tank +pipeline system Containerised (the container will surely act as home ) Added chimney expansion
1 metre high One (1) year guarantee.
Burner of 20 Kg: 03 Devices
Electrically controlled burner.
Two-compartment burner having a power of 20 pound / hour.
Incinerator with decreased upkeep and operating costs; Geared up having an automatic control panel in addition to very easy to make use of with
electro-magnetic locking of the door.
A primary waste decrease chamber of 900 ° C. A blog article minute burning chamber of gases created in the primary room
at least 1100 ° C.
Carbon residues in ash less than 5 percent by weight based on European Directive 2000/76/ EC.
With refractory mobile lining in goods of higher quality
2/ (CIF Term) Price of shipping from manufacturing facility to PAPUA NEW GUINEA port of LAE, Morobe province
3/ Price of two Clover engineers to Supervise, Installation, Training our engineers and appointing the medical; squander
incinerator.