Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

pet crematorium equipment


Finally, steam to  the jacket should shut off, the unloading door is to be opened

Then the shaft and mixing arms are reversed to act as unloading mechanism and should scoop the waste fragments out of

the unloading door, onto a conveyor belt or directly into a waste container.

The vessel should now be ready for another treatment cycle, having retained most of its heat for the treatment of the

next batch.

(B)Features and Specification of the Steam Boiler:

Features of the Boiler:

It must be an Electrical boiler

Splash proof electric enclosure and switches

Door Isolator to main electric enclosure

Alarm lights and Safety/protection against excel pressure

Level control on feedback water tank

Technical specification of the Boiler:

Output: between: 90-110 kg/h (F&A 100 deg C)

Working pressure: between 7-10 bar

Boiler water content: between 80-100 liter

Feed water tank content : between 60-80 liter

Power consumption: between 60-75 Kw

Number of Heating Elements: 3-4 nos.

Electrical requirements: 400Vac, 50 Hz, 3 ph

(C)Technical Specifications of Tub washer

Features:

Fully automatic and manual modes.

Metal construction, SA 240/304

Sensors to maximize both machine efficiency and operator safety.

Must use Re-circulating cold wash water to minimize water consumption and operating costs

Disinfects all bin surfaces

Uses Powerful blow dryer to remove excess surface water

Must be compliant with all North American and EU regulations

Specifications:

Tub washer able to wash bins of a suitable size , the norm being 38 g

Must have an water reservoir of capacity minimum : 225 liter

Perfectly suited for hospitals and clinics by processing up to min.300 bins per hour.

Time to wash and dry one bin after loading-approximately 12 nos.

Bins loading on wash station at a time -approximately 12 nos.

Overall length: approx 30.0 feet

Overall length: approx 8.0 feet

Overall length: approx 3.0-3.5 feet

Height to Conveyer from ground: approx 3 feet.

Drive of the Tub washer

Motor driven

Motor Horsepower : approx. 4.0 HP

Power : 220vac, 1 ph or 400 VAC , 3 ph or to suit customer needs

Bins to be included

200 nos. with different color (based on the actual requirement of the hospital)

(D)Technical Specification of External SHREDDER Controls

Pre-programmed PLC controlled

Password activated and reversal history indication

Motor starter with overload protection

Automatic instantaneous stop on hard object in shredder bed

Automatic heavy cutting load reversal and re-try , up to three times

Control housing Nema Type 12

Cutting Hardwires

Chamber Dimensions (W x L x H): approx. 33 cm x 38 cm x 25 cm

Number of Knives: approx 18 or to suit customer needs

Knife Thickness : approx 18 mm or to suit customer needs

Knife Diameter : approx 16 cm or to suit customer needs

Teeth per Knife: minimum 3

Number of Shafts : 2 ie double shaft shredder

Drive of the shredder

Must be motor driven

Motor Horsepower: approx. 10 HP

Motor RPM: minimum 1750

Speed Reduction : 60:1

Generated Torque : min 40 Nm or 350 Ibs/in.

Gearbox: should be Parallel shaft

Shock Protection: Rubber Mount Torque Arm

Power: 220vac, 1 ph  or 400 VAC , Ph or to suit customer needs

Ancillaries to be included

Shredder stand, fabricated from 3” sq. steel tube, standard height 30 inches

Shredder hopper , fabricated from 16 gauge steel, with optional switched hopper lid

(E)Features & Technical Specification of Conveyer

To carry processed waste from vessel to shredder

Controls

Motor starter with overload protection

Control housing Nema Type 12

Safety pull-stops along both sides of conveyer

Ancillaries

Conveyer stand, fabricated from 2” sq. steel  tube

Raised sidewalls fabricated from 16 gauge steel

Dimensions

Over-all length: between 20-25 feet or appropriate length depending on the installation requirement.

Over-all width: between 24-30 inch

Over-all height (without including stand): between 12-14 inch

Available inclines:    0-40 degrees

Belt Speed: 75 ft/min

Dam spacing: approx. 16 inch

Drive

Motor driven

Horsepower :approx. 0.75 HP

Motor RPM: approx. 60

Electrical Power input : 220vac, 1phj or 400 VAC , 3 Ph or to suit customer needs

(F)Technical Specification of Tipper

Features:

It is to be designed to allow for easy bin positioning under the door to unload processed waste and easy

maneuverability for lifting and tipping the waste into the shredder hopper.

Equipped with 2 binds to accommodate processed waste loads to be loaded into the shredder and shredder waste to be

transported to the disposal bin.

Frame: Rugged heavy duty frame constructed of formed and welded steel for extra strength

Mast: Fabricated with cannel steel for greater strength and dependability. Open structure design complete with safety

cage to offer greater visibility.


HICLOVER Heater mobile Small With Horsepower and Brake


Model

YD-30 Mobile Kind

Picture

Burning Price

Regular 30 kgs/hour

Feed Capacity

Common 60 kgs/feeding

Chamber Text

Stainless-steel

Mobile Attribute

With Wheel and similarly Brake

Main Burning Chamber

280 Liters

Second Combustion Chamber

150 Litres

Mix Burning Chamber

Yes

Feed Setting

Handbook

Voltage

220V

Electricity

1.5 Kw

Gas Kind

Diesel Oil

Burner

Italy Original

Oil Consumption (Diesel Oil)

Criterion 13.3 kg/hour

Internal Dimensions

80 x 60 x 60cm (major chamber)

External Capacities

125 x 90 x 260cm (without smokeshaft)

Temperature Level Degree Current

Yes

Oil Container Capacity( if oil fuel)

100 Litres

Door Opening

50 x 50cm

Smokeshaft Size

2.0 Meters

Chimney Type

Stainless-steel

Equipment Gross Weight

1600 kgs

Operation Technical Specifications

Key Chamber Temperature

800 ℃–– – – -1000 ℃

Additional Chamber Temperature

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Burning Effectiveness

> 98%

Waste Lower Calorific Power

3000Kcal


HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-28


Waste incineration market power is Extreme level of appropriate centers to be Fostered


[China] Solid Waste Environmental online waste incineration areas development momentum is difficult, in addition to additionally the cleverest of resources going after also appear various times from the in 2014 the speed of handling cost diving, subject raised concerns regarding the vicious rivals. “Thirteen 5” throughout crap construction and also construction and building market financial investment room at 1000 billion yuan; the enlarging trash incineration capability of the process of the center, the controling degree problems. Fantastic deals of industry firms asserted in easy incineration web links, marketplace competitors is also ferocious, competitive specialist ventures need to play in the region of business designs along with technological advancement.

Waste incineration area energy is difficult level of related centers to be fostered

“Twelve 5” is a fast-growing garbage incineration 5 decades. According to suitable advice, in 2015, the nationally city in addition to region has gathered trash incineration capacity of regarding 233,000 tons / day. Waste incineration markets innovation energy is intense, in addition to the cleverest of financing chasing even appear many times in the in 2014 the price of handling charge diving, marketplace raised concerns concerning the vicious competitors. That is still employed as the principal ways of land fill waste, largely as a consequence of the regional governments in charge of looking after the operations, the sector is low, continue to be “reduced key. ”

The near future will remain to warm up a cold do?

Hereof, some specialists explained that, on the 1 hand, waste incineration will remain to broaden, yet the quantity of qualitative and build-up renovation of equivalent importance, particularly waste incineration sparks formal implementation of new demands for therapy of the facility combined with established greater demands; on the several other hand land fill as a vital and also irreplaceable source, remains looking after the mainstream. To discover out the continuing to become storage area ability, make great use of outstanding monitoring will definitely come to be crucial; in the specific same time, non-canonical remodeling land fill, contamination, and so forth similarly brought closure to fix the essential market chances.

According to the replacement manager of this Confirming floor for Ecological Wellness Design Division of Housing and also General Employees Liujing Hao debut, facility upgrades is going to be the next five decades, necessary material. “China’s powerful waste disposal facilities (garbage dump, incineration plant) construction and also development is actually promptly, there are a range of construction along with operation of this facility has a massive location for improvement. There are a number of old crap disposes need to conserve combined with upgrade, so as to not pollute the surrounding atmosphere. A number of the early construction and also construction of incineration plants need to be upgraded or reset. ”

Incineration facilities remains climbing

“Thirteen 5” during squander construction market investment area in 1000 billion yuan; the expanding trash incineration capacity of this process of the center, the regulative level obstacles.

‘‘ ‘ ‘ Facilities’ next five ‘strategy typically completed the objective. “China Urban Environmental Wellness Association and vice head of state, manager of the Research Center for Environmental Health And Health Design Department of Property and also Xu Wenlong claimed that based on ” the “2nd 5” nationally city national trash treatment facility construction plan, “apparently incineration task the general dimension of 307,200 loadsdaily. Though conclusion of 2015, the across the country total incineration capacity of 233,000 amounts / day, nevertheless the dimension of this task currently incomplete there of about 10 tons/ day, in addition to generally end up the preparation along with construction and also building scale.

Planning and completion of top enthusiasm funding markets has a direct alliance. Building along with process of waste incineration centre has really turned into one of the markets of sources chasing after the celebrations, after the project in a constant increase to demanding “fight. ”

The complying with 5 decades, incineration facilities construction in addition to building market remains large? In this regard, the Executive President of the Institute of E20 Xue Tao considers that incineration facilities will preserve growth. “In the construction and construction of crap ‘‘ ‘ ‘ Thirteen Five’ duration, more than probably from the fiscal investment market area, developing region goes to 100 billion yuan. ”

Xu Wenlong considers that brand-new market does still have a better chance. Presently, a lot of the city in addition to also the majority of the region’s garbage can be efficiently gathered in addition to similarly therapy and likewise refuge in sanitary land fill in addition to additionally incineration plants. Still there are gaps in garbage disposal facilities, the new facility remains among the substantial jobs of the existing as well as additionally the following five-year method. “According to this relevant nationwide preparation, the nationally MSW incineration capacity in 2020 will exceed 40 lots/ day in 2025 roughly 50 loadsdaily. By then, China’s demand for incineration facilities will surely reach a reasonably safe and secure condition. ”

Accumulation from the proceeded qualitative augmentation already begun. By January 1 this year, all of new country, has been running rubbish burner need to execute a new “waste burning dirt controller needs ” (GB18485-2014) (hereinafter called the new standard) of exhaust constraints. Brand-new demands for traditional contaminants, dioxin contamination contrasted to the previous standard have a lot extra inflexible needs. {
(adsbygoogle = window.adsbygoogle || []).push({});|}
{
(adsbygoogle = window.adsbygoogle || []).push({});|}

[China] Solid Waste Environmental online waste incineration areas development momentum is difficult, in addition to additionally the cleverest of resources going after also appear various times from the in 2014 the speed of handling cost diving, subject raised concerns regarding the vicious rivals. “Thirteen 5” throughout crap construction and also construction and building market financial investment room at 1000 billion yuan; the enlarging trash incineration capability of the process of the center, the controling degree problems. Fantastic deals of industry firms asserted in easy incineration web links, marketplace competitors is also ferocious, competitive specialist ventures need to play in the region of business designs along with technological advancement.


incineration combustion chamber


Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labour

and heavy duty equipment shall be provided by CEB.

 

 

?     The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its procedures for the

installation of the incinerator and exhaust chimney. This should include all mechanical, civil and electrical drawings

and detailed methodology for successful installation of the incinerator set. It shall also include preliminary tests

that have to be carried on the incinerator unit. .

 

?     The successful Bidder shall provide all necessary test equipment ( test kit for emission measurements) for

carrying out of tests during testing & commissioning of  the incinerator set. . The successful Bidder shall be

responsible for the satisfactory completion of all tests and remedial action in case of any anomaly. Corrective action

by the successful bidder shall be prompt and to the satisfaction of the CEB Engineer.

 

?     Scheduled date for commencement of supervision of installation, testing & commissioning works shall be mutually

agreed between the successful Bidder and CEB

1 Burning Capacity 200 kg/hr

 

2 Chamber Dual

 

3 Fuel Source type Gas

 

4 Optional fuel source Diesel ( Rate to be quoted separately)

 

5 Temperature ? Range:

 

Min: 900

 

Max: 1500

 

Must have

 

? Temperature Monitoring/ Thermostat Control/

 

Constant Run Fan

Hospital waste incinerator

Capacity: 50 Kg / Hour

Brand new complete working

Burners: Diesel (Preferably dual gas / diesel)

Primary and secondary chamber

Environment friendly

Manual loading and unloading

WASTE INCINERATOR

 

–          150 KG/HR

 

–          Compliant with EU rules, Directive 2000/76/EC

 

–          Fuel type: Diesel

 

–          Easy management and maintenance

 

–          Temperatures:

 

850 deg C for municipal waste

 

1000 deg C for medical waste

 

1100 deg C for dangerous waste containing halogenated organic substances with content of chlorine or its compounds.


Equipments Incinerator Animals


Product Description

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Clover's Social Media