Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
medical waste PYROLYTIC INCINERATOR
Parameter | Compliance |
Type of Waste | To treat medical waste, categories A,B,C,D,E |
Type of Incinerator | Pyrolytic |
Nominal Burn rate | 50 t0 60 kg/ hr at 3500Kcal/Kg |
Loading | Manual, Batch Load |
De Ashing | Automatic or Manual batch de ashing |
The incinerator must avoid the release of black smoke and fine dust during the loading | |
Primary chamber capacity | 2-3 m³ |
The insulation of the combustion chamber should be composed of refractory bricks, having a higher content of aluminium and insulates, | |
The plate of combustion in carborundum avoiding the fixing of glass and slags | |
Hours of operation /Day | >10 hrs |
Max Operating Temperatures | 1400 °C |
Normal Operating Temperatures(Primary) | >850 °C |
Operating Temperature(Secondary) | >1100 °C |
It should have digital temperatures regulator( Temperatures regulator in digital watch) | |
Carbon content of ashes | <2% |
The installation should be completely free from visible smoke as well as offensive odours | |
Residence time in second chamber | 2 second minimum |
The internal diameter of the Chimney | :Ø 400 |
Height of stack | >8m |
Burner operation | Automatic On/Off |
Fuel | Diesel |
Fuel consumption at raed capacity | >7kg waste /ltr |
Electricity consumption | <2kW at rated capacity |
Operating Voltage | 220 – 240V AC 50Hz |
Spare parts | Supply for 1 year quoted as option |
Consumables | Supply for 1 year of operation to be mentioned as option |
Warranty | Parts and service support: 1 year minimum post comissioning |
Service support | <72 hours |
Emission standard Compliance | BS3316 or equivqlent standard |
Process filtering system | Scruber to be mentioned as option |
CE Manufacturing Compliance | BS EN 746-2-1997 |
Design Specification | Type A,B,C,D,and E of medical waste |
Installation and Comissioning | Included in condition of supply |
Training in preventive and curative maintenance and use of the incinerator | Operator training inclusive in offer |
Capacity to treat Plastic | Not less than 40% by weight |
TECHNICAL DEMANDS: PYROLYTIC BURNER
incinerators for sale from china
Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance.
Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a
different waste stream is to be incinerated. The Company will provide the contractor with a list of items that can be
incinerated.
All ash will be collected and stored in individual storage bins for each particular waste stream. The bins are to be
provided by the contractor to the same design as the storage bins for the raw waste streams and include a lid design
that prevents contamination from water.
Ash from each waste stream will be sent for laboratory analysis after each initial incineration by the Company and at
intervals decided by the Company thereafter. Contractor will be required to collect ash samples for analysis as
directed by the Company. The Contractor will be responsible for the security of samples taken to prevent contamination
until collection by the Company or designated courier.
Ash will be disposed of at the direction of the Company. It is the responsibility of the Contractor to ensure the ash
is not compromised until final disposal. Company will provide additional storage area for ash if and as required.
Delivery Schedule
The delivery schedule for the unit with capacity 100 kg/h requested is no greater than 10 weeks and 14 weeks for the
unit with capacity 150 kg/h. These timelines include unit mobilization. Location ,Erbil ,IRAQ.
APPENDIX A
WASTE INCINERATORS RECOMMENDATIONS
- Multiple chamber type, horizontal stationary cylindrical body;
- Capacity of 15 kilograms per hour;
- Diesel-Powered;
- Burners should be monoblock type with built-in fan, motor, electronic programmer, automatic
ignition, fuel regulator, registration and security sensor device for the absence of flame triggering solenoid valve
mounted on the easel supply;
- The system should have ventilation for sweeping previous gases before activating the fuel supply to the
burner;
HICLOVER Medical Facility Medical Waste Heater at Stock for 2019-nCoV SARS-CoV, sars, coronavirus, Unique coronavirus


Model | Capacity/Burnning Rate | For Hospital SickBed No. | Fuel Type | Qty. | Ready for Shipping | New Production | Shipping Volume | Shipping Weight | Delivery Location |
TS30 | average 30kgs per hour | Average 150 SickBed | Diesel Oil | 1 set | 5 days | 20sets/2 weeks | 5 m3 | 3000 kgs | Shanghai Port |
TS50 | average 50kgs per hour | Average 250 SickBed | Diesel Oil | 1 set | 7 days | 20sets/2 weeks | 7m3 | 4500 kgs | Shanghai Port |
TS100 | average 100kgs per hour | Average 500 SickBed | Diesel Oil | 1 set | 7 days | 15sets/2 weeks | 10m3 | 6000 kgs | Shanghai Port |
TS150 | average 150kgs per hour | Average 750 SickBed | Diesel Oil | 5 sets | 7 days | 15sets/2 weeks | 13m3 | 7500 kgs | Shanghai Port |
YD10 | average 10kgs per hour | Average 50 SickBed | Diesel Oil | 2sets | 7 days | 20sets/2 weeks | 3m3 | 1200 kgs | Shanghai Port |
YD20C | average 20kgs per hour | Average 100 SickBed | Diesel Oil | 2sets | 7 days | 20sets/2 weeks | 6m3 | 2000 kgs | Shanghai Port |
YD50C | average 50kgs per hour | Average 250 SickBed | Diesel Oil | 2sets | 7 days | 20sets/2 weeks | 7m3 | 2300 kgs | Shanghai Port |
YD30 | average 30kgs per hour | Average 150 SickBed | Diesel Oil | 1 set | 5 days | 20sets/2 weeks | 5m3 | 2300 kgs | Shanghai Port |
YD30 Small | average 30kgs per hour | Average 150 SickBed | Diesel Oil | 2sets | 5 days | 20sets/2 weeks | 3m3 | 1500 kgs | Shanghai Port |
YD50 | average 50kgs per hour | Average 250 SickBed | Diesel Oil | 2 sets | 5 days | 20sets/2 weeks | 8m3 | 4500 kgs | Shanghai Port |
YD100 | average 100kgs per hour | Average 500 SickBed | Diesel Oil | 1 set | 10 days | 15sets/2 weeks | 13m3 | 6000 kgs | Shanghai Port |
YD150 | average 150kgs per hour | Average 750 SickBed | Diesel Oil | 1 set | 10 days | 15sets/2 weeks | 17m3 | 7500 kgs | Shanghai Port |
YD300 | average 300kgs per hour | Average 1500 SickBed | Diesel Oil | 10sets/2 weeks | 20m3 | 9000 kgs | Shanghai Port | ||
YD500 | average 500kgs per hour | Average 2500 SickBed | Diesel Oil | 5sets/2 weeks | 27m3 | 13000 kgs | Shanghai Port | ||
CA 50 Mobile Containerized | average 50kgs per hour | Average 250 SickBed | Diesel Oil | 2 sets | 15 days | 10sets/2 weeks | 28m3 | 7000 kgs | Shanghai Port |


Tel: +86-25-8461 0201
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]
2020-04-03
health care risk waste as well as likewise basic waste burner
We seek a lasting growth consequently we are adopting an enduring medical waste monitoring system, that includes constructing a modern long lasting incinerator that will certainly not just provide for our center yet also for the numerous other centers in the larger place of the location. Waste kind: health care danger waste and standard waste
5. Chimney:
Smokeshaft: 3.5 mm light steel
Altitude from base:11 m and additionally if there are structures within
30m of the heater, smokeshaft needs to extend at least 3m
above the pinnacles of all the roofing of such buildings
Size of smokeshaft at leading:430 mm.
Weight of pile: ± 500 Kg.
Instance and pile be repainted with 400 ⁰ C warmth immune Black paint.
6. Heating systems:.
First chamber 850 ⁰ C—- 900 ⁰ C.
second chamber 1000 ⁰ C.
7. Variable rate burning air blowers.
8. Main chamber amount ± 1.05 cubic metres.
9. Mixing chamber amount ± 0.30 cubic metres.
10. Dealing with chamber quantity ± 0.89 cubic metres.
11. Weight excluding smokeshaft ± 6.400 Kg at manufacture.
12. Shooting tools provided: Hoe, texas hold’em in addition to rake.
13. Dimensions.
Dimension ± 2125mm.
Size ± 1890mm.
Elevation ± 2125mm.
Additional dimension for burners ± 1000mm.
14. Packing door opening 610 * 540mm.
15. Fireplace area ± 1.19 square metres.
16. Summary of grate/hearth: A total hearth to be supplied to prevent contaminated.
17. Fluids from streaming right into ash pit without being blazed.
18. Conformity with South African Atmospheric Contamination Avoidance Act No. 45 of.
1965 or equal air contamination criteria.
19. Documents to be provided: Treatments and likewise maintenance manual along with demand.
running treatments (SOPs).
20. Exhaust controls:.
warmed refractory screen.
Reduced rate grit clearing up chamber.
Stainless-steel arrester display
21. Refractory product: alumina content> > > > 49% as well as density common 102mm.
22. : to be corrected 2-3 days.
23. Products of structures.
Case:5 mm moderate steel.
Sustaining: heavy angle and likewise network.
Hearth: 1550 ⁰ C.
Ashing door: high quality cast iron.
Packing door 5mm modest steel lined with 1550 ⁰ C castable fundamental purpose high strength, high abrasion resistant monolithic refractory concrete.
Burner wall surface surfaces in addition to roof covering: 1550 ⁰ C castable monolithic refractory
Gasified incineration for melting medical wastes burner
Gasified incineration for shedding medical wastes.
Gas kind: Gas
Developed to melt disposables that can as well as should certainly be destroyed on-site. Theses wastes include also contaminated and infectious “red bag.” Surgical dressings, plastic assessment tools as well as different other wastes.
Quick, total, efficient garbage disposal.
Twin chamber combustion, Chambers insulated and also lined with high temperature refractory. Programmable digital temperature controls, temperature level indications and also cost recorder. Modulating control for gas along with air lowers gas consumption.
Minimum installation as well as also launch time.
Aluminized steel coat lined with refractory and firebrick. Screens recorders as well as likewise various other accessory equipment should be available.
Payment system:.
– – Upright price door on crucial chamber.
– – Pneumatically-driven or hydraulic ram charging system.
– – Car folded of the door after billing.
– – Main as well as additional chamber temperature offered and videotaped (optional).
Charging cost:.
– – As long as 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.
Gas:- Gas.
Capacity (Cubic Mtr): 1.65 M3 and even a lot more.
Ave Capability: 100kg per hr.
Added Chamber Capability (CubicMtr):3.88 or even more.
Size (mm): 1880 or much better.
Width (mm): 1280 or better.
Height Incl. Flue (mm): 7700 or much better.
Ash Door Opening (mm): 475×× × × 900 or much better.
Minutes. Running temperature level: 90 level centigrade.
Max, Operating Temperature: 1350 level centigrade.
Residency time in Secondly Chamber: 2 sec.
Temperature Tracking: Both for additional and main chambers.
Filling SystemManual/semi-automatic.
Waste devastation effectiveness: > > 90% by weight.
Filter: Different or ceramic other equivalent filters in order to decrease the induction of unsafe air pollutants, particulates, carbon monoxide gas, dioxin/furane right into the setting.
De ashing system: Manual/semi-automatic.
– Civil features. – Waste collection Trolleys.
Re-burning machine: Power max 0,2 kW Voltage: 220V/ 380V.
Weight: max 5000 kg
Burner size: max 2000x1200x3200 mm
Burning room volume:
–– Gasification space max 0.7 m3,
–– Additional burning area max 0.5 m3 ,
Dimension of the filling up entry: max 650×× 850 mm Air blower: max 0,5 kW Combustion-support burning devices: – Power max 0,2 kW INCINERATOR (WASTE BURNER).
Created to burn disposables that can as well as ought to be ruined on-site. Theses wastes consist of transmittable and also infected “red bag.” Surgical dressings, plastic examination tools as well as various other wastes.
Rapid, total, efficient garbage disposal.
Twin chamber combustion, Chambers insulated and also lined with high temperature refractory. Programmable digital temperature controls, temperature signs and also cost recorder. Modulating control for gas as well as air decreases gas consumption.
Minimum installment and also launch time.
Aluminized steel jacket lined with refractory and firebrick. Screens recorders and also other accessory equipment must be available.
Billing system:.
– Vertical cost door on key chamber.
– Pneumatic or hydraulic ram charging system.
– Auto closed down of the door after billing.
– Main as well as secondary chamber temperature presented and recorded (optional).
Charging price:.
– As much as 100kgs per hour of waste or red bag waste ranked at 2200 BTU’s per kg.
Fuel:- Natural Gas.
Capacity (Cubic Mtr): 1.65 M3 or even more.
Ave Ability: 100kg per hr.
Additional Chamber Capacity (CubicMtr):3.88 or more.
Size (mm): 1880 or far better.
Width (mm): 1280 or better.
Height Incl. Flue (mm): 7700 or far better.
Ash Door Opening (mm): 475×× 900 or much better.
Min. Running temperature level: 90 degree centigrade.
Max, Operating Temperature: 1350 level centigrade.
Residency time in Second Chamber: 2 sec.
Temperature Monitoring: Both for main and secondary chambers.
Filling SystemManual/semi-automatic.
Waste destruction efficiency:> > 90% by weight.
Filter: Ceramic or various other equal filters in order to lower the induction of unsafe air contaminants, particulates, carbon monoxide, dioxin/furane into the environment.
De ashing system: Manual/semi-automatic.
The System needs to be priced estimate total with:-.
– Pipes.
– Electric panels.
– Civil functions.
– Waste collection Trolleys.
Re-burning machine: Power max 0,2 kW Voltage: 220V/ 380V.
Weight: max 5000 kg