Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
Clover Incinerator
Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China. All series included burning capacity 10kgs per hour, 30kgs per hour,50kgs per hour,100kgs per hour,150kgs per hour,300kgs per hour,500kgs per hour. Up to now, all models sale to all over the world and have good feedback from end-customer. The YD Model medical incinerator have multi-combustion chamber and basic dry scrubber (smoke filter chamber) with reasonable project budget. For the cleaner emission require, we accept custom made wet scrubber for incinerator and this will be also our next working by focusing on emission technical.
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
All our incinerator use stainless steel chimney, not steel.All our incinerator have two combustion chamber at least, not single chamber. All fuel burner from Italy made with famous brand, best quality.
300kgs per hour burning rate incinerator is well liked by market because this model can be medical waste incineration equipment for big hospital and also very good for other solid waste treatment with lowest cost, even if big size animals also can be feed into the combustion chamber. The primary combustion chamber volume is 2.4m3, big enough for common size animals. For shipping transport, YD-300 can be loaded into 40’feet full high container.
Big size combustion chamber up to 4.0m3 and Internal Dimensions is 257 x 147 x 108cm with feeding door opening 108 x 128cm. This model can be a small waste incineration factory with little amount of budget funds. If end customer use this for farm to burn animals like cow, horse or camel, contact with us now.
Smart Ash Incinerators
Smart Ash Incinerators
1. Size requirement for the incinerators is that the unit works with a 55 gallon open ended
steel drum.
2. The unit should operate wit. no fuel and use only 120V or 220V electricity for the blowers.
3. The unit should be capable of burning oil contaminated wastes and medical wastes with a moisture content of 0-15%J
4. Each unit should come witH two steel drums, so that a spare drum is available.
Spare Parts Option
If there are any vendor suggested spare parts , that list and price should be included as an option in the offer.
Chamber Double Incinerator
Chamber Double Incinerator:
Burning Rate 10 kg per hour (for two incinerators)
Burning Rate 20 kg per hour (for three incinerators)
Loading Method Manual
No of Burners Single for 10 kg/hour and Double for 20 kg per hour
Fuel Diesel and Natural Gas
Warm Up Time Not more than 20 minutes
Temperature controller Digital
Power Supply Single Phase 220V
Chimney Height 20 feet from ground level
Wet and Dry Scrubbers Optional
Gasified incineration for burning medical wastes
Gasified incineration for burning medical
wastes.
Fuel type: Natural Gas
Burning Capability:
– 30-50 kg/time
– Daily 3-6 times
Incinerator size: max 2000x1200x3200 mm
Burning room volume:
– Gasification room max 0.7 m3,
– Secondary burning room max 0.5 m3,
Size of the filling entrance: max 650×850 mm
Air blower: max 0,5 kW
Combustion-support combustion machines:
– Power max 0,2 kW
Re-burning machine: Power max 0,2 kW Voltage: 220V / 380V
Weight: max 5000 kg
User Manual Language: English
Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.
Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.
Requirements:
- Incinerator system complete with scrubber, pollution control system, water system, loading system, ash removing system and if anything more option is available. we have to burn 10000kgs/day, We work 8 hours a day, so your incinerator should have capacity to burn atleast 1400 or 1500kg/hr of waste.
supply 02 primary combustion chamber, and continuation feeding or alternately. each primary combustion volume is 4.0 M3, total 8 m3.
- With complete system specification, power, water fuel requirements.
- Space requirements & floor plan
- Pre-installation requirements. Space, power, water, drainage system etc
- Fuel type” diesel or gas?
- All options available.
- You have to send your technical team for installation, user training, maintenance training for end user technicians.
- Maintenance schedule—what has to be done, daily, weekly, quarterly, half yearly, annually.
- What are the replacement items during one year.
- Your system should meet all local & international standards with respect to handle of tobacco dust before feeding to incinerator, gas emission, waste water discharge to public drain system, ass disposal etc.
- End used will send this dust to incinerator plant in bags of 300kg each, so we are expecting 35 bags of 300kg each per day, 7 days a week.
- How many engineers or technicians you will send for installation, how many people, what machines & tools you want us to mobilize to facilitate your people to do the installation. how many days installation & training will take.
- What will be your charges for installation visit.
- If you have some picture of such big installations, references(within this region is helpful if you have), you can provide us.