Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

incinerator for medical waste

Dual-chamber controlled air incinerator

incineration

Materials of construction: The incinerator shall not have any asbestos, asbestos-containing substances, mercury thermometers, and mercury switches. Refractory materials shall be able to meet relevant standards under ISO TC33 and CEN/TC                                                                               187.

Types of incinerator design acceptable: Dual-chamber controlled air incinerator or dual- chamber pyrolytic incinerator

Waste feed system into the combustion chamber batch or continuous loading: For continuous loading, the automatic charging ram or auger feed system shall be capable of injecting small amounts of waste at frequent intervals and should be able to prevent waste from being fed when the combustion chamber temperature is less than 850°C. In addition, the waste feed should only be able opened at or below 50°C in an ambient temperature of 21°C.

 

Primary combustion chamber: Shall be constructed with a casing (reinforced to withstand internal pressures without deflection or damage to the refractory or other components) supported by a structural frame and provided with refractory lining and insulation

Access doors, openings, and gaps: All access doors, openings, and gaps shall be sealed to prevent emission of smoke and exhaust gas and to block admission of air during incinerator operations. Doors exposed to flame or direct heat of combustion gases shall be lined with the same type and thickness of refractory lining and insulation as that used in the combustion chamber

Grate system for the primary chamber Moving grate, traveling grate, reciprocating grate, or rotating drum grate

pequeño incinerador de desechos médicos

Somos fabricante y vendedor de equipos médicos de incineración. Nuestra filosofía es mejorar continuamente nuestra tecnología en línea con las crecientes necesidades del medio ambiente y nuestros clientes. Todos nuestros incineradores se construyen con los más altos estándares de durabilidad, facilidad de uso y seguridad. El diseño de los incineradores los hacen ideales para la exportación debido a su sencilla instalación y el requisito de la operación. Los incineradores están diseñados para producir la más alta tasa de combustión es posible desde la más pequeña cantidad de combustible.
Tenemos la capacidad de oferta de 10/15/20/50/100/150/300/500 kilogramos por Equipos horas.El equipo es de tamaño pequeño, de alta eficiencia, proceso razonable, tecnologías de punta y de alto grado inofensivos. Es el equipo ideal de tratamiento de la basura para el hospital, laboratorio, hotel, estación, etc

incinarator (syc-10 oil),

Waste Incinerators International Market Analytics

Key Word:

small incinerators

medical waste incinerator

pet animal cremation incinerator

incinerator manufacturers

 

 

Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below:

 

Treatment capacity: small scale incinerator, large scale incinerator and incineration pant.

Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators

Incinerator fuel: gas incinerator, oil incinerator

Waste to Energy (WTE): WTE incinerator, non-WTE incinerator

Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.

Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA) , Haat (India)

Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour

 

Pyrolytic incineration technical is traditional waste treatment way for many years. All over the world, in many countries, people anti incinerator because the incinerator will produce a large Dioxin in the smoke. “Dioxins” refers to a group of toxic chemical compounds that share certain chemical structures and biological characteristics.  Dioxins can be released into the environment through forest fires, backyard burning of trash, certain industrial activities, and residue from past commercial burning of waste.  Dioxins break down very slowly and past releases of dioxins from both man-made and natural sources still exist in the environment. Anyhow, we have to remind that, this is large scale incineration pant, generally more than 30 ton per day. This is a social problem, to analyze and suggest ways in different angles from the public, government, economic development, environmental protection, technology development, etc.

 

So, why we still use incinerator?

First, for the medical waste from hospital, the pyrolytic incinerators is best treatment up to now. Pyrolytic technology can kill the virus, pollution control.

Second, for human body, pet animal, in many countries and regions, we desire to cremation them. This is the ceremony in the process of society development, and ceremonies to commemorate the disappearance of life.

 

As above two reason but not only above, we still use incinerators.

 

How you can find reasonable incinerator for your local site?

Incinerator is not a cheap equipment, generally the small scale model’s price around $5,000usd per unit and large scale model’s price more than $50,000usd per unit. So, before purchase one unit incinerator, you have to make clear following items:

A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of waste you want to treatment?

B, small or large? This according to the waste output every day or the waste volume per feed time, like animal size.

C, fuel? Incinerator use oil or gas fuel, generally, gas fuel is cheaper than oil and the smoke cleaner than oil fuel model. But some local site don’t have gas supply system.

And other technology items, like power(220v, 380v), waste feed door type, incinerator structure, etc.

 

After you clarify these, you can go to find a local or international manufacturers, asking prices, technical specifications and ultimately purchasing the right products.

Pet Animal Crematory

Clover Incinerator update A model incinerator for pet cremation and animal incineration. New design accept independent movable platform in-out incinerator combustion chamber. This new design is valid for model A900 and bigger model.

How to Buy Incinerator

1. Clover Medical save all rights to mend/update product information on website. The specifications are subject to change without prior notice.

2. We accept business term: FOB/C&F/CIF term, by sea/train, full container or bulk goods. 1. FOB (Free on Board), the price leave China port. 2. C&F (Cost and Freight), FOB price and freight cost. 3. CIF (Cost and Insurance and Freight), FOB price and insurance fee and freight cost.

3. Payment Term:
By sea: 50% deposit T/T (bank transfer) in advance, and 50% balance T/T before shipping day.
By Train: 100% T/T in advance.

4.Shipping Document & Packing: Generally, We supply (1)Bill of Lading (Way Bill), (2)Commercial Invoice, (3)Packing List ONLY.
If any further documents/certification and label print/words on packing material or documents which request by importer or local customs, whatever happen in China or oversea, should inform seller in advance and charge as actual cost. For example, Fumigation Certification, embassy certificate, BV/SGS…inspection, certificate of original (C/O), Form A, etc. Buyer must to inform seller in advance and pay these cost. Seller save all rights to postpone/cancel shipping and request lost cost cause this incident. If the importer local customs arrest/request penalty or other situation caused by buyer mistake, Clover Medical save all right to request compensation/litigation. Thanks for your cooperation.

5. The leading time is mostly 3-6 weeks, depending on the products and quantity.

7. Guarantee: One year for the equipment. We supply spare parts for maintenance, free charge within the first year and the delivery charge is on the buyer.

8. Insurance: Bear all risks of loss of or damage to the goods from the time they have passed the ship’s rail at the named port of shipment. we proposal apply All Risks insurance under each contract. When buyer pickup goods at local site, must inspect carefully. If any damage happened under insurance policy, buyer should inform insurance company and Clover Medical Limited immediately. We will provide necessary assistance.

Clover's Social Media