Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Capability of Infertility in weight 60 Kg/h


ratio is 30-70percent for the other situations
* A device of air ducts of heating of waste gases,.
* Electro-ventilator dispersing the next atmosphere, the plan of this air flow being implemented by valves and also

following the control of the automatic cycle.
23. Discharge Specifications Conformity: BS 3316 or similar need.
. Nature: 42 percent of Al203.
– – – – fragments that can be quickly prepared – – – Factors that conveniently deteriorate like wood, paper, organic leather and crap – – – Chemical waste solids as well as additionally fluids, waste oil as well as also numerous other difficult-to-handle things

The devices will be certified for process from PME after passing website investigations.Manual lots double room

burner for scientific waste to melt 50kg/hr on consistent treatment, together with Key temperature level approximately

800degC minimum as well as 1200degC as well as additional in the Added room, full with payment doorway, Ash doorway, Air as well as check out

ports, supporting air system with adjustable dampers, burners and additionally heater management system and additionally ignition system, the entire to

satisfy NEMA requirements together with numerous other international needs. Здравствуйте! Меня интересует пе

чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Стоимость и доставка до г.Алматы Казахстан

The technical details we respect are:

–– – – Ability ( burning ability of waste per human resources). 150kg/hour. Burner with 300l waste room

–– – – Construct products, 5mm Superb high quality light steel construction; 100 mm superb quality refractory cell liner.

–– – – High Infection paint finish.we have 2 health centers, more afterwards 20 dental expert workplaces, and also over 50 physician workplaces.
– – – Chemical waste solids as well as likewise liquids, waste oil and also numerous other difficult-to-handle items

The resources will absolutely be licensed for process from PME after passing site investigations.Manual tons double room

burner for clinical waste to melt 50kg/hr on consistent treatment, with Key temperature level approximately

800degC minimum as well as 1200degC as well as additional from the Extra room, complete with invoicing doorway, Ash doorway, Air as well as check out

ports, complementary atmosphere system with adjustable dampers, burners and heater management system and additionally ignition device, the entire to

satisfy NEMA requirements along with various other international requirements. BURNER FOR SMALL ANIMALS ABOUT 70-

100 KGR/PER TIME

2. Have you got erected shelters?Installation of waste disposal system (biomedical) 500kg capacity design, MP 500

medical burner.

* A change breaker for each and every engine (ventilators and also burners).
9. The incineration ought to be completely lacking visible smoke as well as offending scents.
From the manufacturing facility; it’ll consist of medicinal as well as likewise preventative care, as well as using instrument, etc

CAPABILITY: Burner 150 kg/hr.
Control box watertight to dust, comprising:

* A change breaker for each and every engine (ventilators and also drains ).
2. It has to have the capacity to run much less than 10 hours/day 3. This incinerator must have the capability to wreck all flammable wastes Made by medical centers, special centers,

labs, institutes, Etc
The Internal size of this Smokeshaft: Ø 400 also as its altitude: 8 m.
6. The incinerator must stay clear of the launch of black smoke as well as great dust, (Electric) throughout the loadings.
Organic rubber, artificial rubber, polyurethane sheet, and also difficult films, solids as well as also
Thickness: ≥ 85 mm.
24.
13.
* Electric box. The de- ashing needs to be performed in lowest degree of the burning chamber or the deashing must be Automatic or hands on

established de ashing.
22. Process Filtering method: Scrubber to be stated as optional.
7. It should be able to lower the quantity of wastes by 98%.
24. The supplier will carry out an onsite installation of this incinerator.
* Carcass in solid sheet steel with assistance of link.
* A sheath of release of the gases sweltered.
21. Controls along with plans:.
25. The technical training of motorists will certainly have to be offered and also provided by a specialist.
* Frontage of filling door seals climbed on joints, wheel of screw plug, adaptable joint, as well as packaging protecting

from refractory.
24. The supplier will implement an onsite installation of the burner.
* A regulatory authority with watch for the warmth of blog post combustion.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
12. The loudness of the burning room: 1.200 L.
From the factory; it’ll consist of medicinal and also preventative maintenance, and using device, etc

* A regulator with digital viewing for the warmth of burning.

23. Capability to treat Plastic: Very little less than 40% by weight.
* A regulative authority together with hope the temperature degree of article burning.
Nature: Magnesium.
* Faultlessly tight doorway for the hand-operated loading of waste. The loading needs to be Guidebook, Set Loads.
23. The mounted incinerator need to birth a one year guarantee.
– Character: Magnesium silicate. * Heater of lights of waste, together with petrol, typical mono-bloc spreading directing diving flame, lights as well as security of

electronic ignition, irreparable air circulation, electro-magnetic sluice gateway of law together with dividing shutoff.
14. Heater procedure have to be Automatic On/Off.
* Heating system with gasoline, mono-bloc spreading assisting type with direct fire, lights along with safety of digital

ignition, lasting air circulation, electro-magnetic sluice entryway of principle and isolating valve.
* A regulator with digital viewing for the warmth of burning.
* Make-up of this refractory;.

instance the burner will probably be running for 10 hrs day-to-day shows the oil use is going to be ~ 140 Litres or also a lot longer? Can you have really put up shelters?Installation of waste disposal system (biomedical) 500kg capability layout, MP 500

technological burner.
4. Layout Demands: Kinds A, B, C, D, as well as E of Skilled waste 5. ” PYROLYTIC” burning, by controlling the gasification of waste.
23. Ability to treat Plastic: Not less than 40% by weight.
* A timer with flexible temporization for the regulation of every heater.
Would certainly it be possible to provide us information on the capability of burner we need

on this island.

–– – – Approximately 150 KG/Hrs. Heater to dispose our daily regular death for this size of this cattle ranch.1. Can the

100kg/hr melt powerful waste/hazardous squander such as run out paints, waste oil or compounds.
* Plate of combustion in Carborundum, remaining free from the dealing with of glass and slags.

18. A chamber of post burning of gases.

set de ashing.
8. It should be in a position to hold exhaust at the 2nd thaw with gasoline home of less than 2 secs.
* A heater of lighting which the use is restricted to the ignition of waste.
22. The supplier must provide batches of spare components of first urgency as well as consumable of this burner.
15. Gas: gas.
* A timer with flexible temporization for the regulation of each burner.
10.
24. {
(adsbygoogle = window.adsbygoogle || []).push({});|}
– Shield in primitive panels:.
25. The specialized training of vehicle motorists will surely have to be offered as well as additionally provided by an expert.
22. Process Filtering method: Scrubber to be mentioned as optional.

CAPABILITY: Burner 150 kg/hr.
* The insulation of the burning chamber should certainly be comprised of refractory blocks, having a high substance of aluminum

as well as also insulates bricks so as to make sure a minimum temperature degree on the outdoors sheet steel.
– Thickness: ≥ 75 mm.
* A second shot of atmosphere to guarantee outstanding oxygen net content.
16. The supplier must provide essential information for the greatest of this installation.
* A tool of injection of air allowing a general re-combustion of gases,.

medical waste incinerator options along with costs for 100 mattress / 500 mattress / 1000 mattress / 3000 bed healthcare facilities.|This heater with “PYROLYTIC” burning need to possess: 17. A burning chamber of waste.
From the factory; it’ll consist of medicinal and also preventative maintenance, and using device, etc

. Nature: 42 percent of Al203.
13.
10.
* A regulator with digital viewing for the warmth of burning.
* A tool of injection of air allowing a general re-combustion of gases,.
24.
4. Layout Demands: Kinds A, B, C, D, as well as E of Skilled waste 5. ” PYROLYTIC” burning, by controlling the gasification of waste.
* Faultlessly tight doorway for the hand-operated loading of waste. The loading needs to be Guidebook, Set Loads.
* Electro-ventilator dispersing the next atmosphere, the plan of this air flow being implemented by valves and also

following the control of the automatic cycle.
–– – – international standards as well as also waste manufacturings presumptions ought to utilize
23. Discharge Specifications Conformity: BS 3316 or similar need.

instance the burner will probably be running for 10 hrs day-to-day shows the oil use is going to be ~ 140 Litres or also a lot longer? Can you have really put up shelters?Installation of waste disposal system (biomedical) 500kg capability layout, MP 500

technological burner.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
24. The supplier will implement an onsite installation of the burner.
* A device of air ducts of heating of waste gases,.
* A timer with flexible temporization for the regulation of every heater.
7. It should be able to lower the quantity of wastes by 98%.
– Character: Magnesium silicate. * Heater of lights of waste, together with petrol, typical mono-bloc spreading directing diving flame, lights as well as security of

electronic ignition, irreparable air circulation, electro-magnetic sluice gateway of law together with dividing shutoff.
25. The specialized training of vehicle motorists will surely have to be offered as well as additionally provided by an expert.
* A regulatory authority with watch for the warmth of blog post combustion.
22. The carrier needs to supply sets of additional elements of first necessity along with palatable of this heater.
15. Gas: gas.
– – Refractory concrete:.
* A second shot of atmosphere to guarantee outstanding oxygen net content.
* A reduction of burning of gases,.
* A sheath of release of the gases sweltered.
22. The supplier must provide batches of spare components of first urgency as well as consumable of this burner.
14. Heater procedure have to be Automatic On/Off.
2. It has to have the capacity to run much less than 10 hours/day 3. This incinerator must have the capability to wreck all flammable wastes Made by medical centers, special centers,

labs, institutes, Etc
– Refractory concrete:
Nature: 65 percent of Al203.
* The insulation of the burning chamber should certainly be comprised of refractory blocks, having a high substance of aluminum

as well as also insulates bricks so as to make sure a minimum temperature degree on the outdoors sheet steel.
* Carcass in solid sheet steel with assistance of link.
23. The installed incinerator needs to birth a one year guarantee.

medical waste incinerator options along with costs for 100 mattress / 500 mattress / 1000 mattress / 3000 bed healthcare facilities.
– – – – fragments that can be quickly prepared – – – Factors that conveniently deteriorate like wood, paper, organic leather and crap – – – Chemical waste solids as well as additionally fluids, waste oil as well as also numerous other difficult-to-handle things

The devices will be certified for process from PME after passing website investigations.Manual lots double room


Animal body Parts , various other biomedical waste , body organs dung


Temperature monitoring and thermostatic control|Temperature monitoring and thermostatic control
3.     Bum ability 100 Kgjhr (minimum)
Onsite  demonstrationjperformance  evaluation and  adequate training of employees on the use of incinerators.
7.     Secondary chamber    Slid heath
14.     Catalogue    Catalogue comprising detail pictures and spec迁ications
Lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the period of instalIation.
Separate   Annual    Maintenance    Contract   would    be drawn together with the supplier at a subsequent stage.
10    Size    Compact layout preferred
Dense refractory concrete lining
8.     Temperature control    Digital temperature controller and display
Electric power distribution line to mild incinerator home as well as to control box of this incinerator
1    (Incinerator)
Ash without visible smoke or odour
With a shutter door,CGI sheet roof ) based on 由e{
(adsbygoogle = window.adsbygoogle || []).push({});|}
5.     Sort of Bumer operation    Automatic diesel fired
12.     Civil    works,    setup and
No    Features    $_pecific tions

9.     Power supply    220V for management Box{
(adsbygoogle = window.adsbygoogle || []).push({});|}
11.     Opening lid    Large top open归g lid (Approx. 700 mm x 500mm) to get
Incinerators for transformation of waste to nice ,white sterile
Opera恤19 fever of 1∞o deg C or more
Bidding file

Simple loading
Dense refractory concrete lining
Version of this incinerator.
Form of waste for disposal    Animal  body  parts,other  biomedical  waste,organs dung, bedding substances ,plant p缸ts and food itemsι
2.     Load capacity    300 – 4∞Kg (maximum)
Of  the  quoted  incinerator  has to be  included  at the
4    Fuel    Diesel (LDOjHSD)
Comnuss!Onmg    lndusive  of  civil  functions (brick  wall  incinerator  house
6.     Primary chamber    Solid hearth


Incineration Heating device for burning patalogical


incineration Heating system for shedding patalogical (such as human cells or blood) as west

The weight of this west products is 700 kg each month and we also require an isolated heater

With no fume along with any kind of kind of damaging gas

. INCINERATOR REQUIREMENTS

# Recap Spec

1 Burning Capacity – – – – 400 kg/time and also need to not be much less than 300 kg/time. Maximum burning time require to be 6 times/day

2 Smokeshaft outside diameter – – – – 300 to 400 millimeter

3 Processor electricity – – – Need to not exceed 1.1 kw

4 Voltage – – – – 220V

5 Oil ingestion – – – Have to not transcend 14kg/h

6 Feeding door 1.1 measurement (mm) – – – – Not much less than 500mm 7 Incineration Temperature. (⁰ C) – – – – 800 or over 8 Exhaust

Carbon Monoxide – – – – Have to not exceed 100 mg/m3

SO2 – – Need to not exceed 400 mg/m3

HF – – – – (Hydrogen fluoride) Must not exceed 9.0 mg/m3

NO2 – – – – Must not go past 500 mg/m3

Smoke dirt – – – – Should not go past 100 mg/m3

9 Elevation of the Burner – – – – hardly any less than 10m over ground level

10 Manufacturer’s Option guarantee – – – – Not much less than 1 year

11 Electrical Connect – – – – From closest blood circulation box with 25mm2 electric cord and also all pertinent links and circuitry


Medical Waste Burner PROPOSITION


Utility problem for the incineration gadgets conducting is your sticking to.

1) petrol: Light petroleum or Kerosene

two ) Electric Power

Electric Motor

-0.1– – 110kW: Air Conditioner 220V x 3PH x 50Hz

– – – – Here 0.1 kW: Air Conditioner 220V x 1PH x 50Hz Control Circuit

– – – – MCC control: A/C 220V x 1PH x 50Hz

– – – – Tool: Air Conditioner 220V x 1PH x 50Hz

– – – – Switch over Over Gear: Air Conditioning 220V x 1PH x 50Hz

2.

– – Switch Over Gear: Air Conditioning 220V x 1PH x 50Hz

2. Door -to-door transport, Installation, Commissioning and Training

3. Prices quote

– – Cost needs to be given in Ethiopian Birr (incl. VAT)

– – Price Should include extra cost elements such as products, insurance, installment and training for essential personnel, until approval liability where suitable

{
(adsbygoogle = window.adsbygoogle || []).push({});|}|

Utility problem for the incineration gadgets conducting is your sticking to.


incinerator plant specification


1) Power Supply:
( a) Keys Supply:
( I) Singular Stage supply; 220– – 240V, 50Hz( ii) 3 Stage supply; 380– – 415V, 50Hz( iii) The electricity source electrical socket (sockets) for solitary stage supply system in the hospital’s three pins as well as additionally adheres to BS1363. |}

(b) Change:-LRB- I) Keys modification is a usual concern, the operation requires to be influenced by this issue a resistance of ± 15% or more in both the nominal voltage should certainly be permitted.
( ii) Keys Cut-off (black out) is a regular issue. Where required, Uninterrupted Power Supply (UPS) System should be consisted of to remain clear of damages of gear as a result of sudden disruption in electricity supply.
( iii) There are spikes not necessarily from the secrets supply nonetheless results when specific plants or apparatus began.
( iv) Vendors need to as an outcome validate to make certain that their electricity supply systems will not be impacted by the aforementioned conditions.

two ) Supply Of Water a) High quality: the mains supply is tough water. The supplier requires to check/modify their gear with filters or descalers where required.
B ) Stress: this fluctuates and correlated with frequent eliminated. Where required, the corporation ought to consist of pumps or boosters to overcome this dilemma.
Needs

3) Temperature amount: ambient temperature level varieties in between 21– – 450 C or possibly far more in densely populated aerated places. The hottest month of the year is March. Environmental temperature level can be such that inferior rubber as well as also plastic things can melt or warped. Prospective buyers need to make certain all items will have the capacity to withstand such temperatures

4) Humidity: rust is generally high concerning 65– – 90 percent. Electronic gadgets should be secured to avoid the impact of condensation.

5) Dirt: this is a significant concern particularly during the dry period. Dust get in tools as well as congests filters. Additional security and protection has to be provided where essential along with where suitable added filters offered to last not less than 5 years continuous usage.

6) Vermin: these are additionally provided as well as sometimes take part in gear to chew cable television along with pee on boards to create short circuit. This can be stopped by using vermin shield where required to prevent entry of these destructive pets.
7) The suggested tools must accommodate today perfect global standard such as ISO; CE; IEC, ANSI and/or BS

8) Language: a) All tags along with markings on the resources need in order to be in English language. B ) All software program application programs in the suggested gadgets should remain in English language c) All handbooks need to remain in English language.

9) Each of the apparatus provided requirement to be provided with customer and additionally technological manuals. Guidelines on their usage, storage space as well as also remedy has to be clearly indicated in the handbooks and additionally where necessary, on the resources.

10) Where perfect the following will utilize: a) Electrical Security I) The instrument has to be provided a line (power) cable of acceptable sturdiness, size, ampacity, and also top quality as well as additionally has to be guarded with perfect strain and stress alleviations.
Ii) The device ought to include, or the bidder or distributor have to provide, power plugs that are adequate for the voltage and also current of the device.
Iii) The structure requires to be based as well as grounding resistance needs not to exceed 0.15 ohm.
Iv) If the machine is twin protected, it ought to be so classified.
V) Electrical leak current in the structure of this gadget should not exceed 500µA a IEC 601-1 b) Effects of Fluids

Location VI. Requires 2-84

I) Person as well as likewise operator safety and also security and protection as well as system efficiency need not to be detrimentally affected by liquid spills.
Ii) When the machine is influenced, it needs to fail securely.

c) Overcurrent Safety I) Loss of electricity to different other apparatus on the exact same branch circuit because of internal gear blunders need to be protected against by utilizing incorporates or breaker which are clearly labeled as well as easy to convert or replace.
Long-lasting markers near every fuse holder need to indicate fuse scores.
Of the very small line voltage of 220Volts.
Ii) The machine must not be harmed by voltages by -21% to +12.5% of the small line voltage of 220Volts.

e) Electromagnetic Disruption (EMI).
I) The tool’s performance should not be influenced by EMI discharged or carried out using the high-voltage line from one more instrument.
Ii) When the system is affected, it ought to fall short securely.

f) Alarms.
I) The device needs to have aesthetic or audible alert to recommend chauffeurs of any kind of sort of system mistake that might trigger harmful or erroneous results.
Ii) Audible and/or aesthetic indicators should certainly cause when the display reading gets to and stays in the security system limitation.
Iii) All alerts have to be completely clarified in the chauffeur’s guide.

gram ) Audible Alerts.
I) Audible alarm systems need to be distinctive along with readily recognized.
Ii) Distinct alarm systems should be made it possible for when the unit is turned on (i.e., the default need not to be readied to OFF) as well as ought to be clearly distinct at any sort of kind of amount setting.
Iii) If the alarm system quantity is flexible, it needs not to be feasible to turn down the quantity so minimized that it is not more than likely to be listened to.
Iv) Though an audible-alarm silence is okay, the alert must repeat automatically if the challenge isn’t handled.
V) When an alarm system is cluttered, a decorative display ought to clearly indicate which alarm system is burdened.

h) Cosmetic Safety system.
I) Visual security system should be basic to comprehend.

2-85 Location VI. Demands

ii) The alarm system needs to define to the problem as well as continue to be up until the alert problem is cared for; it needs not to be feasible to switch off the aesthetic alarmclock.

I) Structure and building Top-notch.
I) The machine really needs no sharp edges.
Ii) All external elements ought to be securely put.
Iii) The system needs to be secured along with supply suitable protection versus transferring as well as electrically stimulated components.
Iv) The machine should certainly be well constructed with long lasting products to defy common abuse along with cleanup.
V) Switches over, deals with, as well as various other controls must be designed for issues of hefty usage.
Vi) Electrical wiring and also tubes should be well arranged in addition to packed, if perfect. Vii) Mechanical, electric, along with electrical terminators, adapters, sockets, in addition to.
Solder joints should be created to prevent fluid infiltration, imprecise connections, and also mismating of perfect in addition to combinings.
Viii) Connections need to be risk-free to resist unintended disconnection as well as ought to protect sterility, when perfect. I) The controls (i.e., switches over, knobs, etc ) need to be noticeable in addition to merely established, and likewise their attributes have to be self-evident.
Ii) Device design needs to prevent false belief of display screens as well as likewise govern arrangements.
Iii) Buttons and additionally manages should certainly be secured versus unforeseen configuration adjustments (e.g., due to an individual cleanup versus the board ).
Iv) Controls requires to be sealed versus infiltration of liquids. I) Labels as well as markings should definitely be clear and similarly readable.
Ii) Labels and additionally markings must be springy sufficient to withstand normal cleansing as well as similarly normal wear.
Iii) Correct care tales should be provided on the device.

l) Ease of Usage and upkeep.
I) The machine has to be basic to learn to userun, and additionally keep.
Ii) The machine has to get abbreviated operating directions consisted of on or using the unit (e.g., on a laminated card affixed to the apparatus ).
Iii) The gadget has to be simple to tidy, sterilize, and/or decontaminate, as perfect. Iv) The device should be created for simple accessibility to functional components.

m) Unique maintenance tools, spare-parts along with consummables.
I) Where required or needed, the carrier must consist of any kind of kind of special tools required for the maintenance of the suggested gadgets.
Ii) Each apparatus ought to be given together with the advocated spare-parts

Location VI. Requires 2-86

needed for precautionary care for five years and where needed contain supply of supported spare-parts for rehabilitative care.
N) Training.
I) The seller is required to supply ample instruction on each tools on the suitable usage as well as procedure of their tools.
Ii) Likewise, suppliers are required to provide adequate vendor’s training about the installation as well as also maintenance( both preventative and curative ).
O) Merchandise packaging and Storage space Room Troubles of Devices.
I) The resources as well as components ought to take on temperature as well as also dampness extremes more inclined to be experienced throughout storage space as well as likewise transport.
Ii) The manufacturer must recommend treatments for storage of the tools.

6) Vermin: these are additionally offered as well as sometimes take part in gear to eat cable televisions as well as pee on boards to generate brief circuit.

{
(adsbygoogle = window.adsbygoogle || []).push({});

1) Power Supply:
( a) Keys Supply:
( I) Singular Stage supply; 220– – 240V, 50Hz( ii) 3 Stage supply; 380– – 415V, 50Hz( iii) The electricity source electrical socket (sockets) for solitary stage supply system in the hospital’s three pins as well as additionally adheres to BS1363. |}

(b) Change:-LRB- I) Keys modification is a usual concern, the operation requires to be influenced by this issue a resistance of ± 15% or more in both the nominal voltage should certainly be permitted.
( ii) Keys Cut-off (black out) is a regular issue. Where required, Uninterrupted Power Supply (UPS) System should be consisted of to remain clear of damages of gear as a result of sudden disruption in electricity supply.
( iii) There are spikes not necessarily from the secrets supply nonetheless results when specific plants or apparatus began.
( iv) Vendors need to as an outcome validate to make certain that their electricity supply systems will not be impacted by the aforementioned conditions.


Clover's Social Media