Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
Hazardous Waste Incinerators
Basic Info.
Product Description
Secret Features:.
* All models with Dual combustion chamber..
* Stainless Steel chimney/stack, lengthy lifetime. * according to order.
* High temperature, lengthy lifetime of burner..
* Free or minimal setup on site..
* High melt rate, from 10kgs to 500kgs per hr, crematory manufacturers, crematory owen china, crematory.
* PLC Control Plane. * according to order.
* New Layout for family pet animal cremation business..
* One year guarantee on burner and also parts in supply.
Application Range:.
1. Medical facility& & clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medication..
2. Slaughter House && Animal Hospital & Farm: Dead Pet, Bio-Waste..
3. Neighborhood & & Sea Port & Station: Municipal Strong Waste, etc..
4. Laboratories, Remote Locations, makers, custom-made animal crematorium, whirlwind incinerator, cyclonic burners, dead animal disposal equipments, up to 6ton each day. Calamity Alleviation Workflow, Pet Cremation
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
medical incinerator primary combustion price
Our normal activities generates 2-5 tons of assorted waste materials per day which range from condemned carcasses, and medical incinerator primary combustion price
other wastes all which need to be incinerated at above 800Centigrade measured flue exhaust gas.To be used by small
hospitals and clinics to safely dispose of infectious and pathological wastes.
Load Capacity in the range of up to 200 kg
– Burning Rate approx. 50kg/Hour –
Incinerators to be very effective, fuel efficient with high / low capacity burn rates
and to be designed to meet the Norms of Pollution Control / DEFRA, etc. Technology:
Temperature Controlled Burner. Heavy-duty casing, to be a quality, rugged, reliable, economical Medical Waste
Incinerator with relevant control, easy to operate and self-contained. Type of Fuel: Diesel / Oil or Petrol.
Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export.
Within the framework of an environmental and medical equipment & technology consultation and joint purchasing, this
Procurement Bureau invites applicants for pre-qualification in the aim of primarily selecting capable companies to bid
for the above tender.
The supply will comprise the special equipment for effective waste management as mentioned above for a new private
environment contract management company with planned operations 2013 in Indonesia and Thailand, and 2014 in West & East
Malaysia to carry out those professional services in order to comply with the governments safety disposal requirements
for medical and hospital, clinical waste in the region and to meet the higher technical standard in this particular
field.small incinerators with filter (with least minimum pollution) for burning/combusting 5kg/hr, 10kg/hr, 15 kg/hr,
20kg/hr, 25kg/hr to 50kg/hr and 300kg/hr of SOLID ORGANIC DRY AND WET NON-HAZARDUOUS of any kind (including hospital
wastes) per day or per hour. Should it be with no smoke, no fumes, no odour (smell), no dust, no emission of solid
particles and with least minimum pollution (within national and international standards). Must be environmentally
healthy and acceptable with international standards. Should not be with water scrubbers. Ash contents after burning
should be 3-4%.
mobile scientific waste burner manufacture organization in china
Capability: 20KG/Hr, Temp Variety: 600 Deg. C– – 1100 Deg. C
Gas Supply: Natural Gas/Diesel
Dual Burning Chamber Complete Scrubbing System (Dual
Resulting Gas Washer), Dual Blower, Chimney Elevation: 8m
Electric Supply: 220/240Volt, Single Phase
1. Kind of waste: Waste
2. Any type of sort of other type:
3. Amount of waste created daily in kg: (50 Lot per day) SOW
4. Duration– – heater will certainly be made use of each day: (Minimum 12 hrs) SOW
5. Approximate moisture material:
6. Regional heater operating in addition to exhaust standards: US-EPA
7. What is the height of the smokeshaft called for: Not recognized
8. Fuel proposed to be utilized: Deiseal Oil
9. Accessibility of power and additionally kind: 220 or 110
10. Information of space easily available: Plenty of room
11. Do you ask for a computerized loading system: [**] Yes [**] No.
12. Do you require a gas rubbing up system: [**] Yes [] No.
13. Exactly exactly how soon do you require the system to be supplied: 30.
14. Any type of sort of other particular demands:.
15. Nature: (Solid/Semi-solid/Liquid)
infectious waste pyrolysis manufacturer chinalarge family pet incinerators
Major components are– – Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone, LPG
quote for burners for industrial chemical wastes therapy,
1 burning price need to be Average 30kgs/h
2 within chamber item need to be refractory concrete cement
3 it operates in three system diesel oil/ Gas or LPG
4 voltage must be 220V
5 inside temperature degree initially need to be 1000c in addition to second need to be 1200c
6 pipeline size ought to be 20 M
Our requirements are for 125 kg/hr as well as also 42 kg/hr, please send out quote with catalog for both options
We are presently handling Protection Related Tools, Building Help as well as Medical Equipment, Modular Solutions
for Hospitals, Waste Keeping Track Of System, CSSD, Medical Facility Home furnishings as well as additionally Companies. We are based in the Resources city of
Pakistan i.e. Islamabad, where there are all the head offices of Armed forces as well as Govt. establishments. We have the ability to
Participate in tenders as well as we additionally have a strong network of energetic/active dealers as well as sales personnel in Pakistan as well as
Afghanistan.
5 burner 15 kg the demands Heat heater 99% combustion performance Temperature level as much as 1200 ° C or
Smoke as well as odor free of charge Phenomenal warmth retention Electric powered Fast heatup times Temperature degree As long as 1200 ° C or as required
Capability 15 Kg Burning Effectiveness 98% Noise-.
air vent Surveillance device Air Pollution Control Tool CE and also ISO Qualified
I ‘‘ d like to ask you concerning a nuclear power plant by burning waste. We have a number of camps for displaced individuals in Syria, and we
wish to buy a plant to create electrical energy by local waste incineration Please send me an offer or any type of information.
TECHNICAL INCINERATORS REQUIREMENTS FOR 2 health centers in Kenya
TECHNICAL INCINERATORS SPECS FOR 2 medical facilities
INTRO
- All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
- The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
- The incinerator shall be run on a 3-phase power supply (mains)
- For the technical evaluation, not only the treatment plant but the entire system will be considered. It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
- The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
- The Bidder must provide a warranty for one year.
- All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
- The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
- Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
- Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as. The provisional and final acceptance shall take place at the final destination.
- After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
- Providing the name and address of its authorised maintenance, service and repair centre,
- Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
- The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
- It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
- The Bidder shall supply and install the incinerator with the following attached specifications
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP | |||||
ITEM | DESCRIPTION | UNIT | QTY | RATE | KSHS. |
Incinerator | |||||
To supply and install the following | 2NO. | ||||
Hospital Incinerators to Nema standards | |||||
The following are the incinerator specifications :- | |||||
A | Ø Waste type: Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste | ||||
Ø Waste density: 125 to 350Kg/M³ | |||||
Ø Waste CV: 4000 KCAL/Kg | |||||
Ø Moisture content: 10-25% | |||||
Ø Estimated ash residue: 5-10% | |||||
Ø Nominal capacity: 100Kg/hour batch load | |||||
Ø Secondary chamber: 2 second @ 1100ºC | |||||
Ø Environmental: NEMA ACT (EMCA) 1999 | |||||
Clean Air Act 1999 | |||||
BS3316 1987 | |||||
Equipment | Set | ||||
The Incinerator must comprise of: – | |||||
Ø Manual Loading door (heavy duty steel door with appropriate refractory lining) | |||||
Ø Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long | |||||
Ø Full sized bulk load/ash removal door | |||||
Ø 1 off diesel-fired ignition burner – temperature controlled | |||||
Ø 1 off combustion air supply fan and distribution system, automatic control | |||||
Ø High capacity secondary combustion chamber 2 second @ 1100ºC with | |||||
Ø 1 off diesel-fired afterburner – temperature controlled | |||||
Ø Control Panel – automatic operation | |||||
Ø Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation) | |||||
Ø Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator | |||||
Carried Forward To Collection Page. | |||||
NOTE: WE REQUIRE TWO INCINERATORS. ONE | |||||
ITEM | DESCRIPTION | UNIT | QTY | RATE | KSHS. |
B | Diesel Tank: | ||||
To provide for diesel service tank (Capacity 400 litres) including level indicator
The tank requirement to be attached to the burner at a better level to make it possible for free-flow of diesel from the storage space tank to the burner. |
Item | 1 | |||
C | Installation & commissioning works | ||||
D | Positioning of Incinerator: –
EVALUATION STANDARD |
Item | 1 | ||
E | Connect burners to fuel supply. | No. | 2 | ||
F | Chimney Installation: | ||||
G | Composition of the chimney: –
Analysis will certainly be performed in 4 phases particularly initial assessment of documents for uniformity with obligatory demands, technical assessment, website check out and additionally commercial exam. 100 Pass mark for technical analysis is 70/100 marks |
Item. | 1 | ||
H | Commissioning & Training: | ||||
Testing set operating parameters, training of operators and technical staff. | Item | 1 | |||
I | Commissioning Maintenance Contract | ||||
Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal). The maintenance contract price includes labour, transport and accommodation for the attending technicians. | Item | 3 |
Stage 3: Internet Site Browse With
The assessment committee will certainly check out the properties of the prospective purchasers who are receptive to technical evaluation stage to validate the credibility of legal documents sent out; establish the accuracy of the information offered in the tender documents, analyze firm’s capacity, area, to call a couple of.
LOCATION V– – TIMETABLE OF STANDARD
NO
NO
1
NO
1
ITEM | DESCRIPTION | UNIT | QTY | MARKS ALLOCATED | MARKS RECEIVED |
Incinerator | |||||
To supply and install the following | 2NO. | ||||
Hospital Incinerator to Nema standards | |||||
The following are the incinerator specifications :- | |||||
A | Ø Waste type: Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste | 35 | |||
Ø Waste density: 125 to 350Kg/M³ | |||||
Ø Waste CV: 4000 KCAL/Kg | |||||
Ø Moisture content: 10-25% | |||||
Ø Estimated ash residue: 5-10% | |||||
Ø Nominal capacity: 100Kg/hour batch load | |||||
Ø Secondary chamber: 2 second @ 1100ºC | |||||
Ø Environmental: NEMA ACT (EMCA) 1999 | |||||
Clean Air Act 1999 | |||||
BS3316 1987 | |||||
Equipment | Set | ||||
The Incinerator must comprise of: – | |||||
Ø Manual Loading door (heavy duty steel door with appropriate refractory lining) | |||||
Ø Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long | |||||
Ø Full sized bulk load/ash removal door | |||||
Ø 1 off diesel-fired ignition burner – temperature controlled | |||||
Ø 1 off combustion air supply fan and distribution system, automatic control | |||||
Ø High capacity secondary combustion chamber 2 second @ 1100ºC with | |||||
Ø 1 off diesel-fired afterburner – temperature controlled | |||||
Ø Control Panel – automatic operation | |||||
Ø Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation) | |||||
Ø Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator | |||||
ITEM | DESCRIPTION | UNIT | QTY | RATE | KSHS. |
B | Diesel Tank: | ||||
To provide for diesel service tank (Capacity 400 litres) including level indicator
Hallmark of tenderer |
Item | 1 | 20 | ||
C | Installation & commissioning works | ||||
D | Positioning of Incinerator: –
Note: In situation of variance in between system price as well as total quantity, the device price will control. |
Item | 1 | 10 | |
E | Connect burners to fuel supply. | No. | 2 | 5 | |
F | Chimney Installation: | ||||
G | Composition of the chimney: –
AREA VI – – – – CONVENTIONAL FORMS TECHNICAL INCINERATORS SPECS FOR 2 clinical centers INTRODUCTORY |
Item. | 1 | 10 | |
H | Commissioning & Training: | ||||
Testing set operating parameters, training of operators and technical staff. | Item | 1 | 10 | ||
I | Commissioning Maintenance Contract | ||||
Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal). The maintenance contract price includes labour, transport and accommodation for the attending technicians. | Item | 3 | 10 | ||
TOTAL |
The container need to be affixed to the incinerator at a greater level to make it possible for free-flow of diesel from the storage tank to the burner. |
EXAM CRITERIA
Analysis will be executed in 4 stages specifically preliminary examination of files for uniformity with required demands, technical assessment, site check out as well as likewise industrial exam.
100
Pass mark for technological evaluation is 70/100 marks
Phase 3: Web Site Browse Through
The assessment board will inspect out the properties of the potential buyers that are responsive to technical analysis phase to confirm the credibility of lawful data sent out; develop the accuracy of the details provided in the tender documents, analyze company’s ability, location, to call a few.
Phase 4 Company Analysis
ITEM
Quotes that pass the above 3 (3) phases will be contrasted on the basis of prices/ cost approximated and the most affordable valued will definitely be taken into factor to consider the cheapest analyzed proposal as well as additionally consequently suggested for honor. |
ITEM DESCRIPTION | UNIT | QTY. REQUIRED | UNIT PRICE (KHS) | REMARKS |
1. | Supply, Delivery, installation and commissioning of Incinerator in |
NO |
1 |
||
2. | Supply, Delivery, installation and commissioning of Incinerator |
NO |
1 |
Trademark of tenderer
Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.
SECTION VI – – STANDARD FORMS
- Form of tender
- Contract form
- Confidential Questionnaire form
- Tender security form
- Performance security form
- Bank guarantee for advance payment
- Declaration form