Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

manufacturer of ha zardous waste incinerator in china


Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system
Imputing door Mouth Width (mm): 760*760 (approx.)
Chimney External Diameter (mm): 300 ± 10
Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max)
Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h
Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz

Per your advertisement for 300 kg.hr. Model – We need to know the price via return.

How many Kg. of Fuel would be required for running this Model 10 hrs. everyday.

We have our own Freight Forwarding Agent.

We had a Contract for Garbage Management before their Civil War for 120 Tons/Day for one Municipality in North Africa
Medical Waste Incinerator

Dual Chamber (Primary & Secondary) with insulation slabs (fully insulated internal refractory lining) along with

controlled air blower for each chamber

Insulation / Refractory Thickness: ≥ 100mm

Chamber plate thickness: ≥ 6mm

Fuel Type: Natural gas based on burning fuel in combustion chambers

Waste Capacity: ≈ 150 Kg/Day

Incineration capacity: ≈ 25 Kg/Day (Separate waste charging and waste removal doors)

Burners: At least with (02) burners of automated start and stop functions

Combustion efficiency: > 97%

Temperature: programmable temperature with temp monitoring system

Residence time: 2 second in secondary chamber

Heating value: 4000 Kcal

Temperature Range: ≈ min 800ºC to max 1200ºC

Electrical supply: 220V with single phase

Chimney Plate Thickness: ≥ 5mm

Water scrubber: Scrubbing using reagent like lime & should made of SS 10 gauge of non-corrosion properties and painted

exteriorly by equipment grade heat resistive enamel

Chimney Height: between 15-25 feet


medical incinerator producer



1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as well as 170% -120% of stoichiometric amount specifically. Circulation meter/suitable circulation measurement tool shall be supplied on the key and second air ducting. The combustion air shall be provided via a separate forced draft fan bookkeeping for the air supplied with burners. Provision shall be made in the main chamber to gauge the water column pressure.
2. Ability: as much as 4000kg burn not less than 500 kg/ hr.
3. clinical incinerator manufacturer The refractory lining of the chamber shall be strong sufficient to maintain minimal temperature of 1000dc in the primary chamber and also 1200 dc in the secondary chamber. The refractory& & insulation blocks shall have minimum 115mm density each & & conform to IS:8 -1983 & & IS:2042 -1972 respectively.
4. The incinerator covering will be made from SS/MS plate of appropriate thickness (minimum 5mm) as well as painted on the surface with warmth resistant aluminium paint appropriate to hold up against temp.of 250 dc with correct surface preparation. Refractory lining of the warm duct will be done with refractory castable (minimal 45mm thick)& & insulation castable( minimal 80mm thick). Ceramic woollen will be used at warm duct flanges & & development joints.
5. There will be a separate burner each for the key & & second chamber. The warm input capacity of each burner shall suffice to increase the temp.in the main & & secondary chambers as 800+/- 50dc and 1050+/ -50 dc specifically within optimum of 60 mins prior to lose billing. The heaters shall have automatic changing off/on control to stay clear of the fluctuations of temperature levels beyond the called for temp.range.
6. Incinerator shall have visuals or computer system recording tool which shall instantly and also continuously screen as well as document dates, time of day, set consecutive number, Carbon monoxide, Co2, O2 in gaseous exhaust will also be gauged daily.
7. Architectural layout of the chimney/stack shall be based on IS:6533 -1989. The chimney/stack shall be lined from inside with minimum of 3mm thick all-natural tough rubber ideal for the task problems and also shall additionally conform to IS:4682 part I-1968 to prevent deterioration to oxygen and also acids in the flue gas.

8. The incinerator must have an emergency situation air vent. The emergency vent will continue to be closed ie. it shall not emit flue gaseous during normal procedure of the incinerator.

9. Steel gas storage tank from black steel (capability not less than 2500 litres) and also will be set up at the incinerator Space. The container will be supplied with all needed installations consisting of fill, vent, drain as well as overflow line, level sign and also access for examination and also maintenance. Degree switches over will be provided for the complying with solutions.

(a) Reduced level alarm system.
( b) High degree alarm system.
( c) Reduced degree beginning of transfer pump.
( d) High degree stop of transfer pump

10. An all set built produced space shall be supplied for real estate the incinerator. The area will certainly be created in such a way that vacuum is offered on all sides and warmth radiation maintained minimum as well as offering the operators a simple convenient environment as well as ventilation. The materials will be sufficient structural thickness of moderate steel angles neatly covered with metal primer and epoxy repaint to hold up against sea corrosion.
– – effectiveness for the therapy of placenta? and ended or spoiled medicines, cytotoxic and also cytostatic medications recommended: narcotics eg.
– – Does it allow to deal with drug or waste consisting of glass (whatever color: clear or colored white) without triggering surges?
– – The capacity of the liquid waste treatment (blood, urine discolored, other body fluids contaminated, no matter what quantity product packaging?
– – The efficiency of process chemicals (after neutralization and also cleansing: solids and also liquids).
– – Exists microbiological testing especially: the processing efficiency bascillus



laboratory heater



the entire carcass of animals (cattle, steeds,
Sheep, pigs, and more), along with normally contaminated materials
Products in the gas stove.
? Opening Doors – – – – the closure as well as additionally dependency automatic system,
Which are dealt with from another area by the operator.
? made to work in long mode in addition to quick
Activity (Running Start EP – – – – i). – –? Completely mobile – set up on wheeled chassis.
Throughout the treatment. Burners require to be provided.
As usual tools a special truck

air retention for at least 2 secs at a temperature level of less than 850C, the combustion.
In order to attain the suitable effect.
? ought to be a two-chamber heaters, main in addition to additional.
Gas stoves.
? The waste things to minimize the preliminary amount.
Feasible to reduce (about 5% sterile and also tidy ash.
Type).

Heaters should be supplied in the fuel container (diesel ).
? The minimum capability of the family pet carcass burner.
The destruction of 1000 kg/ human resources. Heater ability is calculated.
8MJ/kg- product as well as additionally 60 % moisture.
? It has to be possible to use the burner +40.
C to – – – – 15 0C lab incinerator.
Temperature level in addition to 5% – – – – 95 % – of moisture problems.
? PLC controller along with an integrated temperature level panelita complete.
Automatic control, a control computer system, which is kept.
Information on the version of temperature degree relative to time in addition to.
Graphic images.
? have to have gas with automated control as well as malfunction.
Exploration system.
? the ability to pre- workout, body waste burning on along with off.
Uniformity is independent of the second as well as very first chambers.
? assuring the burner with electrical energy, it.
Must be set up on the generator.
? clean the heater should certainly be simple devices,.
Without making use of any type of sort of added devices



healthcare facility burner



Supply, arrangement and also screening of medical waste burner with an ability of 75 kg/ human resources gas (LPG) total amount with all devices and also as a result with the chimney based on the technical specs along with problems of public wellness
make a room for the burner that fit 3 burners as in thing 3.1.1 as well as affixed to the heater space waste store that match waste for a duration of 7 days as well as all the structures of boosted concrete with preparingg heater structure as well as also store with all the job of wiring, electric as well as illumination systems, water as well as likewise sanitation
supply incinerator structure in addition to the waste storeroom with a fire snuff out sprinkler system counts on the resource of the water from network of teh basic website, in addition to a fire alarm system consists of noticing systems for cozy, smoke as well as this system is related to the medical facility emergency situation alarm system systems
Supply, arrangement along with testing of the air circulation system of the burner room and additionally the stockroom with fans ROOF COVERING LEADING EXHAUET FANS supplying them with filters with high efficiency (HEPA FILTER trip to draw followers with taking the air modification price of 5 times per human resources with streams and additionally air needed grilles
Supply, arrangement, checking various conditioning system for waste database DUCTED SPLIT UNITES and capability sufficient to maintain the interior temperature level at 14 levels Celsius in summer season as well as winter season
Supply, setup, testing of the air conditioning store of shielded premade wall surfaces inside the waste space with an ability of 35 cubic meters to save the clinical waste at a temperature of no Celsius till losing consisting of the cooling device and also all accessories
RISKY wood.
play hardwood.
petroleum residual waste.
hydraulic hose system.
calcium hydroxide bags.
bags or wood boxes including cyanide.
medical waste.
filters.
pharmaceuticals.
NO HAZARDOUS sawdust.
plastic.
plastic as well as likewise textil awnings.
wood.
plastic bathtubs.
rubber.
hygienic waste.
EPPs.
plastic bags.
structure and also building and construction reoccuring.
infected dustcloths or towels.
plastic or packaging of food.
polyestirene recipes, glasses, spoon, fork, etc.Capacity burner medical waste to high burning temperature degree.
With an electric gizmo to shield the setting as well as with 2 combustion chambers furnished with burner or oil.
– – heater to lose big volume things of 70 centimeters.
discrepancy: Automatic Control System.
– – harmful ability from 20 to 30 kgs.
First-room/ Temperature level = 900 ° C combustion.
2nd space/ Temperature degree = 1200 ° c afterburner



dispose Medical waste IV



the incinerator can be made use of to do away with Clinical waste IV, used needles, utilized syringes, scalpels, made use of dressing product, private security gadgets like gown, gloves and so on truncated body components, excreta from clients and also various other research laboratory waste.incineration tools that can deal with a mix of clinical as well as contaminateds materials. The professional wastes contain (yet are not restricted to) products polluted with blood, physical liquids, feces, as well as additionally human tissue/organs from medical treatment. The dangerous substances include (however are not restricted to): xylene, toluene, chloroform, methylene chloride, trichloroethylene, acetonitrile, formaldehyde wastes, radiation treatment wastes (e.g., Chlorambucil, Cytoxin, Daunomycin, and more) radiology wastes (e.g., glutaraldehyde), as well as mercury-containing compounds.includes dismembered body components, body fluids consisting of polluted blood, blood products, excreta from people, cultures of communicable infections along with different other research laboratory wastes e.t.c.
Medical might also contain made use of needles, taken advantage of syringes, taken advantage of, ended or infected clothes items like plastics, plasters and plasters, e.t.c. The Burners ought to also allow disposal of other wastes created in medical care facility environment.Technical Needs for Portable Incinerators

The Chamber quantity of around 0.37 m3 and likewise a.
1 combustible lots amount (amount of product) of.

around 0.30 m3

2 Burner power of around 189,000 kcal/hour.
Optimum Burning Temperature level Level of approximately 1250

Degree Celsius.
Type of sent Gas: Inert as well as absolutely no ecological air pollution impact.
Electric Power: 220V/50 or 60 Hertz

Gas: Diesel

Electric consumption of approximately: 0.35 kw/hr

Gas usage selection: 7 – – – – 11 ltrs/hr

Controls: Burner control consisting of control board, timer, display screen for watching on combustion temperature level, system blunder present screen, and more
. Packaging/Installation: Heater totally established in addition to prepared to be linked in power source

Customer’s handbook: Bundle needs to be supplied user’s hands-on including defined info to installation, procedure, upkeep, analysis of issue shooting signals and also get in touch with telephones. numbers/emails of neighborhood or abroad provider’s specialists that can be required assistance on treatment of the gadgets, if needed.

training guide/manual on a cd consisting of a demonstration for installation, operation and also. maintenance, in addition to security criteria, etc.

Range of Supply: Package requires to be supplied consisting of. all the called for devices for installment as well as likewise must. contain spare parts/consumables that are required for a. one year period at a burning price of about 8 hrs. daily

Warranty need to be provided for a 5-years duration. starting with the heater’s arrangement and. including the arrangement of devices along with.
consumables



Clover's Social Media