Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

animal cremation equipment prices


 

 

The following requirements are to be considered as an integral part of the technical specifications for each equipment

type.

 

The system offered shall be designed to operate normally under the conditions of different regions in Kenya. These

conditions may include but not limited to power supply, temperature, humidity, and other climatic conditions.

 

A warranty for a minimum of 12 months must be supplied.

 

All text, parameters etc. on all control operating interfaces as well as on information displays and on print-outs

shall be written in English. The Bidder is responsible for all permits and approvals for importation. The Bidder shall

provide all the necessary documentation in order to facilitate the legal requirements for the installation and proper

operation of the equipment.

 

Period of Execution is 180 days from contract date covering delivery to the site and completion of all verification

operations required for the issuance of provisional acceptance.

 

Representatives of PATH and the Ministry of Medical Services (MOMS), together with the Bidder or Bidder’s

representative, shall carry out the controls, testing and initial approval for provisional and final acceptance. The

provisional and final acceptance shall take place at the final destination(s).

 

After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is

authorized by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by

the Manufacturer is available throughout the warranty period. In fulfillment of this requirement with their offer,

Bidders must submit a statement signed by the Manufacturer or an approved

 

representative of the Manufacturer:

oproviding the name and address of its authorized maintenance, service and repair centre,

 

oConfirming that this authorized maintenance, service and repair centre is able to rapidly supply genuine spare parts

and the consumables recommended by the Manufacturer.

 

The delivery and installation time must be agreed between Bidder, target Hospital and PATH. The treatment plant must

arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “

deck cargo.”


small incinerator for sale


Sterilization time: approx. 30 minutes at 121◦C/1.1 Bar or approx  15 minutes at 132◦C/2.5 Bar to achieve 6log10

sterility

Fragmentation inside the chamber: Heavy duty with maximum size of final product <20 cm.

Volume reduction of the waste after processing : by 60-80% through complete waste dehydration including liquid

content of the waste

All actions after loading for sterilization, fragmentation of product is to be occurred in the same chamber/vessel

Pre or Post-air evacuation should not be necessary or used

Exhaust air quality : Does not require any venting for odor control

Operating System: Fully automated with manual over-ride .(On board PLC capable of generating written report with

cycle time , cumulated time at >121◦C

The option should be there for Internet connectivity by phone, cable or

Boiler : should not require pre-heated water

Electrical requirements: 220Vac, 1ph or 400vac 3ph to suit customer needs

Noise level at full operation: <80 dB

Working Principle of the processor

The processor should utilize steam technology in conjunction with a mechanical fragment (grinder) to sterilize

medical waste, thereby making the residual waste safe for disposal in landfills.

The sterilization vessel MUST be a double walled (jacketed) cylindrical vessel.

Pre-shredding of infectious waste must not be accepted, the fragmentation must occur safely inside the scaled vessel

continuously.

The sterilization vessel/chamber must be fitted with a motor driven shaft to which a heavy duty grinder (fragmenting

arm) is attached inside the vessel to produce an unrecognizable size of the waste product

The fragmenting are must rotate to agitated continuously throughout the heating and sterilization cycle to ensure

that the fragmented & agitated wastes (including sharps and liquids) are exposed evenly to sterilization temperature

and pressure.

Steam heat should be applied to the jacket only, while the agitated waste absorbs the heat from the jacket and makes

its own steam from its moisture content.

Should not need for special autoclave bags- simple bag or box should be workable

MUST not need for pre-treatment of the waste.

Liquids and gases MUST remain locked inside the vessel until sterilization is complete-nothing should be vacuumed or

pumped out in its infected state.

Jacket steam heat to dehydrate the waste completely regardless of its original water content.

All the hot condensate from the jacket is recycled, making the processor very economical to operate

All particles of the waste should achieve a high level of sterilization and not just “disinfection” due to the

continuous agitation.

Description of the Treatment Cycle of the processor

i)Loading

The waste has to be loaded by dropping bagged and or boxed waste into the open loading door on the vessel.

The loading door should be mounted at an angle on the top side of the vessel with suitably sized to accommodate the

infectious wastes for which it is intended

Over-loading or loading too tightly should not be an issue with this process, and hence no need of the special

operator skill.

ii)Heat –up and fragmentation

After loading , the vessel door is to be closed, and the outer jacket of the vessel is to be automatically filled

with high temperature steam, which should act as the main heating medium for heating the waste

During this heating cycle, the shaft and mixing arms should rotate continuously, causing the waste to be fragmented

and continuously tumbled against the hot vessel walls.

At this point, the waste is broken up into small fragments, and all material heats up rapidly, being evenly and

thoroughly exposed to the hot inner surfaces. The moisture content of the waste will turn in to steam, and the vessel

will start to pressurize.

Initially, no steam will be injected into the waste. If there not enough moisture in the waste to pressurize the

vessel, a small amount of steam is to be automatically added until the desired pressure is reached.

At the end of the period, the correct sterilization temperature and should be reached, and the sterilization period

should start.

iii)Sterilization period

The amount of steam fed to the outer jacket is to be regulated to maintain the desired temperature & pressure of the

inner vessel.

The mixing arms (grinder)  MUST continue to rotate throughout this cycle to ensure even sterilization pressure and

temperature for all wastes.

The treatment time should be either 15 minutes at 132◦C OR 30 minutes at 121◦C  to achieve level 6log10 sterilization

The intense subjugation of the waste to high temperature and pressure moisture in a dynamic environment should also

cause the waste to hydrolyze, that is a rapid decomposition of organic material.

iv)De-pressurization

After the treatment time , the steam to the jacket should remain on, and the internal vessel is to

be vented through a condenser, and de-pressurized. Thus, the waste loses its water content

through a combination of heat input from the jacket and flashing of water due to

depressurization.

v)De-hydration

Further dehydration is to be achieved by maintaining heat input and mixing-almost total dryness should be achieved.


HEATER For incineration of Lab wastes products



Incinerators to be appropriate for the expert disposal of clinical & & & & medical waste/ rubbish with a better lots capability in the collection of about
1000-1500 Kg. The tough, self-contained burners will offer a exceptionally effective and effective, secure disposal in addition to be made according to appropriate globally directions, e.g. CE, EU, etc
. Sort of Gas: Diesel or Fuel or Gas. Temperature regulated,.
Maybe an incineration capacity of 200 kg/ human resources as well as also a calorific worth of 7500 kcal/ kg. Industrial and also domestical waste.INCINERATOR For incineration of Lab wastes materials

Functions.
i.Smoke as well as odor free.
ii.High Temperature level, refractory mobile lining with excellent heat retention.
iii.Quick heat up time.
iv.Must have a second chamber.
v.Constant run follower.
vi.Temperature monitoring.
vii.Thermostat Control

Technical Specs.
i.Capacity: approx. 0.20 m3.
ii.Fuel intake: 5 litres/ hour Diesel Oil.
iii.Min Operating Temperature: 900 oC.
iv.Max Operating Temperature: 1350 oC.
v.Residence Time: 2 sec.
vi.Burning rate: 35kg/hr minimum

Accessories.
Normal accessories needed

Consumables as well as also Saves.
Supplied with spares along with consumables to complete a minimum of 1000 assessments



hospital incinerator manufacturers


The incinerator fuel tank shall meet the following requirements:

  1. a) The tank shall be installed above ground and according to all of the fuel tank requirements in Section 1015

including secondary containment.

  1. b) The tank shall be sized to hold a 14 day supply of diesel fuel

 

6) Manufacturer has to provide the following capacity calculations and all supporting information for the incinerator:

 

– The daily waste stream rate (kg/day or lbs/day)

? Minimum incinerator burn rate capacities

–  Minimum cure time for the refractory to prevent cracking to the refractory

? A complete list of the maintenance parts

? A minimum of 500 lbs of refractory for repairs

? A minimum of 1 gallon of hydraulic oil

 

7) The contractor shall provide 3 pricing options:

Option 1: To Quote only for the Full System

Option 2: to Quote the price of Full System, and also the Installation

Option 3: To provide training to appropriate relevant staff according to the ‘Operations and Maintenance.


medcial incinerator manufacturer


The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests

so as to enable sending of one CEB Engineer for witnessing  of  the  factory  tests.    A  ‘Factory  Acceptance  Test

’  schedule  shall  be

 

mutually agreed between the successful Bidder and the CEB Engineer.

NOTE: All charges inclusive of air tickets, food & hotel accommodation, local transportation and other living expenses

for the CEB Engineer shall be borne by the successful Bidder.

The successful Bidder shall submit to the CEB Engineer the following documents prior to shipment of the incinerator

set.

 

 

?     Certificate of Conformity inclusive of the clause ‘We certify that, subject to exceptions or concessions

listed here after, the supplies detailed above were manufactured in accordance with the technical specifications of the

contract, order and that, all inspections and tests having been completed, the supplies comply in every aspect with the

relevant particular specifications, drawings, and relevant standards and regulations in force’.

?     Factory Acceptance Test(FAT) Certificates

?     Bill of Material (BOM)

?     Three(3) Complete Sets of As-Built Drawings

?     Installation and commissioning procedure for the incinerator set.

?     Program of works for carrying the installation and commissioning

?     Labour  and  logistic  requirement  for  carrying  the  installation  and commissioning.

?     All electrical drawings and wiring diagrams

Type of Waste: To treat medical waste, categories A, B, C, D,E

Type of incinerator: Pyrolytic

Nominal Burn Rate: 50 to 60 Kg/hrat  3500Kcal/Kg

Loading: Manual, Batch Load

De ashing: Automatic or manual batch de ashing

The incinerator must avoid the release of black smoke and

fine dust, during the loadings

Primary Chamber Capacity: 2 -3 m3

The insulation of the combustion chamber should be composed of

refractory bricks, having a high content of aluminium and insulates,

The plate of combustion in carborundum avoiding the fixing of

glass and slags

Hours of operation/day: >10 hrs

Max operating Temperature : 14000C

Normal Operating Temperature (Primary): >8500C

Operating Temperature (Secondary): >11000C

It should have temperature regulators in digital watch:

Carbon Content of Ash: <2%

The installation should be completely free from visible smoke as well

as offensive odours.

Residence Time in Second Chamber: 2 seconds minimum

The Internal diameter of the Chimney : Ø 400

Height of Stack:  >8 m

Burner operation: Automatic On/Off

Fuel: Diesel

Fuel Consumption at rated capacity: >7 Kg waste/ltr

Electricity Consumption: <2kW at rated capacity

Operating Voltage: 220-240VAC 50 Hz

Spare Parts: Supply for 1 year quoted as option

Consumables: Supply for one year of operation to be mentioned

as option

Warranty: Parts and service support: 1 year minimum post

commissioning

Service Support: <72 hours.

Emission Standards Compliance: BS 3316 or équivalent standard

Process Filtering system: Scruber to be mentionned as option

CE Manufacturing Compliance: BS EN 746-2-1997

Design Specification: Types A, B, C, D, and E of medical waste

Installation and Commissioning: Included in conditions of supply

Training in preventive and curative maintainance and use

of the incinerator: Operator training inclusive in offer

Capacity to treat Plastic: Not less than 40% by weight

Shed of the incinerator

Shelter of the incinerator inclusive in offer (the shelter must have

facilities for hand washing and firefighting).

This material and equipment must include in the shed of the

incinerator:

*   Foundation in rubble stone,

*   Isolation roofing against humidity;

* Elevation with brick of 20 cm (bloc cement), continuing lintel

(linteau) in reinforced concrete;

*  Steel frame (charpente en metal);

* Roofing in sheet B.C.A. 28 BG (Toiture en tôle),metal gutter,

*  Sanitary installation (wash basin, soak way pit of 20 m of depth);

*  Ash pit of 30 m3,

* Electrical installation;

* Concreteslab for fixing the incinerator;

* Chanel for evacuation of rain water or waste water

*  Wiremesh for aeration up the lintel;

* smoothrougtcasting of walls (interior and outside);

* plinth with cement;

*  2 metal doors ;

*  Enemail paintings inside and latex paintings outside the shelter

on walls and on doors;

*  Roofing limit (planche de rive);

*  Measures for this specification will depend on the size of the

incinerator which will determine the size of the shed of the incinerator.


Clover's Social Media