Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
diesel oil fired medical waste incenerator
High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber
(double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel Power Supply for control box 220V-240, single
phase 50-60Hz Minimum operating temperature 1200 oC One year spare parts package for complete maintainability 10m hose
pipe. 1100 litre fuel Tank +pipe system Containerised (the container will serve as housing) Additional chimney extension
1 metre high One (1) year warranty.
Incinerator of 20 Kg : 03 Units
Electrically controlled incinerator.
Two-compartment incinerator with a capacity of 20 kg / hour.
Incinerator with low maintenance and operating costs; Equipped with an automatic control panel and easy to use with
electromagnetic locking of the door.
A main waste reduction chamber of 900 ° C. A post secondary combustion chamber of gases generated in the primary chamber
at least 1100 ° C.
Carbon residues in ash less than 5% by weight in accordance with European Directive 2000/76 / EC.
With refractory lining in materials of higher quality
1/ Cost of a 200kgs/Hr medical waste incinerator.
2/ (CIF Term) Cost of shipping from factory to PAPUA NEW GUINEA seaport of LAE, Morobe province
3/ Cost of 2 Clover engineers to Supervise, Installation, Training our engineers and commissioning the medical; waste
incinerator.
scientific waste incinerator up for sale
Waste kind: health care waste
Waste density: 125 to 350Kg/M3
Waste calorific well worth: 4000KCAL/kg
Dampness web content: 10– – 25%. Approximated ash deposit: 5– – 10%. Nominal ability: 50kg/hr set lots.
2nd chamber: 2 [e-mail protected] C.
Environmental: NEMA ACT (EMCA) 1999, Waste Keeping track of plans, 2006.
Trick Burning chamber:.
The major burning chamber is the significant structure of the heater, produced from moderate steel plate in addition to tensed with rolled steel areas.
It is carried from the floor covering level on a considerable steel support structure. Inside the covering is lined with calcium silicate insulation as well as likewise a warm face combination of incredibly commitment brickwork or high stamina castable.
The main burning chamber must make certain minimum separation temperature level is not much less than 850? C.
One Hand-operated Lots Burner making up:.
Hand-operated loading door.
Straight strong fireplace, refractory lined primary burning chamber. Approximate. dimensions 800x2100mm( DxL).
Total sized mass load/ash elimination door.
1 off diesel-fired ignition burner– – temperature level managed.
1 off combustion air supply follower as well as distribution system, automated control.
High capacity second burning chamber with residence time very little less than 2 secs @ >> 850? C.
1 off diesel-fired afterburner– – temperature regulated.
Control panel– – automated treatment.
Temperature indicator additional and also primary chambers 0-1200? C.
Refractory lined flanged chimney to an elevation of 10M above ground level.
NB: The extra combustion chamber must make certain that the gas temperature level as gauged versus the within wall in the 2nd chamber & & & & not in the fire area, is not less than 1100? C
Throughput: 50kg/hr at a small calorific worth of 4,000 kca/kg as well as a typical mass density of 120kg/m3 for fundamental waste in addition to 160kg/m3 for healthcare waste.
Ash: The waste will be lowered by 90 ~ 95% to leave 10-5% ash.
Quality/Environmental Criteria: NEMA ACT (EMCA) 1999, BS3316.
Running period: prepared for day-to-day operating period 8 hours.
Maximum operating period: 12 hrs.
Chamber: must be refractory lined to the list below need;.
Hearth as well as additionally lowered section of chamber wall surface surfaces.
Warm face item:.
Super obligation firebrick.
Restricting constant solution restriction 1500? C.
Thickness: 100mm.
Thermal conductivity: 1.3 W/mk.
Insulation:.
Calcium silicate.
Limiting continual solution limit 1000? C.
Density: 25mm.
Thermal conductivity: 0.095 W/mk.
Chimney/Stack: Ought to be made from refractory lined modest steel or superb high quality air-cooled s/s.
The chimney/stack should have a minimal height of 10m over ground degree.
Ignition heating units: fully packaged oil kind, overall with electrical ignition in addition to fire failing controls, wired with continuous running follower in addition to complete with all shutoffs, fan as well as electric motor.
Optimum score: a minimum of 450kW/hr.
Heater: set up on/off procedure.
Maximum consumption: at the very least 6Ltrs/hr.
Typical intake: a minimum of 3Ltrs/hr.
Afterburner:.
fully packaged oil kind, total with electric ignition as well as additionally fire stopping working controls, wired with continual running fan as well as also amount to with all valves, fan as well as additionally motor.
Optimum rating: at the very least 450kW/hr.
Heating unit: arranged for on/off treatment.
Maximum use: at the very least 9Ltrs/hr.
Common usage: at the very least 4.5 Ltrs/hr.
Flue gas therapy: should have particle eliminator (scrubbers).
Electric supply: solitary stage: 220/240VAC; 50/60Hz
Documents:.
scientific waste heater to buy Procedure manual: 2 collections.
Service/maintenance manual: 2 sets.
Certification: NEMA (or other identified) certification.
Capability to solution tools: the agent/supplier will have sufficient centers, extra parts, consumables as well as likewise certified skilled technical team.
Training: the Agent will execute a 2 days heaters training after installment and likewise selecting of the devices.
The Rep will certainly do a 2 days procedure & & & & upkeep training to the Biomedical design workers after installation & & & & appointing of the devices.
Medical Waste Incinerator
Basic Info.
Product Description
Key Attributes: * All models with Dual combustion chamber. * Stainless Steel chimney/stack, long life. *according to order * High fever, long life of incinerator. * Free or minimal installation onsite. * High burn rate, from 10kgs to 500kgs per hourto 6ton per day. * PLC Control Plane. *according to order New Design for pet animal cremation business. * One year warranty on incinerator and components in stock.
Program Scope: 1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine. 2. 3. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation
TS model PLC incinerator is newest layout for waste treatment, include medical waste, animal cremation and other solid waste. This equipment caliber structural for kinds of website, like hospital, diesel-fueled medical waste incinerator, dioxine emission control medical hospital incinerator, disposal of biological waste incinerator, do they create a mobile creamation furnance for pets, environmental division, animal cremation agencies, etc.. CLOVER Incinerator provide updated models with double combustion chamber and smoke filter chamber with refractory lines, and the combustion chamber temperature up to 1200 deg C.
Items | Specification | ||||
Model | TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC) | ||||
Main Product List | Double Combustion Chamber | ||||
Smoke Filter Chamber | |||||
PLC Mode Control Case | |||||
Stainless Steel Chimney | |||||
Italy oil/gas burner: 02 units | |||||
Oil Tank (if oil fuel) |
Infectious Waste Incinerator
Product Description
Principle of the Incinerator Gear is incineration/combustion/burn.
The main body is 1 combustion chamber (at least), Refractory lineup or firebrick, Insulation materials and also the outer plate. Ignition element is external oil or gas burner. The burner can be running until squander burnout but for a few waste such as plastic, paper (sometime, mix coal with waste before feeding), they can combustion itself following Ignition. During combustion, burner has small medical incenerator, small medical waste incinerators, small medical waste incineration, small medical waste incinerator makers, small medical waste incinerators in china, a fan itself for Oxygen supply and protect burner prevent heat damage from combustion room. And, there a external fan blow air into combustion chamber. The Exhaust gas blow off following combustion.
Considering Environmental Protection requirements and rules, virtually all incinerator have secondary combustion chamber (after-burn, post-combustion), even when third combustion room. The secondary burner burn the Exhaust gas from primary combustion chamber, this technologies make sure adequate combustion, few black smoke and smell.
The upgraded incinerator technology focus on Exhaust gas treatment to remove Hazardous material and other function from incinerator, such as heat recovery (waste to energy), save fuel price, PLC Automation operation.
Item | Customer Request | Example |
Application Scope | |
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc |
What kind of waste? | ____, _____% ____, _____% ____, _____% |
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent if for animal/pet, indicate animal size like: cat, dog, cattle, etc |
Quantity Request | 01.02.03^…unit |
|
Budget | $US Dollar. |
|
Operating Time | The staff work Hours per day. Our incinerator can work up to around 18 hours per day. |
|
Realization Date of project | In ___ year | |
Waste Output Capacity per Day? | |
1000kgs Per Day^ |
Request waste burn rate | Capacity: 100kgs Per hour^ | |
Request waste feed capacity | Capacity: 100kgs per feed^ | |
Whether Natural Gas Supply Local? | Yes or No. | |
Local Power | If 380V and 220V valid? | |
Product Installation Destination | |
Country or City name |
DestinationSeaport name? | To check sea freight charge. |
|
Customer | End-Customer, Agent, Government. |
|
Method of contract | Tender or Negotiation | |
Date of Tender limit | ||
How did you know our company? | ||
Other request or information | |
In some Developed countries, some new waste treatment method such as High-temperature cooking, squander carbonization, crushing sterilization technology is instead of incineration technology.
Gas Incinerator
Basic Info.
Additional Info.
Product Description
How to Acquire Incinerator
1.
Nanjing Clover Medical Technology Co., Ltd. save all rights to mend/update product info on site. The specifications are subject to change without any previous notice.
2. We accept company term: FOB/C&F/CIF word, by sea/train, full container or bulk products. 1. FOB (Free on Board), the price leave China port. 2. C&F (Cost and Freight), FOB price and freight price. 3. CIF (Cost and Freight and Insurance ), FOB price and insurance fee and freight price. Payment Term: By sea: 50% deposit T/T (bank transfer) beforehand, and 50% equilibrium T/T before shipping day. By Train: 100% T/T in advance.
4. Shipping Document & Packing: Generally, We provide (1)Bill of Lading (Way Bill), what's sample…(2)Commercial Invoice, (3)Packing List ONLY. If any further documents/certification and tag print/words on packing material or documents which ask by importer or local traditions, whatever happen in China or oversea, should inform seller beforehand and charge as real price. By way of example, Fumigation Certification, embassy certification, BV/SGS…review, certification of initial (C/O), Form A, etc.. Buyer must to inform seller beforehand and pay these price. Seller save rights to postpone/cancel shipping and price on pet incinerationcost pet cremation equipementprices of animal incineratorsprices of pet crematorium chinaprices on pet cremation incentorators,ask lost price cause this event. In case the importer local traditions arrest/request penalty or other situation caused by buyer error, Clover Medical save all right to ask compensation/litigation. Thanks for your cooperation.
5. The major time is mostly 3-6 weeks, depending upon the products and volume. Guarantee: One year for the equipment. We provide spare parts for maintenance, free charge within the first year and also the delivery cost is on the purchaser. Insurance: Bear all risks of loss of or damage to the goods in the time they’ve passed the boat 's rail at the named port of shipment. We proposal apply All Hazards insurance under every contract. When purchaser pick goods at local site, must inspect carefully. If any damage happened under insurance coverage, buyer should inform insurer and Clover Medical Limitedimmediately. We’ll provide necessary assistance.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
1st. Chamber Temperature | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree |
2nd. Chamber Temperature | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |