Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
Small Scale Incinerators
Basic Info.
Additional Info.
Product Description
Incinerator
Basic Info.
Product Description
How you can find reasonable incinerator to your regional site? Incinerator isn’t a cheap equipment, normally the little scale model's price around $5, 000usd per unit and big scale model's price more than $50, 000usd per unit. Incinerator is a incineration gear, function is flame squander. So what sort of waste that you would like to treatment? B, little or big? This based on the waste output daily or the waste quantity per feed time, like animal size. Incinerator use oil or gas fuel, normally, gas fuel is cheaper than petroleum and the smoke cleaner than petroleum gas version. But some neighborhood site don't have gasoline distribution system. And other technology products, like power(220v, 380v), waste feed doorway kind, incinerator structure, etc..
A Model animal crematory burning speed from 20-400kgs a hour. Heavy duty combustion room and suit for big animal cremation.
Secondary Chamber & Mix-Combustion Chamber. In place combustion chamber. Practically smoke and odor free.
Smoke Filter Chamber with filter brick, Virtually smoke and odor free after burning.
Italy original oil or gas burner, quality dependable. It suit for petrol oil, natural gas, LPG gas.
User guider, full installation and operation document for client.
Items/Model | A1500 | A2400 | A4000 | A5500 |
Burning Rate *animal | 90 kgs/Hr. | 150 kgs/Hr. | 200 kgs/Hr. | 400 kgs/Hr. |
Feed Capacity *animal | 120 kgs | 200 kgs | 300 kgs | 500 kgs |
Equipment Weight | 7000 kgs | 8300 kgs | 13000 kgs | 16500 kgs |
Picture | ||||
Primary Chamber (Liters) | 1500 | 2400 | 4000 | 5500 |
Secondary Chamber (Liters) | 500 | 1200 | 1500 | 1500 |
External Dimensions (cm) | 240x170x380 | 260x220x420 | 320x220x460 | 360 x 220 x 475 |
Internal Dimensions (cm) | 150x100x96 | 220x110x100 | 257x147x108 | 300 x 147 x 125 |
Oil Tank(Liters) | 500 | 500 | 500 | 500 |
Door Opening (cm) | 59 x 81 | 90 x 110 | 108 x 128 | 108 x 128 |
Chimney (M) | 10 | 10 | 14 | 14 |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Secondary Chamber | YES | YES | YES | YES |
Mix-Combustion Chamber | YES | YES | YES | YES |
Smoke Filter Chamber | YES | YES | YES | YES |
Combustion Fuel | Oil/Gas | Oil/Gas | Oil/Gas | Oil/Gas |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Temperature Monitoring | YES | YES | YES | YES |
Waste Management Planning
The generator of a waste is responsible for its safe management from cradle-to-grave. Using raw materials efficiently and reducing the amount of waste generated is the most important step in waste management planning. For example, through improved waste management planning, it may be possible to reduce or eliminate the need to burn or incinerate waste altogether. Undertaking a waste audit will help to identify the type and amount of waste being generated, the costs of current management options and examine opportunities for better managing the waste. This information will also enable the generator to implement a waste management regime that is tailored to its own unique needs, location and circumstances.
Even with improved waste reduction measures in place there will be waste generated. Waste by its nature is usually a mixture of different unwanted materials. The segregation and diversion of different types of waste is an effective way to reduce the amount of waste requiring costly handling, storage, treatment and disposal. Segregation also enables the reuse of certain types of waste for a different purpose. Reuse activities may be undertaken either on-site or off-site.
Treatment and disposal is the last step in effective waste management and should be undertaken only after all other practical reduction and reuse options have been examined. A wide variety of treatment and disposal options exist and each must be examined before deciding on a final method, regardless of whether waste is to be treated and disposed of on-site or off-site. If burning and incineration is the method of choice, equipment must be designed and sized accordingly to accommodate the type and quantity of waste being produced. As described in the following section, open burning is capable of safely destroying a limited number of types of waste. While incinerators are capable of safely destroying a wider range of waste, many types of waste must still be diverted. Because of this, on-site segregation remains a critical component of any waste management plan.
Overall, the following principles should be used to guide responsible solid waste management planning:
Know your waste by conducting a waste audit.
Reduce the amount of solid waste produced by implementing strategic purchasing policies that focus on the substitution or reduction of purchased products as well as product design, composition and durability.
Reuse waste where different purposes can be identified.
Segregate and divert mixed waste streams enabling waste to be reused or recycled, thereby reducing the amount of waste to be disposed of.
All practical disposal methods should be examined. Burning and incineration of waste should be considered only where other practical methods do not exist.
If burning and incineration is used, the equipment chosen should be designed and sized to accommodate the waste produced, minimize fire hazard and result in the complete combustion of the waste.
incinerator for medical waste
incinerator for medical waste.Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc.). a diesel fired medical waste incinerator with a capacity of 300Kg/hr. to be installed at a waste disposal site away from populated areas.
Standards
1) Bidder or Manufacturer ISO 9001 Certified
2) Respecting international emission standards
Electrical characteristics
3) A 230V, 60Hz single-phase electrical source.
4) Protections against over-voltage and over-current line conditions.
5) Compliance with applicable Ghanaian standards and regulations.
Operational characteristics
6) Two-stage incineration with dual chamber combustion.Incinerator with Oil Burner .
Require Quantity – 1 complete Unit / Set
Type of Materials To be Burn – Solid Waste
Burner Capacity – 0.2 Kw ( 200 watts )
Capacity – 2 ton per day
Oil Tank capacity of Burner – 300 Lit
Oil pump capacity – 0.4 Kw ( 400 watts ).medical waste Incinerators for burning hospital waste
so we are looking for a source
university hospital incinerator manufacturers
The Incinerator Plant is outcome wastes incineration from Different petrochemical devices. In this task we desire to blaze all result wastes from petrochemical gadgets and also additionally produced high stress steam from heater plant heat produced.
In the starting outcome waste from petrochemical collects as well as also moves to transit as well as additionally setting up center in various types. Input feeds of heater plant are gotten listed below table:
health center incinerator suppliers, Waste streams of petrochemical device gather and additionally keep en path and also Arranging Facility.
En Path as well as Planning Facility one lab demand to be taken into consideration.
In this center, waste will be identified in 2 groups:
–– – –– Improper for burning
– – Wastes that can be gone back to petrochemical.
Appropriate wastes are recognized right into both categories: –– – Input wastes to revolving kiln, consist of solids as well as likewise waste fluids.
–– – – Input wastes to fixed kiln, include clean fluids as well as likewise gasses.
All strong wastes should be moved to storage area pit from Transport along with Sorting. Solid wastes storage space pit is input of rotating kiln.
All liquid wastes require to be maintained and kept in Transit as well as Arranging. All storage space as well as stablizing tools or center have actually to be taken into factor to consider.
Storage and stablizing capacity requirement to be considered based on worst circumstances (shut down).
Normally burner plant contains 2 similar trains (capability of each train is 100%). Each train contains a rotary kiln as well as a dealt with kiln.