Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
install a diesel discharged heater
blaze primarily drugs (all type of dosage kinds … … … … syrups, tablet computers, injectables) clinical consummabables, in addition to also biological liquids ……… ….
Capacity around 10 kg/ hr. set up a diesel discharged burner that can fit a collection tons of about 100 kg with an everyday burning requirement of approximately 500kg per 8 hour day. Industrial Burner to harm.
the drugs waste like Alu, PVC, PVDC etc.Installation for burning of pet dog waste cost, existence, settlement terms where it is feasible to acquire in Russia? I am aiming to for ability in between 200 -400 kg.
1.2 AREA PAINT.
Perform painting needed for area not or else specified, and also surface paint of things just keyed at the factory
1.3 LOCATION TRAINING.
a. Submit [6] complete duplicates of operating guidelines laying out the detailed procedures needed for system start-up, operation and also closure. Consist of in guidelines the supplier’s name, version number, service guidebook, parts noting, as well as quick recap of all tools in addition to their typical operating attributes. As well as additionally [Six] complete duplicates of maintenance instructions giving regular maintenance therapies, feasible break downs and additionally fix solutions, repairing guides, in addition to streamlined schematic representations for the system as set up.
3.6. Effectiveness.
Preheat the incinerator for 4 hrs to get to the shooting temperature of 982degrees C [1800] degrees F. Weigh and also tape the general fee weight. Charge the burner at the rated burning capability in kg extra pounds per hour for a period of [4] hrs in addition to run according to the manufacturer’s written guidelines. Contain in performance testing the treatment of the mechanical billing facilities, the burner, the air contamination control tools, the ash.
Carry out testing complete scale for a full- procedure cycle, and likewise keep an eye on performance to validate compliance with the arrangement requires send a record on security outcomes. After the burner has really cooled down, think about the residue. The weight of the deposit will not go past 5.0 percent combustible product of the total charge weight.
After clean-out, the burner will let down any kind of type of evidence of wear and tear, such as shagged or spilling refractory, bending of components, along with stained outside paint.
– – Control.
Test the incinerator under genuine shooting troubles. Validate with testing that all controls run within the optimum as well as minimum restrictions for temperature or timing. Mimic genuine high-risk issues such as warms as well as likewise fire failure by reducing the configurations for the activation of limitation as well as security controls.
– – Treatment Temperature.
Operate the burner under typical lots troubles for not much less than 6 hours. – – Gas syetem: Double gas( both oil as well as likewise gas)
Mobile Containerized Waste Incinerators HICLOVER CA-200
{
(adsbygoogle = window.adsbygoogle || []).push({});|}Design
CA-200
Photo
![]()
Burning Rate
Common 100 kgs/hour
Key Burning Chamber
2000 Liters
Secondly Burning Smokeshaft
Yes
Feed Establishing
Hand-operated
Voltage
220V
Power
3.0 Kw
Gas Kind
Diesel Oil
Heater
Italy Original
Oil Usage (Diesel Oil)
Typical 53 kg/hour
Interior Measurements
200 x 100 x 100cm (main chamber)
External Dimensions
290 x 200 x 170cm (key space )
Temperature Degree Screen
Yes
Oil Storage Tank Capacity( if petroleum gasoline )
500 Liters
Door Opening
90 x 90cm
Smokeshaft Size
5.0 Meters
Chimney Kind
Stainless-steel
Tools Gross Weight
9000 kgs( with container)
Procedure Technical Specs
Paimary Chamber Temperature
800 ℃–– – – 1000 ℃
Additional Chamber Temperature
1000 ℃ -1200 ℃
Residency Time
2.0 Sec.
Burning Efficiency
> 98 percent
Waste Lower Calorific Power
3000Kcal
2020-06-27
(adsbygoogle = window.adsbygoogle || []).push({});
Tel: +86-25-8461 0201
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]
Refractory Concrete Burner
• Using diesel as fuel
• Capacity 50kg per hour
• chambers material: Refractory Concrete
• Number of chambers: 2
• Manual feed
solicito un horno crematorio para mascotas, de una capacidad de 80 kl, aprox. Royal una unidad, especificaciones tecnicas, totalmente industrial, atte. erika martinez peru
two medical waste incinerators model YD-50, 150 kg feed capability, 220/380 V, 50 Hz c/w 5 mtr. chimney.
(adsbygoogle = window.adsbygoogle || []).push({});{
(adsbygoogle = window.adsbygoogle || []).push({});|}
Disinfecting/sterilizing the contaminated medical wastes, main combustion chamber, post combustion chamber, heat exchanger, ash removal units and flue gas treatment methods, with the following details:
Hourly capacity of this system: from 250 up to 500 Kgs/ hour
Duration of operation: by 14 up to 18 hrsdaily
Fuel type to be used: Diesel or other
Calorific value of this waste: 3500 up to the maximum limitation kcal/ Kg
Minimum operating temperature of primary space: 1000 degrees celcius
a medical waste treatment scheme in Sudan for medical, pharmaceutical, and hazardous waste
INCINERATEUR BURNING DAMAGES OF MEDICAL WASTE PYROLYTIC Along With LABORATORY
Usage diesel, construction in repainted steel resistant aluminium at heats up, fire device control indication, billing indicator, temperature level control gadget, melting ability of 250 kg/ hr in 2 phases (2nd and primary electronic camera).
INCINERATEUR BURNING DEVASTATION OF MEDICAL WASTE PYROLYTIC AND ALSO LABORATORY.
1. CAPABILITY OF GARBAGE DISPOSAL: 50à60 kg/ h.
2. CAPACITY OF PROCEDURE WITHOUT PREVENTING: 10h.
3. SUITABLE FOR WASTE CATEGORIES A, B, C, D In Addition To E MEDICAL WASTE BY UNEP In Addition To THAT.
4. BURNING “PYROLYSIS” by regulating the waste gasification.
5. CALORIFIC LOWER (LCP) WASTE OF THESE NECESSITY BE OF 3500 KCAL/ H. a burner with filling up indication, temperature level control features and with 2 chambers (key as well as added).
6. TEMPERATURE LEVEL MAX 1400oC DESTRUCTION.
7. MINUTES TEMPERATURE LEVELS OF DESTRUCTION 850oC.
8. LOSING AREA NUMBER: 2 (PRIMARY Along With SECONDARY).
9. VOLUME CHAMBER: 1200L.
10. MEASUREMENT OF THE LOADING DOOR: 70CMX70CM.
11. GAS KIND: DIESEL.
12. POWER SUPPLY: 220 V/ 380 V.
13. SMOKESHAFT ELEVATION: 40 CENTIMETERS.
14. BURNER.
15. VANTILLATEUR BLOCK.
16. BOX CONTROL AND ALSO REGULATION.Diesel medical waste burner made from steel painted in light weight aluminum.
along with resistente to heats, device indication for fire.
control, packing indicator, temperature level control device, burning.
ability of 250Kg/ 10 hrs in 2 phases (key chamber and also.
added chamber.one should burn 50Kg/hr an added 600Kg/hr and an extra, 1000Kg/hr. I have actually visited your internet site as well as would love to ask the adhering to questions:.
1. Are these units sustained by gas?
2. Do the devices ship absolutely created or in products?
3. Are smoke stacks consisted of?
4. Can the systems be established within a city area or should they be outside city restrictions?
5. What flooring area does each system call for?
6. What sort of enclosure is required?
7. What is the normal gas consumption for every device?