Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
Incinerator Furnaces for Pet Cremation
Basic Info.
Product Description
Key Features: * All versions with Dual combustion chamber. * Stainless Steel chimney/stack, long lifetime. *according to order * High temperature, long lifetime of incinerator. * Free or minimum installation on site. * High speed, from 10kgs to 500kgs per hour, up to 6ton per day. * PLC Control Plane. *according to order New Design for pet animal cremation business. * One year warranty on incinerator and components in stock.
Application Scope: 1. 2. Slaughter House &esign incinerator sampah, style of medical waste incinerator, design of little medical waste incinerator, designer medical incinerator, destructor incinerator, Pet Hospital &Farm: Dead Animal, Bio-Waste. 3. Community & Sea Port & Station: Municipal Solid Waste, etc. 4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation
Nanjing Clover Medical Technology Co., Ltd.. Is a top waste incinerator manufacturer in China. We are local manufacturer and among the largest exporter of China. Pyrolytic incinerator gear technical is primary waste treatment each one of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The potential from 10kgs/Hr. To 500kgs/Hr. Up to 6ton per day. Currently we provide different show for local client requirements and design upgraded incinerator with our top technology. The upgraded design feature of our range of incinerators create them among the most cost effective on the planet.
Items/Model | YD-200 | YD-300 | YD-500 | YD-600 |
Burning Rate (kgs/Hour) | 200 kgs/Hr. | 300 kgs/Hr. | 500 kgs/Hr. | 600 kgs/Hr. |
Feed Capacity (kgs) | 400 kgs | 500 kgs | 800 kgs | 1100 kgs |
Equipment Weight | 7600 kgs | 8300 kgs | 13000 kgs | 16500 kgs |
Primary Chamber (Liters) | 2000 | 2400 | 4000 | 5500 |
Secondary Chamber (Liters) | 500 | 1200 | 1500 | 1500 |
External Dimensions (cm) | 270 x 185 x 380 | 260x220x420 | 320x220x460 | 360 x 220 x 475 |
Internal Dimensions (cm) | 180 x 115 x 96 | 220x110x100 | 257x147x108 | 300 x 147 x 125 |
Oil Tank(Liters) | 300 | 500 | 500 | 500 |
Door Opening (cm) | 59 x 81 | 90 x 110 | 108 x 128 | 108 x 128 |
Chimney (M) | 10 | 10 | 14 | 14 |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Secondary Chamber | YES | YES | YES | YES |
Mix-Combustion Chamber | YES | YES | YES | YES |
Smoke Filter Chamber | YES | YES | YES | YES |
Combustion Fuel | Oil/Gas | Oil/Gas | Oil/Gas | Oil/Gas |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Temperature Monitoring | YES | YES | YES | YES |
chinese incinerator manufacturers
In a simple design with a metal steel drum electric. including:
A cage for receipt of biomedical waste;
A combustion chamber with fireplace with a filter to retain ashes;
A cover;
An air supply;
A turbine allowing the supply of the air.
Combustion temperature: 1800 ° C. Compliance with European standards.
Comes with all necessary accessories
Supply of incinerator model PDR-18 with:
· Capacity 100 kg/hr of waste containing up to 85% moisture
? Two combustion chambers
· Two fully automatic, oil fired, pressure jet burners
· Panel board
· Diesel tank of capacity 250 It. with 2 diesel pipelines, filter and valve.
Type: for animals waste
Capacity: 30 kg per hours for a maximum load of 120 kg.
GLP Gas
Voltage: 110V-120V
Semiautomatic control board
Stainless steel chimney, 3.5 meters above the incinerator.
High temperature painting for all the incinerator.
Front door for loading and unloading.
Fuel Diesel Oil 8/ kerosene
Capacity (m3) 0.57
Ave Capacity 50 kg per hour
Ave time for Burnout 5 hrs
External Dimensions
Length 2000mm
Width 1100mm
Height including flue 3500mm
Door opening
Internal Dimensions
(primary chamber)
Length 1200mm
Width 620mm
Height 660mm
Operation
Min. operating temperature 9500C
Max. operating temperature 13200C
Residency time in second chamber 2.0 seconds
Weight 1850kgs
Ancillaries
Operating and maintenance manuals
Recommended Spare list
300 liter fuel tank
Plant burning rate – 100kg/hr
Fuel – Diesel oil – 35 sec Redwood
Overall dimensions are as follows:
Width 2261mm
Length 3264mm
Chimney Diameter – 390mm
Chimney Height – 8000mm
chinese incinerator manufacturers, We process 8-10 ton waste of sheep carcass and its byproduct per day. We are looking for the equipment: combustion burners(combined fuel supply:natural gas and diesel),control panel and filter system. The diameter of the incinerator is 20 cm. Lower calorific power of the waste is 4KW/KG. Heating power 4000KW
U.S. needs to rethink Ebola infection controls, says CDC chief
Medical experts need to rethink how highly infectious diseases are handled in the United States, a U.S. health official said on Monday, after a Dallas nurse contracted Ebola despite wearing protective gear while caring for a dying Liberian patient.
As an outbreak of the deadly virus spread beyond West Africa, hospitals and nursing associations across the United States were taking a closer look at how prepared they were to handle such infections.
“We have to rethink the way we address Ebola infection control. Even a single infection is unacceptable,” Dr. Thomas Frieden, director of the U.S. Centers for Disease Control and Prevention, told reporters. “The care of Ebola is hard. We’re working to make it safer and easier.”
Frieden said health authorities are still investigating how the nurse became infected while caring for Thomas Eric Duncan in an isolation ward at Texas Health Presbyterian Hospital.
Duncan died last week and the nurse is the first person to contract the virus on U.S. soil, taking concerns about containing its spread to new heights.
The infected nurse is Nina Pham, 26, according to a Sunday school teacher at the church where her family worships and through a public records check of her address. Attempts to reach her family were not immediately successful.
The family was in shock when it learned the young woman had contracted Ebola, said Tom Ha, a close friend of the Pham family who is also a Bible studies teacher at the Our Lady of Fatima Catholic Church in Fort Worth.
“The mother was crying, very upset,” he told Reuters.
The Dallas nurse is “clinically stable,” Frieden said, and the CDC is monitoring others involved in Duncan’s care in case they show symptoms of the virus.
Frieden also apologized for remarks on Sunday, when the nurse’s infection was first disclosed, that suggested she was responsible for a breach in protocols that exposed her to the virus. Some healthcare experts said the comments failed to address deep gaps in training hospital staff to deal with Ebola. [ID:nL2N0S8014]
“I’m sorry if that was the impression given,” Frieden said. He said the agency would take steps to increase the awareness of Ebola at the nation’s hospitals and training for staff.
The Texas Nurses Association defended Pham in a statement, saying it was wrong to assume the nurse was to blame.
“The facts are not known about how the nurse in Dallas was exposed,” the association stated. “It is incorrect to assume that the nurse failed to follow protocols.”
At his news conference, Frieden said some changes in procedures had already been put into effect, including having staff monitor those putting on and taking off protective gear, and retraining staff on how to do so safely.
He said other steps were being considered including new types of protective clothing and possibly spraying down staff with solutions that could kill the virus if someone were to become contaminated.
Dr. Anthony Fauci, director of the National Institute of Allergy and Infectious Diseases, said in an interview with ABC that officials should consider sending Ebola patients only to a few “containment” hospitals.
President Barack Obama was briefed by Frieden and senior members of the administration about the second Dallas case and stressed that “lessons learned” from the CDC’s investigation should be shared with hospitals and healthcare workers across the country, the White House said.
Obama also spoke separately with U.N. Secretary General Ban Ki-Moon and with French President Francois Hollande about international efforts to contain the outbreak and to provide treatment centers in affected African nations.
A brief scare at Boston’s Logan International Airport caused emergency crews in protective gear to remove five passengers with flu-like symptoms from Emirates flight 237 from Dubai, but the CDC later said there was no Ebola threat.
EBOLA WASTE A CONCERN
Meanwhile, Louisiana’s top law enforcement official said he was granted a temporary restraining order to prevent the personal items of Duncan, who died on Wednesday, from being buried in a local landfill after being incinerated.
Louisiana Attorney General Buddy Caldwell said material collected from Duncan and the Dallas apartment where he was staying was taken to Port Arthur, Texas, on Friday to be incinerated. From there the incinerated material was to have gone to a hazardous waste landfill in Louisiana.
“There are too many unknowns at this point, and it is absurd to transport potentially hazardous Ebola waste across state lines,” Caldwell said in a statement after the restraining order was granted.
According to CDC guidelines, the Ebola virus does not survive on materials that have been incinerated.
The current Ebola outbreak is the worst on record and has killed more than 4,000 people, mostly in West Africa’s Liberia, Sierra Leone and Guinea. Duncan, a Liberian, was exposed to Ebola in his home country and developed the disease while visiting the United States.
Ebola, which can cause fever, vomiting and diarrhea, spreads through contact with bodily fluids such as blood or saliva.
The infection of the Dallas nurse is the second known to have occurred outside West Africa since the outbreak that began in March. It follows that of a nurse’s aide in Spain who helped treat a missionary from Sierra Leone, who died of the virus.
Officials said Pham’s pet dog, a 1-year-old King Charles Spaniel, would be kept safe while its owner was in the hospital. That contrasts with the dog of the health worker in Spain that was euthanized out of fear the animal could spread the disease, prompting protests from animal rights activists.
(Additional reporting by Julie Steenhuysen in Chicago, Jonathan Kaminsky in New Orleans, Marice Richter in Dallas and Roberta Rampton in Washington; Writing by Jon Herskovitz and Ken Wills; Editing by Michele Gershberg and Lisa Shumaker; Editing by Andrew Hay and Tom Brown)
FILED UNDER:
U.S.
Health
animal crematory equipment
- ii) The visual alarm must be specific to the problem and remain on until the alarm condition is corrected; it should
not be possible to turn off the visual alarm.
- i) Construction Quality
- i) The unit should have no sharp edges.
- ii) All external components should be securely mounted.
iii) The unit should be secure and provide adequate protection against moving and electrically energized parts.
- iv) The unit should be well constructed with durable materials to withstand typical abuse and cleaning.
- v) Switches, knobs, and other controls should be designed for conditions of heavy use.
- vi) Wiring and tubing should be neatly arranged and bundled, if appropriate. vii) Mechanical, electric, and pneumatic
terminators, connectors, sockets, and
solder joints should be designed to prevent fluid penetration, incorrect connections, and mismating of fitting and
couplings.
viii)Connections should be secure to resist accidental disconnection and should maintain sterility, when appropriate.
incinerator for medical waste
Lifting Chains: Must be dual lifting chain of roller style & must meet safety factor at least 6:1.
Hydraulic System: Durable cylinder with a chrome plated ram and a relief valve for overload protection
Forks: Heavy duty steel approx. 4.0” wide x 42” long fixed forks
Platform: solid steel
Battery: A heavy duty 12 volt, 125 amps/hour industrial strength battery.
Battery Charger: Must be built-in battery charger, rectifier type with transformer, circuit breaker and overload
protection plugs into any 220VAC outlet.
Steering: A pallet truck style steer handle for easy maneuverability.
Wheels: approx. 5” phenolic rear casters for steering and approx. 4 “ phenolic wheels with roller bearings located
in the straddle legs.
Brake: A hand controlled floor lock brake that secures the until in place.
Specifications:
Load capacity: approx 1,500 Ibs
Load centre: approx 24 inch
Raised fork height : to suit customer needs
Overall mast height : to suit customer needs
Lowered height: minimum 4.0 inch
Fixed fork width: approx 7 inch
Fork length: approx 42 inch
Platform of approx. 25” x 25 “
Overall width approx 25 inch
Castors: approx 5 inch phenolic
Front wheel: approx 4 inch phenolic
(G)Technical Specification of Spore tester
Features and Specifications
It is an Auto-reader for Bacillus Stearothermophilus to test the spore in the discharge after treatment
(Sterilization) of the waste.
Should be a very Accurate, reliable and easy-to –use units for reading Rapid Readout Biological Indicators (RRBI)
for Steam Sterilizer
Automatically reads indicator results.
There should be a red plus (+) light to indicate sterilization failure and a green negative (-) light to confirm that
the sterilization conditions have been met.
Available alarm in case of positive detected and RRBI is removed from the reader before final results have been
detected.
There should also be a Buzzer alarm OFF button.
The unit should be maintenance-free equipment and there should not be any light bulbs to replace for maintenance.
At least 12 Incubation/reader wells
A crushing well
Digital display
A Press-button by pressing which, the incubation time remaining for each individual incubation/reader well that
contains a RRBI will be displayed.
Power: 220 VAC , 50Hz
Accessories to be included
Samples/kits-100 pcs
Documents to be submitted as follows-
Fabricators accreditations
Test Report to prove ZERO harmful emission level provided as samples from other installations
Test report to prove sterility achieved at 6log10 level to be provided upon commissioning report and validation
Technical proposal must include:
The hospital should provide the necessary space; building & infrastructure; Sufficient Power, steam supply and
connection up to room; water & Sewage line to the room.
Room Preparation: Preparation, Renovation & Modification of the room is suppliers responsibility
The supplier should submit the necessary drawing(s) showing space requirement (room size (L x W x H ) , dimensions
of processors & ancillary equipment.
Supplier must give the proposal of the total power requirement of the whole until and on which the hospital will
ensure the power supply. However, connections inside the room is suppliers responsibility
The connection/fittings from the processor and ancillary equipment to water and sewage line is suppliers
responsibility
A detailed training proposal including the duration of staff training on how to operate and maintain the processor.
A detailed maintenance schedule.
List of Spare parts and accessories required for maintenance of the system
Warranty & After Sales Services:
Warranty period will be minimum 03 (three) years or as offered by the manufacturer which comes later.
Warranty period will be counted from the date of handing over of machine to the user in functioning condition i.e.
date of commission
In warranty period the supplier have to provide all maintenance & repair services.
Brach time will not be counted in warranty period.
At last 10 year back up services (including warranty period ) has to be ensured by the supplier.
The repair/maintenance work should be carried out within 72 hours after getting request for such from the user.
Quality Standard: CE/FDA certificate of the offered item must be submitted with the offer
For verification of the certificate bidder must submit the followings:-
i)Mailing Address of the issuer of the certificate
ii)Web-site, e-mail address & Fax & Telephone Number of the issuer
The bid will be non-responsive if:-
i)The certificate issuer cannot be reached
ii)The issuer fails to authentic the certificate within the bid validity
iii)The issuer confirms that the submitted certificate is defective in terms of authenticity or validity.
Failure to establish the authenticity of the certificate the bidder is liable to render the bid non-responsive and
the bidder open to action in the line with applicable regulations and act.
oOriginal catalogue must be submitted
oOriginal data sheet must be submitted.