Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
Pet Animal Cremation Machine
Planning application submitted for massive Deeside incinerator plant.
The American-owned firm behind the Parc Adfer waste treatment facility has submitted its planning application to Flintshire County Council.
Energy-from-waste specialist Wheelabrator has submitted plans for its proposed 200,000 tonnes per year capacity incineration plant on the edge of Deeside industrial estate.
The company was named as the preferred bidder for a 25 year contract to treat household waste on behalf of North Wales Residual Waste Treatment Project (NWRWTP) – the five council partnership which includes Flintshire, Isle of Anglesey, Conwy, Denbighshire and Gwynedd.
The firm hopes that planning consent could be granted during the first half of 2015, allowing construction work to commence late in the year.
If successful Wheelabrator expect the facility to be operational by 2018, the site will the then supply waste heat through steam pipes to nearby industrial or commercial users, as well as incinerate tonnes of household waste, diverting it from landfill sites.
According to the five councils, the facility will help them towards meeting the Welsh Government target to recycle 70% of waste by 2025.
30 kg per hour-incinerator
Secondary combustion chamber shall be either the rotary- or stationary-hearth (or kiln) type incinerator designed to
oxidize (or burn) the organic vapors and gases. Burner and combustion air controls shall be fully automatic
Diesel incinerator of 25Kg / h
Box
Box dimensions of the incinerator.
Approx Width: 900 mm
Approx: 1000 mm
Approx height: 1000 mm
Dimensions of the chimney
Min height: 6000 mm
Diameter: 300 mm
Provided with two primary and secondary chambers.
Primary chamber volume: 0.25 m3
Secondary chamber volume: 0.25 m3
Made of steel with refractory lining
Door removal of grays
Display draws in both chambers
Temperature probes PTC type
Burners
Thermal Power Max: 5100 Kcal / h, 59 kW
Min 1700 Kcal / h, 20kw
Consumption approx. 2.6 to 5.0 kg / h
Voltage 230V-50Hz
Fan 75W, Rotation 2800 Rpm
Ignition transformer
Ignition means electrodes
Controller burner
Table controller
Thermometer digital camera primary and secondary
Regulating combustion head
Air regulation
Fuel: Diesel
China Arrests 60 For Waste Incinerator Protests
Early this week, protests erupted in China over plans to build a waste incinerator in an eastern city where officials didn’t seek public approval before proceeding. The demonstrations have been running for more than two weeks and turned violent on Saturday, with hundreds of police descending on to the streets of Yuhang, close to the eastern tourist city of Hangzhou. Previous to this week, officials repeated in state media that they would seek public support for the incinerator, but recently have made dozens of arrests in Hangzhou, with at least 10 demonstrators and 29 policemen injured.
Waste incinerators without proper emission filters can release the carcinogen dioxin, said Wu Yixiu, head of environmental group Greenpeace’s toxics campaign in East Asia. Several neighbors of the Hangzhou site cited that risk and noted that incinerators in Germany were required to filter out the toxin. Following large protests in March against a proposed paraxylene plant in the city of Maoming, officials said they would not proceed with facilities if public resistance remained high.
China’s fast growing cities produce around 160 million tons of domestic waste each year, according to domestic reports, and the country is planning around 300 such incinerators within the next three years as part of a “Great Leap Forward in garbage incineration”. For years, China witnesses tens of thousands of so-called “mass incidents” which have recently been linked to several environmental issues. In March, Li Keqiang, the prime minister, vowed to “declare war” on pollution and said his country would turn its back on “inefficient and blind development.”
BIOHAZARD DISPOSAL INCINERATOR CONTAINERISED IN A 20 FEET CONTAINER
BIOHAZARD DISPOSAL: CONTAINER
GENERAL INCINERATOR, SUITABLE FOR INCINERATION OF VARIOUS KINDS OF WASTE, ABSOLUTELY CONTAINERISED IN A 20 FT CONTAINER, TO CONSIST OF BUILT-IN FUEL CONTAINER As Well As GENERATOR.
TECHNICAL SPECS: SHEDDING CHAMBER AMOUNT (M3); 0.54 m3. SUGGESTED SET SIZE: 60 KG, BURN COST: 69 KG PER HR, STANDARD GAS USAGE 13 KG PER HR, OPERATIONAL TEMPERATURE: 950-1320 CELSIUS, GAS RETENTION IN SECONDARY CHAMBER 0.5 SECS, WITH TEMPERATURE LEVEL. MONITORING, STANDARD ASH DEPOSIT: 3%, THERMOSTATIC TOOL: YES,
DIMENSIONS: OUTSIDE LENGTH (mm): 1520MM, EXTERNAL SIZE (mm): 920MM, EXTERNAL HEIGHT (mm): 4020 MM
1. Burner for Bio-Medical Waste incineration needed
2. 50 kg/hr
3. 2 chambers have to exist
4. temperature degree of main chamber ought to be 850 levels Celsius
temperature level of added chamber must be 1200 levels Celsius