Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Clover Medical Limited a Top Waste Incinerator


Basic Info.

Model NO.:construction of an incinerator
Export Markets:Global

Product Description

Incinerator is a incineration gear, direct fire squander by gasoline fuel or oi gas. As distinct circumscription, incinerator could be termed many words as below: 

Treatment ability: Small scale incinerator, large scale incinerator and incineration pant. 

Waste substance: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, individual cremators 

Incinerator gas: Gas incinerator, oil incinerator 

Waste to Energy (WTE): WTE incinerator, non-WTE incinerator 

Incinerator Manufacturer: China incinerator producer, UK incinerator producer, USA incinerator producer, India incinerator manufacturer. 

Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India) 

Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

A PYROLYTIC MEDICAL WASTE BURNER FOR LARGE VARIETY



NEEDS OF A PYROLYTIC MEDICAL WASTE HEATER FOR BIG VARIETY
1. Capability of damages in weight: 500 kg/h.
2. It must have the capability to run very little less than 8 hours/day
3. This burner should be able to wreck all combustible wastes produced by medical facilities, personal facilities, laboratories, institutes, and so on
4. Design Spec: Kinds A, B, C, D, as well as additionally E of clinical waste.
5. PYROLYTIC combustion, by regulating the gasification of waste.
6. The incinerator needs to prevent the launch of black smoke and additionally great dust, (Smokeless) during the loadings.
7. It should have the ability to reduce the volume of wastes by 98%.
8. It needs to have the capability to hold discharge in the second melt with gas house of very little less than 2.
secs.
9. The incineration should be entirely lacking obvious smoke in addition to offensive scents.
10. The lower calorific power (L.C.P) of this waste will certainly be 3,500 kcal/kg.
The Temperature degrees of combustion: Minimum will certainly be 850oC as well as also max 1400oC.
Post combustion: >> 1100oC.
11. The Inner size of the Smokeshaft: Ø 400 and also its elevation: 8 m.
12. The Quantity of the burning chamber: 1.200 L.
13. The Measurement of the door for loading in centimeters: 120×× × × 120.
14. Burner procedure ought to be Automatic On/Off.
15. Gas: diesel/Gas.
16. The vendor has to supply required details for the very best of the installment This burner with PYROLYTIC burning require to have:
17. A burning chamber of waste:.
* Totally limited door for the hands-on loading of waste. The loading must be Handbook, Establish.
Load.
* A heating unit of lighting which the use is limited to the ignition of waste.
* Frontage of packing with door seals increased on hinges, wheel of screw plug, versatile joint, in addition to packing shielding out of refractory.
* The insulation of the burning chamber must be composed of refractory blocks, having a high product of aluminium in addition to secures bricks in order to guarantee a minimum temperature level on.
the outdoors sheet steel.
* Make-up of the refractory;.
Refractory concrete:
. Thickness: 100 mm
. Nature: 42% of Al203.
Shield in crude panels:

. Thickness: 75 mm.
Nature: Calcium silicate.
* Burner of illumination of waste, with gas, traditional mono-bloc casting leading diving flame, lighting as well as safety and security as well as safety and security of digital ignition, long-lasting air flow, electro-magnetic sluice entry of guideline and likewise isolating valve.
* Plate of burning in Carborundum, staying clear of the fixing of glass as well as slags.

18. A chamber of write-up burning of gases.
* A heating system of combustion of gases,.
* A tool of injection of air enabling a total recombustion of gases,.
* A device of air inlet of air conditioning of waste gases,.
* A sheath of emptying of the gases shed.
* Carcass in solid sheet steel with assistance of link.
* Cosmetics of the refractory;.
Refractory concrete:.
Thickness: 150 mm.
Nature: 65% of Al203.
Protect in coarse panel:.
Density: 85 mm.
Nature: Calcium.
* Heating system with gas, mono-bloc spreading assisting kind with straight fire, lights as well as safety and security of electronic ignition, lasting air flow, electro-magnetic sluice entryway of policy and isolating shutoff.
* A second injection of air to make sure best oxygen product.
19. A control box making certain the total cycle of combustion.
20. An Air contamination control device connected to the flue smokeshaft must be connected to quit.
unneeded retreat of impurities

21. Fan:.
* Electro-ventilator dispersing the second air, the policy of the air flow being implemented by valves along with following the control of the automatic cycle.
22. Controls and additionally regulations:.
Control box watertight to dust, consisting of:

* A button circuit breaker for each engine (ventilators along with heaters).
* A timer with adaptable temporization for the standard of each burner.
* A regulative authority with look for the temperature level of burning.
* A governing authority with watch for the temperature of blog post combustion.
* Electric box.

21. The de- ashing should be performed in all-time low of the combustion chamber or the deashing should be Automatic or hand-operated set de ashing.
22. Fine-tune Filtering system: Scruber to be mentionned as optional.
23. Release Needs Conformity: BS 3316 or équivalent standard.
23. Capacity to deal with Plastic: Very little less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997

23. The company should give batches of added components of very initial seriousness in addition to consumable of the burner.
24. The mounted incinerator needs to bear a one year guarantee.
25. The supplier will certainly execute an onsite installation of the burner.
25. The technical training of chauffeurs will certainly need to be provided as well as additionally provided by a service technician from the production facility; it will absolutely consist of medical as well as additionally preventive maintenance, as well as additionally utilizing manufacturer, etc

NB.: Civil jobs as well as likewise any kind of various other connected solutions for the configuration and likewise training of operators need to be consisted of in the heater s expense.



Little Scale Medical Waste Coronovirus (Covid 19) Burner 30 kgs per hr Model TS30 PLC Vehicle Control


Items/Model

TS30( PLC)

Picture

Dropped Price

Regular 30 kg/hour

Feed Capability

Typical 60kg per feeding

Control Placing

PLC( Programmable Reasoning Controller Heater)

Vehicle Control as well as Display

Burning Chamber

330L

Internal Dimensions

75x75x60cm

2nd Chamber

180L

Smoke Filter Chamber

Yes

Feed Setting

Handbook Feeding

Voltage

220V

Electricity

0.5 Kw

Oil Consumption (kg/hour)

Typical 13.3

Gas Intake (N.G, m3n/Hour)

Typical 16

Gas Use (L.P.G, m3n/Hour)

Typical 11.7

Temperature Level Screen

Four Digital Show

Temperature Level Defense

Yes

Oil Container

200L

Feed Door

55x50cm

Chimney

5Meter

Smokeshaft Kind

Stainless-steel

1st.

Gross Weight

3000kgs/4000kgs

Outdoors Dimensions

175x120x140cm

2020-03-26

3000kgs/4000kgs

Outdoor Dimensions


HICLOVER – Medical Environmental 

175x120x140cm


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-26


Small Veterinary Incinerator 20 Kg Hour Burn Rate


Basic Info.

Model NO.:smallest waste incineration into energy system
Export Markets:Global

Product Description

Waste Incinerator International Market Analytics  Date.

Keyword:  Little incinerators  Medical waste incinerator  Pet animal cremation incinerator  Incinerator manufacturers 

Incinerator is a incineration equipment, direct fire squander by gasoline fuel or oi fuel. As distinct circumscription, incinerator can be named many words as below: 

Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant.  Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, individual cremators  Incinerator fuel: Gas incinerator, oil incinerator  Waste to Energy (WTE): WTE incinerator, non-WTE incinerator  Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.  Famous Incinerator manufacturer firm: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India)  Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour 

Pyrolytic incineration technical is traditional waste treatment solution for many years. All over the world, in many nations, individuals anti incinerator because the incinerator will create a sizable Dioxin in the smoke. Dioxins can be released to the environment through forest fires, backyard burning of trash, particular industrial activities, and residue from past commercial burning of waste. Dioxins break down very slowly and past releases of dioxins from the man-made and natural resources still exist in the environment. Medical incinerators 40 kgs capability, medical incinerators china, medical incinerators manufacturer, medical solid waste incinerator 100kg, medical wast incinerator, Anyhow, we have to remind that, this is large scale incineration pant, normally more than 30 ton per day. This is a societal issue, to examine and indicate ways in different angles in the general public, government, economic development, environmental protection, technology development, etc. 

So, why people still use incinerator?  First, for your medical waste from hospital, the pyrolytic incinerators is best treatment up to now. Pyrolytic technology can kill the virus, pollution management.  Secondly, for individual body, pet creature, in many nations and regions, we desire to cremation them. This is the service in the procedure for society development, and ceremonies to commemorate the disappearance of existence. 

As above two rationale although not only above, we nevertheless use incinerators. 

How you are able to discover reasonable incinerator to your local site?  Incinerator isn’t a cheap equipment, normally the small scale version 's cost around $5, 000USD per unit and large scale version 's cost more than $50, 000USD per unit. So, before purchase one unit incinerator, you have to make clear following things: A, burn what? Incinerator is a incineration equipment, function is flame squander. So what sort of waste that you would like to cure?  B, small or large? This according to the waste output every day or the waste quantity per feed time, like creature size.  C, fuel? Incinerator use gas or oil , normally, gas fuel is less expensive than oil and the smoke cleaner than oil fuel model. However, some neighborhood site don't have gasoline supply system.  Along with other tech items, like electricity (220V, 380V), waste feed doorway kind, incinerator structure, etc..

Once you clarify these, it is possible to go to discover a local or international producers, asking prices, technical specifications and finally purchasing the right products. 

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Clover Medical Medical West Incinerator


Basic Info.

Model NO.:china animal incinerator manufacturer
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What’s kind of waste can utilize within this equipment?  A: This equipment for medical waste, pet creature, Municipal waste, dwell waste. Prohibit any explosive and radiation substance, liquid gas and waste waste. 

Q: Incinerator Smoke Standard  A: China Government Standard: No. GB18484-2001.  The animal/pet combustion rate around 2/3 of ordinary power. 

Clover incinerator utilize time per day up to 24 hours. Between each feed/combustion time, you will find about 0.5-1 hours cooling time plus time to get feeding waste. Actual combustion time daily is around 16 hours. The lifetime of incinerator involving 5-10 year based on usage. 

Ordinarily, we proposal little lab, little clinic use capability under 20 kgs per hour. If incinerator use in hospital, then please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed at the hospital, that's mean you need one incinerator capability around 400kgs daily, change to power per hour is around 30-40 kgs per hour. Incinerators 150 kg per hour, incinerators 300 kg per hour, big incinerator, medical incinerator design, health incinerator Italy, According the performance time per day, waste material, budget, development, etc, you can use ability from 30-50 kgs per hour incinerator.  *How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing  A: We provide all files and incinerators simple to setup and operation. Client can send people visit our factory to find out operation and installation. Generally, we don’t send engineer to neighborhood site if not request. The dispatch cost is extra based on order. 

Q: Combustion Temperature  A: The first combustion chamber: 800-1000 centi degree.  The next combustion chamber: 1000-1200 centi degree.  PLC mode based on order and model. 

Q: Operation and maintenance costs  A: Operation cost based on fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according model, use situation. 

One individual can service 02 device incinerators. The staff should have fundamental electrician understanding to operate/inspect/maintaince incinerator/burner/blower based on performance user guider, and understand risk of medical waste to safeguard worker self with essential protection element. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Clover's Social Media