Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Incinerator Double Chambered 300kg/Hr


Basic Info.

Model NO.:incinerator burner model for cremation croupes
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Product Description

Items Specification
YD Model YD-30 / YD-50 / YD-100 / YD-150 / YD-200 / YD-300 / YD-500 / YD-600
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Nanjing Clover Medical Technology Co., Ltd..

Containerized Mobile Incinerator Version CA50



Waste Burner

(Containerized Mobile Heater)

Ability: Normal 50 kgs per human resources


Style

CA50

Inside Dimensions

100 x 80 x 70 centimeters

Main Product Listing

Main Burning Chamber

Added Burning Chamber

Smoke Filter Chamber

Heater Control Situation

Smokeshaft:5.0 Meters

*( upgrade to Stainless-steel, cost-free rate)

Italy oil/gas heater: 02 systems

Oil Container (if oil gas): 200Liters

ISO 20′ ′ ′ ′ Container( Shipment with Burner)














Variation

CA50

Waste Treatment

Waste Incineration Treatment

Feed Capacity

Regular 100 kgs per feed

Burning Price

Regular 50 kgs per hr

Burning Time per Feed

Criterion 2 hour

Control Setting

PLC( Programmable Logic Controller Incinerator)

Voltage

220V

Power

0.7 Kw

Fuel

Diesel oil

Burner

Italy Heater

Feed Mode

Guidebook

Temperature Level Screen

Digital Present

Gas intake (Oil)

Normal 16.6 Kgs/Hour

Inner Dimensions

100x80x70cm (Key Chamber)

External Capacities

230 x 130 x 155cm (main body)

Waste combustion chamber

560Liters

Blog Post Combustion Chamber

280Liters

Oil Container Capacity

200 Litres

Door Opening

70 x 50cm

Smokeshaft

5.0 M

Gross Weight

4500kgs

Chamber Item

Firebrick, Refractory Concrete

Max. Warmth Worth

166,000 Kcal/Hr.

























HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-02-15



Animal body parts,other biomedical waste,organs dung

51.No    Features    $_pecific tions
1    (Incinerator)
Type of waste for disposal    Animal  body  parts,other  biomedical  waste,organs dung, bedding materials,plant p缸ts and food itemsι
Incinerators for conversion of waste to fine,white sterile
ash with no visible smoke or odour
2.    Load capacity    300 – 4∞Kg (maximum)
3.    Bum capacity    100 Kgjhr (minimum)
4    Fuel    Diesel (LDOjHSD)
5.    Type of Bumer operation    Automatic diesel fired
6.    Primary chamber    Solid hearth
Dense refractory concrete lining
Operating temeeralure of 850 土 50 deg C or more
7.    Secondary chamber    Slid heath
Dense refractory concrete lining
Opera恤19 temperature of 1∞o deg C or more
8.    Temperature control    Digital temperature control and display
Temperature monitoring and thermostatic control
9.    Power supply    220V for control Box
10    Size    Compact design preferred
11.    Opening lid    Large top open归g lid (Approx . 700 mm x 500mm) for
easy loading
12.    Fuel tank    100-150 L

13.    Civil    works,    installation    and
comnuss!Onmg    lndusive  of  civil  works  (brick  wall  incinerator  house
with a shutter door,CGI sheet roofing) according to 由e
model of the incinerator.
lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation .
Electric power supply line to light incinerator house as well as to control box of the incinerator
Onsite  demonstrationjperformance  test  and  adequate training of staff on the use of incinerators.
Warranty of one year from the date of commissioning. Separate   Annual    Maintenance    Contract   would    be drawn with the supplier at a later stage.
14.    Catalogue    Catalogue containing detail pictures and spec迁ications
of  the  quoted  incinerator  must  be  included  in  the
bidding document

medical waste incinerators china


  1. Ensure flame contact with all gases is achieved. –yes
  2. Ensure residence time is not less than two (2) seconds. –yes
  3. Ensure the gas temperature as measured against the inside wall in the secondary chamber & not in the flame

zone, is not less than 1100oC.—1000-1200 oC

 

  1. Ensure the oxygen content of the emitted gases is not less than 11%.–yes
  2. Ensure both primary and the combustion temperatures are maintained until all waste has been completely

combusted–yes

 

5     Particulate Removers A mechanical particulate collector must be incorporated after secondary combustion

chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include

any of the following or a combination thereof:

 

Cyclone separator

Electrostatic precipitators

Fabric filters— filter brick

6     Chimney / Stack  1.    The chimney should have a minimum height of 10 meters above ground level and clear the

highest point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings

within 50 meters radius should be taken into account.—6 meter already, can plus 4 meters, free cost

 

  1. If possible the chimney should be visible to the operator from the feeding area.—according to local site
  2. The addition of dilution air after combustion in order to achieve the requirement of these guidelines is

unacceptable.

 

  1. The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity =

wind speed x 2) whichever is higher to ensure no down washing of exiting gases. .–yes

 

 

  1. Point for the measurement of emissions shall be provided. .–yes

 

 

7     Instrumentation   Instrument for determining the inside wall temperature and not burner flame temperature must be

provided for both primary and secondary chambers.–yes

 

  1. An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to

below the required temperature.

Capacity       Not less than 500Kg/hr.

Operation     24hr-7days/week continuous operation.

Combustion chamber 2 combustion chamber.

Temp.    First combustion chamber 800-1000 C.

Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400


Little Capacity Incineratorsmall 20 Kg/Hour Medical Waste Inc


Basic Info.

Model NO.:Slaughterhouse Waste Incinerator
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can use in this gear?  A: This gear to medical waste, pet animal, Municipal waste, reside squander. Prohibit any volatile and radiation substance, liquid waste and gas waste. 

Q: Incinerator Smoke Standard  A: China Government Standard: No. GB18484-2001.  The animal/pet combustion rate around 2/3 of average power. 

Clover incinerator use time daily to 24 hours. Between every feed/combustion time, you will find approximately 0.5-1 hours cooling time plus time to get feeding squander. Actual combustion time daily is about 16 hours. The lifetime of incinerator involving 5-10 year based on use. 

Generally, we proposition little lab, little clinic use capacity under 20 kgs per hour. If incinerator use in hospital, then please compute the waste output around 2kgs per individuals per day. If there are 200 sickbed at the hospital, that's mean you need one incinerator capacity around 400kgs per day, switch to power per hour is approximately 30-40 kgs per hour. According the performance time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator.  *The best way to compute Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Meeting and Testing  A: We supply all files and incinerators simple to installation and functionality. Client can send individuals visit our factory to find out installation and operation. Generally, we don’t send engineer to neighborhood site or even request. The dispatch cost is extra based on order.  The next combustion chamber: 1000-1200 centi level. 

Q: Incinerator Control Mode  A: Default Control mode is common control case. PLC mode based on model and order. 

Q: Operation and maintenance costs  A: Operation cost based on fuel consumption rate and power/staff, etc. 

Annual approximately $500-$1000USD per year maintenance according version, use situation. 

One person can service 02 unit incinerators. Incinerators italy for health care waste, incinerators health care waste, incinirator, industrial incinerators china, insenorator, klarge garden incinerator, laboratory animal incinerator auction, The team should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower based on operation user guider, and know threat of medical waste to protect employee self with essential protection component. 

One person can service 02 unit incinerators. Incinerators italy for medical waste, incinerators medical waste, incinirator, industrial incinerators china, insenorator, klarge garden incinerator, lab animal incinerator auction, The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Clover's Social Media