Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
arrangement of waste non multiple-use burner system
installment of waste non reusable system in airport.Incinerator with oil heater
Capability 2 ton/day, Oil storage tank 300 l Oil pump 0.4 Kw, Heating unit 0.2 Kw.
Variation: YD Collection.
– Diesel heater. It will definitely have usually paper, cardboard and likewise food, though also it will absolutely blaze medical waste. The heater will have the ability to deal with natural and also polluted products.
Smokeshaft External Size: not above 400mm.
Fan Power: require to not go beyond 1.1 kw.
Voltage: 220V.
Oil Consumption: Required to not surpass 14kg/hr.
Feeding Door Dimension: not less than 1000x1300mm.
Incineration Temparature: 800 Level or above.
Discharge:.
CO- Have to not exceed 100mg/m3.
SO2- Should not exceed 400mg/m3.
HF( Hydrogen Flouride)- Must not surpass 9mg/m3.
NO2- Must Not exceed 500mg/m3.
Given that it will certainly deal with organic and damaging waste, temperature level has to reach a minimum of 1100 degrees for a minimum of 2 Second. The flue gas cleansing equipment maust go to the very the very least two-field electrostatic precipitator/ESP, dust
– Diesel burner. It will absolutely have typically paper, cardboard and additionally food, though similarly it will definitely incinerate clinical waste. The heater will certainly have the capability to deal with natural and also polluted products. Since it will treat unsafe and natural waste, temperature level has to reach a minimum of 1100 levels for a minimum of 2 2nd.
–– 25Kg/h. It will certainly have generally paper, cardboard and also food, though likewise it will certainly incinerate medical waste. So the burner will have the ability to deal with organic and contaminated materials.
–– Spare components for one year.Burning Capacity: 400kg/ Human Resources (Optimum Combustion time is 6 times/ Day).
Smokeshaft External Size: not greater than 400mm.
Fan Power: need to not surpass 1.1 kw.
Voltage: 220V.
Oil Intake: Need to not surpass 14kg/hr.
Feeding Door Size: not less than 1000x1300mm.
Incineration Temparature: 800 Degree or above.
Emission:.
CO- Have to not surpass 100mg/m3.
SO2- Must not surpass 400mg/m3.
HF( Hydrogen Flouride)- Should not go beyond 9mg/m3.
NO2- Must Not exceed 500mg/m3.
Smoke Dirt: Have to Not surpass 100mg/m3
–– The design need to prevent any type of launch of contaminating substances right into dirt, surface area water and groundwater.
–– Burning area needs to get to a minimum of 860 degrees under the most damaging conditions with at least 6% oxygen. Since it will treat harmful and organic waste, temperature level has to reach a minimum of 1100 degrees for a minimum of 2 2nd.
–– Flue gases must be cooled down to 200 levels or reduced prior to flue gas therapy. The flue gas cleaning equipment maust go to the very least two-field electrostatic precipitator/ESP, dust << 30mgNm3.
–– Thermal efficiency not less than 85%.
–– It must be geared up with filter to minimize as well as include toxins from natural and clinical waste.
–– Easy to operate for virtually inexperienced employees.
Small Scale Incinerator 10kgs Feb Hour
Basic Info.
Additional Info.
Product Description
Essential Features: * All versions with Dual combustion room. * Stainless Steel chimney/stack, long lifetime. *based on sequence * High fever, long lifetime of incinerator. * Free or minimal installation onsite. * High burn rate, from 10kgs to 500kgs per hourto 6ton per day. * PLC Control Plane. *based on order * New Design for pet animal cremation business. * One year warranty on incinerator and parts in stock.
Items | Specification | |||
YDC Model | YD-10C / YD-20C / YD-30C / YD-50C | |||
Main Product List | Primary Combustion Chamber | |||
Secondary Combustion Chamber | ||||
Mix Combustion Chamber | ||||
Smoke Filter Chamber | ||||
Incinerator Common Control Case | ||||
Stainless Steel Chimney | ||||
Italy oil/gas burner: 02 units | ||||
Oil Tank (if oil fuel) |
TECHNICAL SPECIFICATION FOR MEDICAL WASTE INCINERATOR (50 – 60kg/hr)
COMPLIANCE (YES, NO or COMMENT) | ||||
Item
Description |
Medical Waste Incinerator, 50 to 60
Kg/hr |
|||
Item Quantity | 5 No. | |||
Support | Health Sector Support Project | |||
Point of Installation (Hospitals) | Moi Voi, Makindu, Maragua, Eldama Ravine and Isiolo District Hospitals | |||
1. General Description
Supply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment. The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006). The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual. The unit shall be capable of incinerating between 50 to 60 kg of solid medical waste per hour. It shall be constructed from mild or aluminized steel lined with refractory material. |
||||
2. Composition
2.1 Main unit 2.2 Accessories |
||||
3. Performance specifications | ||||
3.1 | Main unit | |||
3.1.1 | Application | For incineration, general and pathological | ||
3.1.2 | Capacity | 50 – 60 kg/h burn rate | ||
3.1.3
|
Type | Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit | ||
3.1.4 | Operating time | Minimum 8 hours daily | ||
3.1.5 | Operating temperature | From 850 0C to 1200 0C, Automatic controlled | ||
3.1.6 | Residual Ash | 5 to 10% | ||
3.2 Primary Chamber | ||||
3.2.1
|
Construction | Constructed from heavy duty mild or aluminized steel Or
equal and approved equivalent |
||
3.2.2
|
Insulation material | Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork |
||
3.2.3
|
Internal Construction | Fixed hearth type complete with gratings, concave bottom
and charging door, lined with refractory material |
||
3.2.4
|
Charging Door | Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges. |
||
3.2.5 | Door Lock | Automatic, Electric type | ||
3.2.6
|
Ash removal door | Provided, for removing resultant bottom ash leftovers from the Primary chamber | ||
3.2.7 | Gratings | Provided | ||
3.2.8 | Loading | Manual loading of waste | ||
3.2.9
|
Primary Burner | Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure, Diesel fired fuel injector type and Flange mounted | ||
3.2.10
|
Blower | Provided. For supplying excess combustion air through the distribution system with speed control system | ||
3.2.11 | Temperature | Minimum exit 850 0C | ||
3.2.12 | Observation port | To be provided with protective glass type | ||
3.3 Secondary chamber | ||||
3.3.1
|
Construction | Constructed from heavy duty mild or aluminized steel or equal and approved equivalent | ||
3.3.2
|
Insulation | Refractory material lining | ||
3.3.3
|
Combustion Temperatures | Above 850 0C, controlled electronically | ||
3.3.4
|
Gas residue or retention Time | > 2 second at minimum 850 0C | ||
3.3.5
|
Secondary Burner | Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system, Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type. Flange mounted | ||
3.3.6 | Ejector | Provided, Venturi type, for cooling the flue gases | ||
3.3.7
|
Combustion Air Fan | Provided for supplying combustion and creating a negative drift and turbulences | ||
3.3.8 | Temperature | Maximum 1600 0C | ||
3.4 Chimney | ||||
3.4.1
|
Construction | Constructed from heavy duty mild or aluminized steel or equal and approved equivalent Refractory material lining | ||
3.4.2 | Length | 10 m above ground | ||
3.4.3 | Bore | about 350mm diameter | ||
3.4.5 | Discharge temperatures | About 850 0C | ||
3.4.6 | Emissions | To comply with standards in section 9 of third schedule of the waste management regulations, 2006. | ||
3.5 Electrical System | ||||
3.3.5
|
Control unit | Fully automatic with microprocessor based control unit (PLC) automating all operations of the incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress
Parameters i.e. temperature of primary and secondary chambers, turbulence and time With status lamp With user of defined and differed programmed operating cycles for different type of loads/conditions With safety interlocks, display of errors and visible and audio alarms. System for continuous emission monitoring |
||
3.5.2
|
Isolator switch | Supply and install isolator switch 240V, 100A for the incinerator unit, including all necessary cables 10m | ||
3.5.3
|
Distribution Board | Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment. Wiring to be done according IEE regulations. | ||
3.5.4
|
Wiring | Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room. Working length 20m. Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations | ||
3.6 | Fuel System | Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor) | ||
3.6.1
|
Fuel Tank | Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material | ||
Fuel type | Diesel | |||
3.6.2
|
Fuel Lines | Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.
Working length , 20m Fuel pipe material; Special copper pipes or similar and approved materials |
||
4 Physical characteristics | ||||
4.1 | Main unit | Floor mounted, stand alone, fixed hearth type | ||
Dimensions | About 1.2 x 2.2m (WxD) | |||
5 Operating environment | ||||
5.1 | Power Requirements | 240V,A/C 50Hz, single phase, with PE | ||
Ambient temperature | 10 0C to 40 0C | |||
Relatively humidity | 40% to 90% | |||
6. Accessories | ||||
Rack, 2 m long | 1 piece | |||
6.1 | Waste cart, stainless steel | 1 piece | ||
7 | Spare parts | |||
7.1 | Burner | 1 set | ||
7.2 | Fuel Filters | 6 sets | ||
7.3
|
All other spare parts required for replacement during and after 12 months of operations. | 2 pieces of each | ||
8 Quality Standards | ||||
8.2
|
Manufacturing standards | NEMA Kenya Act, 1999
Legal Notice No.121 of 29th September 1999 on waste Management Regulations EU waste incinerator Directive- EC 76/2000 BS 3316 WHO Emission Standards World Bank Emission Standards or any other internationally recognized standards |
||
Conformity to standards | CE marked or any other internationally recognized documents | |||
9 Local back up service | ||||
9.1 | Available | Should be available locally | ||
9.2 | Capacity to service equipment | Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance service and spare parts sales for the lifespan of the incinerator | ||
10 Delivery point | ||||
10.1 | KEMSA | For inspection and verification | ||
10.2
|
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals |
For installation, testing, NEMA Certification and commissioning | ||
11 | Pre installation works
|
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards | ||
12 | Installation and testing | Complete installation and set up of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days |
||
13 | Training | |||
13.1
|
User training | On site user training on operation and daily up keep | ||
13.2
|
Maintenance training | On-site maintenance training on Preventive Maintenance, repair and trouble shooting | ||
14 | Technical Documentations | |||
14.1 | User manuals | 2 sets | ||
14.2 | Service manuals | 2 sets | ||
14.3 | Drawings | 2 sets | ||
15 Commissioning | ||||
15.1 | Testing and Commissioning of the machine to the satisfaction of the user | |||
16 | Warranty | |||
16.1 | Equipment | Minimum of one year after commissioning on all parts. | ||
16.2 | Equipment system | Nil | ||
17. Maintenance contract | ||||
17.2 | Comprehensive preventive & repair service | Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning |
Made-in-Vietnam waste incinerator shows its power
He started working on this kind of incinerator some years ago, supported by the notion that his incinerator may help decrease the negative impact caused by countless tons of medical waste.
In 2009, after successfully producing an incinerator, he filed a patent registration because of his’hazardous waste incinerator’ into the Ministry of Science and Technology and obtained the patent in 2012.
Nang’s incinerator is a method that comprises a comprehensive combustion chamber which could burn off waste in an uninterrupted process. The incinerator utilizes nano technologies that disintegrates hazardous smoke, dust and frog.
The product is thought to have outstanding features which let it operate more efficiently than products of the exact same kind.
Nang said that his waste incineration process is movable. The machine may work nicely if users have a small water tank and may treat the water.
He also said that all the incinerators available in Vietnam don’t have the pressure equilibrium like his. The incinerator can burn waste, eject fire rather than oil into burning substances. At the center of the combustion chamber, the temperature may reach 1,800oC.
With Nang’s incinerator, it does not take much time to burn waste. The oil is lasting, and there is not any technical problem with oil tubes.
When the incinerator runs with gas, then it is going to need VND5,000 only to burn 1 kilo or waste. Meanwhile, the incinerators out of US, Japan and UK would have VND70,000-80,000 worth of gasoline to burn a kilo of waste.
The outstanding characteristic of the made-in-Vietnam incinerator is that it may treat many types of waste, including national garbage and medical waste.
Manager of the Bac Kan Science and Technology Department Do Tuan Khiem said the incinerator is the Right choice for localities with moderate waste capacity. The machine is highly efficient and fuel-saving, which can be big advantage in Vietnam’s conditions.
From: http://english.vietnamnet.vn/fms/science-it/145663/made-in-vietnam-waste-incinerator-shows-its-power.html
If the incinerator runs with diesel, it will need VND5,000 only to burn one kilo or waste. Meanwhile, the incinerators from US, Japan and UK would consume VND70,000-80,000 worth of fuel to burn a kilo of waste.
The outstanding feature of the made-in-Vietnam incinerator is that it can treat many kinds of waste, including domestic garbage and medical waste.
Director of the Bac Kan Science and Technology Department Do Tuan Khiem said the incinerator is a suitable choice for localities with moderate waste capacity. The machine is highly efficient and fuel-saving, which is big advantage in Vietnam’s conditions.
From: http://english.vietnamnet.vn/fms/science-it/145663/made-in-vietnam-waste-incinerator-shows-its-power.html
Animal Carcass Incinerators
Basic Info.
Additional Info.
Product Description
2011 year is an important foundation for us. We reach to developed country market and stabilize old clients. Clover Incinerator has grown to be one of the famous and biggest incinerator provider throughout the world.
Key Features: * All versions with Dual combustion chamber. * Stainless Steel chimney/stack, long life. *according to sequence * High temperature, long life of incinerator. * Free or minimum installation onsite. * High speed, from 10kgs to 500kgs per hourto 6ton daily. * PLC Control Plane. *according to order New Design for pet animal cremation enterprise. * One year warranty on incinerator and components in stock.
Item | Customer Request | Example |
Application Scope | |
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc |
What kind of waste? | ____, _____% ____, _____% ____, _____% |
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent if for animal/pet, indicate animal size like: cat, dog, cattle, etc |
Quantity Request | 01.02.03^…unit |
|
Budget | $US Dollar. |
|
Operating Time | The staff work Hours per day. Our incinerator can work up to around 18 hours per day. |
|
Realization Date of project | In ___ year | |
Waste Output Capacity per Day? | |
1000kgs Per Day^ |
Request waste burn rate | Capacity: 100kgs Per hour^ | |
Request waste feed capacity | Capacity: 100kgs per feed^ | |
Whether Natural Gas Supply Local? | Yes or No. | |
Local Power | If 380V and 220V valid? | |
Product Installation Destination | |
Country or City name |
DestinationSeaport name? | To check sea freight charge. |
|
Customer | End-Customer, Agent, Government. |
|
Method of contract | Tender or Negotiation | |
Date of Tender limit | ||
How did you know our company? | ||
Other request or information | |