Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

HICLOVER Made Waste Incinerators



HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project.

We supply single burning chamber, double burning chambers, 3 combustion chambers and also multi-combustion chambers waste incinerators for lab, clinic, healthcare facility, clinical center, hygiene scientific waste damage with clinical disposable, biological waste, medical plastic waste, hazardous waste, red bag waste, needle disposal, gauze and bandages, sealed sharp containers, pathological waste, trace-chemotherapeutic wastes, and so on.

Our variety of burners cater for tiny to huge range pet cremation associated companies, such as fowl ranches, livestock farms, sheep ranches, pig farms, stables, kennels, screening lab, catteries, pet crematoriums.

The incinerator burn waste in primary combustion chamber and burn the smoke from primary combustion chamber again to make sure environmentally friendly with no black smoke, smelless, reduce pathogenic bacteria infection.



W.Va. authorities get five mobile drug incinerators

drug incinerators
Authorities unveiled a new mobile incinerator that will be used to destroy unwanted or expired prescription pills in the future.

State Police Lt. Michael Baylous, Putnam Sheriff Steve Deweese and U.S. Attorney Booth Goodwin hoisted large orange buckets filled to the brim with a mixed assortment of pills and dumped them, one by one, into the smoking maw of the black incinerator Tuesday afternoon at the Putnam County Courthouse in Winfield.

The pills were from the 2.5 tons collected Saturday as part of the National Prescription Drug Take Back Day.

Saturday’s event was the last event sponsored by the Drug Enforcement Administration, Goodwin said. The federal agency has conducted take-back days since 2010 because there weren’t any rules on properly disposing of unwanted or expired medications.

The DEA began working toward safe disposal rules after the first take-back day. The final rule was issued this year, allowing DEA-registered hospitals, pharmacies, long-term care facilities and others dealing in pharmaceuticals to modify their registrations to become authorized collection sites, according to the DEA’s website. Law enforcement agencies also may continue collecting pills.

Goodwin said when the events began there were no standalone drop boxes for medications. Now, both Kanawha and Putnam sheriff’s offices operate collection sites in Charleston and Winfield.

“We’ll continue on,” Deweese said. “We’ll support ourselves on it.”

The Putnam Sheriff’s Office collected some 221 pounds of medications in the last event.

Goodwin said the five mobile incinerator units were purchased with funds from the 2004 settlement with Purdue Pharma, the maker of OxyContin…

Burner YD-500 for Vietnam



We finish this project in year 2010 to 2011 and also distribution to Hochiminh port, Vietnam with 1×× 40′ feet open leading full container.

Items/Model YD-500
Burning Rate (kgs/Hour) 500 kgs/Hr.
Feed Capacity (kgs) 800 kgs
Equipment Weight 13000 kgs
Primary Chamber (Liters) 4000
Secondary Chamber (Liters) 1500
External Dimensions (cm) 320x220x460
Internal Dimensions (cm) 257x147x108
Oil Tank(Liters) 500
Door Opening (cm) 108 x 128
Chimney (M) 14
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.



Waste Administration Preparation


If burning and also incineration is utilized, the gadgets selected necessity to be made in addition to sized to match the waste produced, reduce fire danger in addition to likewise result in the total burning of their waste.

Reuse waste where various functions could be determined.

In spite of having much better waste reduction measures in place there’ll surely be waste developed. Waste by its character is typically a mix of varied unwanted products. The trailer and recreation of numerous type of waste is an effective means to lower the amount of waste requiring expensive handling, storage space, treatment in addition to also disposal. Dividing also makes it feasible for the reuse of specific kinds of waste for a different function. Reuse activities might be undertaken either off-site or on-site.

Treatment and disposal is the last action in efficient waste management and likewise must be handled only besides several other practical reduction in addition to also reuse choices have been checked out. A large selection of treatment and disposal choices exist in addition to also each have to be checked out before deciding upon a last approach, no matter whether waste is to be taken care of as well as cared for on-site or off-site. If trimming and incineration is the approach of choice, devices has to be produced along with sized accordingly to match the kind in addition to quantity of waste being produced. As defined in the adhering to area, open burning can securely messing up a minimum number of kinds of waste. While burners are capable of safely damaging a broader series of waste, countless type of waste should nevertheless be diverted. On-site partition stays an important element of any type of waste tracking plan due to the fact the this.

Typically, the adhering to concepts have to be used to direct liable good waste monitoring prep:

Know your waste by doing a waste audit.|


BURNER DIESEL FIRED



Heater 20 Kg
Burner electrically ran
containing:
A cage for receipt of biomedical waste;
A burning chamber with fireplace with a filter to preserve ashes;
A cover;
An air supply;
A wind generator allowing supply air.
Burning temperature: 1800 ° C.
Consists of all gadgets. ▪ The burner ought to be a modern-day garbage disposal system, made
to bum medical waste in a neat in addition to eco effective
fashion. It needs to use a temperature based reasoning control system
To supply ideal control of the operating problems and
incorporate a high ability thermal oxidizing extra chamber.
It needs to be made to keep the exhaust gases, for a minimum of 2
secs to make sure the device’s dependable damage of the combustion
items.
▪ All the burners to be supplied as well as established fulfill the
Waste Keeping Track Of Standard 2006, authorized notice No. 121 of
29th September 2006 as well as specifically third schedule legislation
( 26, 47) connecting classification, standards, standards, in addition to
procedure for establishing as well as running incinerators.
▪ The capability of the burner called for must be to the
specifications with a capacity to thaw 100kgs/Hr.
▪ The burner will be operated a three-phase power supply
( keys).
▪ For the technological exam, not just the treatment plant
the whole system will certainly be taken into consideration. It will be the responsibility
of the Bidder to give a complete system, consisting of all eventually
moreover essential extra systems and also additional
devices.
▪ The system supplied will be established to run normally under
the conditions of the buyer’s nation. The conditions include
Power Supply, Environment, Temperature Degree, Wetness, and so on
▪ The Potential customer needs to supply a warranty for one year.
▪ All message, spec etc. on all control running user interfaces as
well as on info displays in addition to on print-outs will certainly remain in
English language.
▪ The Potential buyer supervises of all consents as well as also approvals for
importation. The Prospective purchaser will offer all the vital
paperwork in order to aid with the authorized demands for the
installation as well as likewise putting into usage the tools.

▪ Duration of Implementation is 90 days from agreement trademark for
delivery to website along with completion of all confirmation procedures
needed for the issuance of provisionary approval.
▪ Representatives of the Obtaining Authority and also the
Recipient, together with the Prospective customer’s representative, will
carry out the controls, testing and likewise initial authorization for provisional
as well as also last authorization. The provisionary and last approval shall
occur at the last location.
▪ Customer care: The Prospective buyer is called for to guarantee that a.
upkeep, solution and also dealing with centre, which is recognized by.
the Manufacturer, as well as which has the ability to swiftly offer genuine.
additional components and also consumables recommended by the Distributor.
is supplied throughout the one year solution warranty duration. In.
fulfillment of this demand with their offer, possible purchasers must.
send a declaration authorized by the producer or agent.
of the manufacturer:.
ͦ Providing the name along with address of its qualified.
upkeep, solution in addition to repair centre,.
ͦ Verifying that this recognized maintenance, service and additionally.
repair work centre has the ability to swiftly provide authentic extra components along with.
the consumables suggested by the Manufacturer; and.
▪ The Prospective buyer will be liable to offer as well as additionally install all.
devices supplied to the healthcare facilities in the.
Republic of Kenya. The Bidder will supply a time routine over.
the total structure as well as creating duration. The delivery.
and additionally setup time have to be agreed between prospective buyers, target.
Clinical center and additionally the Getting Authority. The treatment plant must.
show up pre-assembled. The Possible customer shall ensure that all parts of.
the plant moved by sea shall not be supplied as “deck.
cargo”.
▪ It is prepared for that the Potential purchaser cooperates really carefully with the.
service provider for the new waste managing framework/ property and also will.
make available all required technical information, attracting, and so forth to.
the professional.
▪ The Prospective buyer will provide as well as also mount the incinerator with the.
adhering to connected specifications

For the Supply, configuration & & & & appointing of a Professional Waste Burner as comprehensive listed here:.
i. Waste kind Healthcare waste.
ii. Waste thickness 125 to 350Kg/M3.
iii. Waste Calorific Value 4000 KCAL/Kg.
iv. Dampness internet material 10-25%.
v. Approximated ash residue 5-10%.
vi. Little capability 100Kg/hour established loads.
vii. 2nd chamber 2 seconds @ 1100 ° C. viii. Environmental Administration Coordination Act, 1999 and also specifically, Waste checking standards, 2006.
2 Devices.
2.1 Secret Combustion Chamber.
▪ The crucial combustion chamber is the significant framework of the.
heater, made from light steel plate and also tensed with.
rolled steel areas. It is brought from the flooring level on a.
considerable steel help framework. Internally the covering is lined with.
calcium silicate insulation and likewise a warm face combination of very.
obligation brickwork or high durability castable.
▪ The primary burning chamber require to guarantee minimum separation.
temperature degree is not less than 850 ° C
. One Guidebook Lots Burner making up:.
▪ Handbook Loading door (sturdy steel door with suitable.
refractory lining).
▪ Horizontal strong hearth, refractory lined vital burning.
chamber. Approximate dimensions 800 mm sizes x 2100mm.
long.
▪ Complete sized mass load/ash elimination door.
▪ 1 off diesel-fired ignition heater– – temperature managed.
▪ 1 off melting air supply follower and likewise blood circulation system, automated.
control.
▪ High capacity second combustion chamber with house time.
not much less than 2 secs @ >> 1100 ° C. ▪ 1 off diesel-fired afterburner– – temperature level managed.
▪ Control panel– – automated operation.
▪ Temperature level indication primary as well as additionally additional chambers 0-.
1200 ° C. Both chambers need to be shielded with refractory.
material (extremely commitment 100mm thick firebrick with 25mm thick.
calcium silicate insulation).
Remember: The second burning chamber have to make sure that the gas temperature as established versus the within wall surface in the second chamber & & & & not in the fire location, is not much less than 1100 ° C. 2.2 Throughput.
100kg/hour at a little calorific worth of 4,000 kcal/kg and also a common bulk density of I20kg/ M3 for fundamental waste along with l60kg/ M3 for healthcare waste.
2.3 Ash.
The waste will be reduced by 90 ~ 95% to leave 10 -5% ash.
2.4 Quality/Environmental Needs.
▪ Setup Monitoring and also Sychronisation Act, 1999.
▪ BS3316.
2.5 Running Duration.
▪ Anticipated day-to-day operating duration 8 hrs.
▪ Maximum running period 12 humans resources.
2.6 Chamber.
▪ Should be refractory lined to the adhering to requirement; Hearth in addition to.
reduced area of chamber walls.
2.7 Warm face product.
▪ Super responsibility firebrick.
▪ Limiting constant option constraint 1500 ° C. ▪ Thickness 100mm.
▪ Thermal conductivity 1.3 W/mk.
2.8 Insulation.
▪ Calcium silicate.
▪ Limiting constant service constraint 1000 ° C.
▪ Thickness 25mm.
▪ Thermal conductivity 0.095 W/mk.
2.9 Smokeshaft/ Lot.
▪ Need to be manufactured from refractory lined light steel or high.
top-notch air-cooled stainless steel. The chimney/stack needs to have a.
minimum elevation of 10 meters over ground degree.
▪ Refractory lined flanged smokeshaft should more than the elevation of.
any type of kind of existing roofing adjacent to the incinerator.
▪ Give training equipment to lift, put up as well as likewise position smokeshaft, along with.
offer sustains slings as essential. Enable cutting of tree.
branches to assist in the workout.
▪ The smokeshaft will be painted with accepted warmth immune.
paint after arrangement.
2.10 Ignition Burners.
Totally packaged oil kind, total amount with electric ignition as well as additionally flame failure controls, wired with continuous running fan as well as likewise complete with all shutoffs, fan as well as additionally electrical motor.
· Optimum rating: a minimum of 450kW/hour.
· Heater: set up on/off procedure.
· Optimum usage: a minimum of 6 litres/hour.
· Ordinary consumption: at least 3 litres/hour.
2.11 Afterburner.
Fully packaged oil kind, total with electrical ignition along with flame failure regulates wired with consistent running fan and also total with all shutoffs, fan as well as also electrical motor.
Maximum ranking: at the very least 450kW/hour.
Burner: set up on/off operation.
Maximum use: at the very least 9 litres/hour.
Average intake: at the minimum 4.5 litres/hour.
2.12 Flue gas therapy.
▪ Demands to have particulate cleanser (scrubbers). A mechanical.
fragment collection agency ought to be incorporated after 2nd.
shedding chamber for removal of bit pollutants.
entrained in the flue gas stream.
2.13 Diesel Storage tank.
▪ To supply diesel services storage tank (Capability 400 litres).
including degree indication.
▪ The container need to be connected to the burner at greater level.
to make it possible for free-flow of diesel from the tank to the incinerator.
The connecting pipe needs to be a black pipeline of approved scale.
as well as size. Consist of various other going along with gadgets and.
fittings.
▪ Attach heaters to fuel supply.
2.14 Electrical Supply.
▪ 3 stage 415 V a.c., 50/60 Hz.
3 Papers:.
Procedure handbook 2 collections.
Service/maintenance guidebook 2 collections.
4 Certification.
▪ National Atmosphere Keeping An Eye On Authority (NEMA).
certification.
5 Capability to service devices.
▪ The agent/supplier will have adequate facilities, spare elements,.
consumables and also certified as well as also experienced technical personnel.
Configuration jobs.
▪ Provide elevating gears as forklift, gantry, rollers, and also training.
jacks and additionally establishing heater.
6 Selecting along with Training.
▪ The Rep will examine prepared operating specifications

▪ The representative shall carry out a 2 days operation & & & & maintenance. training to the Biomedical engineering staff members along with heater.
operators after configuration & & & & appointing of the devices.
7 Commissioning Maintenance Agreement.
▪ Prior to the expiration of the service guarantee/ signing off, the distributor shall.
supply a 1 year alternative option parts (e.g. oil filters, air.
filters), the Quarterly normal upkeep price per quarter.
for 3 (3) quarters.

Maintenance control recommendation.
▪ The maintenance agreement cost consists of work, transport and also.
lodging for the participating in service technicians.



Clover's Social Media