Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
Containerized Burner Design CA30 from HICLOVER
Containerized Incinerator is one type of mobile incinerator. we build the incinerator and mounted the incinerator into shipping container(20′ container or 40′ container), with necessary Basic work, such as flooring, lighting, wiring, etc.
Items/Model
CA30
Image
![]()
Shed Rate
Common 10 kg/hour
Feed Capability
Average 30kg per feeding
Control Establishing
PLC( Programmable Reasoning Controller Burner)
Combustion Chamber
330L
Internal Measurements
75x75x60cm
Additional Chamber
180L
Smoke Filter Chamber
Yes
Feed Establishing
Manual Feeding
Voltage
220V
Power
0.5 Kw
Oil Intake (kg/hour)
Ordinary 13.3
Gas Use (N.G, m3n/Hour)
Typical 16
Gas Usage (L.P.G, m3n/Hour)
Average 11.7
Temperature Level Monitor
Four Digital Program
Temperature Level Defense
Yes
Oil Container
100L or Even Much More( Optional)
Feed Door
55x50cm
Smokeshaft
5Meter or Also A Lot More( Optional)
Smokeshaft Kind
Stainless-steel
1st.
Gross Weight
4000kg( without container)
Exterior Dimensions
175x120x140cm
Gross Weight
4000kg( without container)
External Measurements
175x120x140cm
Tel: +86-25-8461 0201
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]
Catalogue of Incenarator for Pharmaceuticals Waste
Basic Info.
Product Description
Key Attributes: * All models with Dual combustion room. * Stainless Steel chimney/stack, long life. *based on order * High fever, long life of incinerator. * Free or minimal installation onsite. * High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. *based on order New Design for pet animal cremation business. * One year guarantee on incinerator and parts in stock. Program Scope: 1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine. 2. Slaughter House &crematorium monster gear petrol, crematorium china, crematorium gear for medical waste, crematorium gear fuel expenses, 3. Crematorium equipment prices, Pet Hospital &Farm: Dead Animal, Bio-Waste.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
laboratory incinerator china manufacturer
Incinerator dual chamber with capacity 1.5 m3/batch or 6 m3/ day, digital thermocontrol range 0‐1200
C, thermocouple, air supply capacity 10m3/ minute, power consumption 1.2kWH/ hour, power 3
phase with netral, cooling water sprinkler capacity 5L/ minute, completed with refractory (insulation,
castable, ceramic blanket) and PLC
SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL SPECIFICATIONS
The Waste Incinerator is designed to burn Type IV of pathological waste and infectious, contaminated “red bag,” surgical
dressings, plastic test devices and other wastes.
General Specifications
Burner: 2 burners (primary burner and second burner)
Fuel: Oil
Capacity (Cubic Mtr): 0.65
Ave Capacity: 60 kg per hour
Fuel Consumption (ltrs / hr):13
External Dimensions
Length (mm): 2300
Width (mm): 1220
Height Incl. Flue (mm) 7000
Door Opening (mm) 610 x 710 610 x 710
Operation
Min. Operating Temperature: 950
Max. Operating Temperature: 1320
Residency Time in Second Chamber: 5 sec
Temperature Monitoring: YES
Other clarification
Easy and safe operation
Large counter-balanced fill door with electrical lockout.
Automatic control system provides preset burn times and shut off.
Reload light indicates to operator when it is time to recharge.
Be required for burnout of final charge.
Low energy consumption levels
Programmable digital temperature controls maintain temperature, assuring complete combustion while conserving fuel.
Pressure blower with modulating air control creates turbulence and distributes combustion air to secondary chamber.
Secondary burner with temperature activated modulating control provides fast preheat and sustains high temperature
performance at low energy consumption levels.
Charging rate
hazardous waste incinerators in china
Anchor all equipment to building floor or structure as shown or as recommended by manufacturer with allowance
for thermal expansion as necessary.
- Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so
that all control switches and indicators are within 1700 mm (5.5 feet) of the floor and are located alongside the area
where personnel will be loading the unit.
- Clean interior and exterior of all equipment before placing in service.
- Initially operate incinerator at firing rates and time periods recommended by the manufacturer of the
refractory to provide proper curing of the refractory. Provide printed curing instructions from refractory manufacturer
at the site prior to first start up.
- Personnel Protection for High Surface Temperature: If incinerator has surface temperatures exceeding 40 degrees
C (70 degrees F) above ambient, provide removable chain barricades mounted on 1070 mm (3 1/2 feet) high removable steel
posts spaced 1200 mm (four feet) on centers. Locate barricade at least 900 mm (three feet) away from hot surfaces.
Provide yellow polyethylene chain with removable hooks at each post. Provide sign attached to each chain reading,
“Caution, High Temperature”.
- Do you have model YD-500 as a mobile unit? In case of a major crisis in one of the clusters we would like to have
the option to move the unit closer to the location to avoid transporting the dead cows. Do you have any mobile
solution?
- Please elaborate what additional equipment we will need to buy to operate each unit? I need to know the total cost
per unit.
- Does the unit need to be under a roof?
- How is the loading of the dead cow into the incinerator done?
- How is the incinerator emptied?
- Are there any limitations on how we should dispose the remains from the incinerator?
- Does the unit require a dedicated trained operator? How long does it take to train one?
- Do you send your engineer for installation, commissioning and operation?
- Assuming we have 3 dead cows a day per incinerator – how many hours a day it would take to complete the job?
- In case of crisis can the unit work continuously 24H a day?
- Is there any impact of smoke or smell on the surrounding?
3.2 INSPECTIONS AND TESTS:
- General: Demonstrate to the Department of Veterans Affairs that all equipment complies with requirements. The
Contracting Officers Technical Representative (COTR)/Resident Engineer (RE), or their representative shall witness all
tests. Representatives of the pollution control authority that has jurisdiction shall also witness emissions tests.
Provide two weeks advance notice to the COTR/RE of all testing. Pretest all items prior to the final testing that is
witnessed by the COTR/RE.
- Condition of Equipment after Delivery, Rigging, Placement: After setting equipment on foundations, and prior to
making any connections to equipment, the Contractor and COTR/RE jointly shall inspect interior and exterior for damage.
Correct all damage by repair or replacement to achieve a like new condition.
Containerized diesel fueled burners
Heater Kind: Containerized, gasoline
Burning Price:100–– – – 120kg/hour. Minimum Operating Temperature:850 o C( key combustion).
Optimum Operating Temperature:1450 oC( Afterburner chamber).
Extra Burning Ability: Compulsory.
Density Insulation:20 mm High.
Refractory Dispersing: Minimum 65mm.
Strong refracting lining to hold up against:1500 oC.
Common stress out time: optimum:3 personnels.
Fuel kind: Diesel.
Gas Intake in L/hr:7.5 to 9.
Residence time in secondary chamber:2 sec.
Residue ash pot 100kg: Max 3.8 kg.
Heater kind: Pet waste burner.
Lots Capacity minimum: 1500 kg.
Heating unit gas kind: Diesel.
Heater fuel price max.: 20-25 Litre diesel/ per hr.
Heaters minimum: 3.
Burning rate minimum: 200-300kg/ per hr.
Heating system bar place minimum: 2 м3.
Gas container capacity minimum: 300L.
Key chamber melting temperature level min. 1100 0C.
Afterburner chamber burning temperature minutes. 1300 0C.
Power supply 220V.
Burner products and also electrical tools should be weather condition proof as well as also moisture immune within the collection of 30-90 %.
Burner requires to be certified to the ecological monitoring policies in accordance to national legislation.
Maximum dimensions– – Dimension – 5m, size – 3.5 m, altitude – 5m