Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Waste incineration industry momentum is fierce level of related facilities to be improved

[China] Solid Waste Environmental online waste incineration industries development momentum is fierce, and the brightest of capital chasing even appear several times in the last year the price of handling fee diving, industry raised concerns about the vicious competition. “Thirteen Five” during garbage construction market investment space at 1000 billion yuan; the growing garbage incineration capacity of the operation of the facility, the regulatory level challenges. Many industry companies said in simple incineration links, market competition is too fierce, competitive professional enterprises should play in the field of business models and technological innovation.

Waste incineration industry momentum is fierce level of related facilities to be improved

“Twelve Five” is a fast-growing garbage incineration five years. According to relevant statistics, in 2015, the national city and county has accumulated garbage incineration capacity of about 233,000 tons / day. Waste incineration industries development momentum is fierce, and the brightest of capital chasing even appear several times in the last year the price of handling fee diving, industry raised concerns about the vicious competition. Which is still used as the main way of landfill waste, mostly due to the local authorities responsible for managing the operations, the market is not high, remain “low key.”

The future will continue to heat a cold do?

In this regard, some experts pointed out that, on the one hand, waste incineration will continue to grow, but the amount of accumulation and qualitative improvement of equal importance, particularly waste incineration emissions formal implementation of new standards for operation of the facility and set higher requirements; on the other hand landfill as an indispensable and irreplaceable resource, is still dealing with the mainstream. But to find out the remaining storage capacity, make good use of good management will become critical; at the same time, non-canonical transformation landfill, pollution, etc. also brought closure to repair the relevant market opportunities.

According to the deputy director of the Research Center for Environmental Health Engineering Department of Housing and General Workers Liujing Hao introduction, facility upgrades will be the next five years, important content. “China’s solid waste disposal facilities (landfill, incineration plant) construction and development is very fast, there are a number of construction and operation of the facility has a large room for improvement. There are many old landfills need to maintain and update, so as not to pollute the surrounding environment. Some of the early construction of incineration plants need to be upgraded or reset. ”

Incineration facilities is still on the rise

“Thirteen Five” during garbage construction market investment space at 1000 billion yuan; the growing garbage incineration capacity of the operation of the facility, the regulatory level challenges.

‘Facilities’ second five’ plan basically completed the goal. “China Urban Environmental Health Association and vice president, director of the Research Center for Environmental Health Engineering Department of Housing and Xu Wenlong said that according to” the “second five” national urban domestic garbage treatment facility construction plan, “clearly incineration project the total size of 307,200 tons / day. Although the end of 2015, the national total incineration capacity of 233,000 tons / day, but the size of the project currently under construction there of about 10 tons / day, and basically complete the planning and construction scale.

Planning and completion of high interest capital markets has a direct relationship. Construction and operation of waste incineration facility has become one of the segments of capital chasing the parties, after the project in a constant rise to fierce “fight.”

The next five years, incineration facilities construction market is still big? In this regard, the Executive President of the Institute of E20 Xue Tao believes that incineration facilities will maintain growth. “In the construction of garbage ‘Thirteen Five’ period, probably in the investment market space, building space is at 100 billion yuan.”

Xu Wenlong believes that new market does still have a better chance. Currently, most of the city and most of the county’s garbage can be effectively collected and treatment and disposal in sanitary landfill and incineration plants. But still there are gaps in waste disposal facilities, the new facility is still one of the main tasks of the current and the next five-year plan. “According to the relevant national planning, the national MSW incineration capacity in 2020 will exceed 40 tons / day in 2025 up to 50 tons / day. By then, China’s demand for incineration facilities will reach a relatively stable state.”

Accumulation in the continued qualitative improvement already started. From January 1 this year, all new country, has been running garbage incinerator must perform a new “garbage burning pollution control standards” (GB18485-2014) (hereinafter referred to as the new standard) of emission limits. New standards for conventional pollutants, dioxin contamination compared to the previous standard have more stringent requirements.

(Source: China Association of gravel)
Article Links: China Environmental Protection online http://www.hbzhan.com/news/detail/105016.html635925914052780791754

Containerized Mobile Incinerators



Containerized Mobile Incinerator(CA Model)

HICLOVER currently supply a complete array of containerized incineration systems, positioning us at the forefront of the most current transportation and also commercial trends.

Containerization is the most practical and also viable option in contrast to the building of on-site facilities and also real estate frameworks, getting rid of the guy power and also costs entailed.

 

Main Feature:

— Double Combustion Chamber

— Double Italy Burner

–Burning Rate: 10-100kgs per hour

–Combustion Chamber: 0.1M3-1.2M3

— Mobile Incinerator, Standard shipping containers, Easy to move/transport system

— Free Installation, Pre-installed incinerator, Ideal for camps

— Ultraviolet lamp sterilization inside

※Optional Function/Parts/Material/Burning Rate:

— Stainless Steel Chimney

— Dry Smoke Filter Chamber

— Chimney Height Custom Made

— Upgrade/Downgrade Burning Rate



Containerized Incinerators


Model CA50
Feed Capacity Average 60 kgs per feed
Burning Rate Average 70 kgs per hour
Burning Time per Feed 1 hour
Voltage 220V
Power 0.7Kw
Fuel Diesel oil
Burner Italy Burner
Feed Mode Manual
Fuel consumption (Oil) Average 18 Kgs/Hour
Internal Dimensions 100x80x70cm (Primary Chamber)
External Dimensions 230 x 130 x 155cm (main body)
Waste combustion chamber 560Liters
Post Combustion Chamber 280Liters
Oil Tank Capacity 100 Liters
Door Opening 70 x 50cm
Chimney 5.0M
Gross Weight 4500kgs
Chamber Material Firebrick ,Refractory Concrete
Max. Heat Value 240,000Kcal/Hr.
Operation Technical Specifications
Solid Chamber temperature 8000C -10000C
Gas Chamber temperature 10000C -12000C
Chamber Anti-Rate 14500C
Residency time 2.0 Sec.
Burning efficiency >98%
Waste Lower Calorific Power 3000Kcal


SIC opts for new mix of burning and recycling

SHETLAND Islands Council is to introduce “door-to-door” recycling of glass and cans next summer – but paper, card and plastic will be burned in the Gremista incinerator after that was found to be the “best practicable environmental option”.
The Gremista waste to energy plant
While the notion of burning garbage may seem counterintuitive to those seeking to make the planet greener, the local authority’s stance is backed up – at least in the short term – by Zero Waste Scotland.

The waste-to-energy plant burns material from Shetland, Orkney and occasionally the Highlands, and its output then powers SHEAP’s district heating scheme for homes in Lerwick.

Because Shetland is not connected to the national grid, SHEAP has to make up any shortfall in energy using power generated by oil-fired plants. As a result, the council says, it is less environmentally damaging to incinerate material rather than recycle it.

In April 2013 the council abandoned kerbside collection of recycled material in Lerwick and Scalloway – leaving householders to take plastic, glass, newspapers and cans to collection points instead.

The latest recycling rethink is the upshot of two studies commissioned by Zero Waste Scotland, and will cost the local authority £40,000 more than it presently spends on collecting waste and recyclable materials.

Meanwhile, opening hours for the local authority’s Gremista waste management site are to be cut to allow staff to spend more time sorting industrial waste prior to incineration.

It is to switch to opening between 1pm and 6pm on weekdays and from 11am to 3pm at weekends. That is a significant reduction on the current opening hours of 8am-8pm from Monday to Friday and 9am-5pm on Saturdays and Sundays.

It is expected a charge will be levied on commercial and business premises – accounting for an estimated 20 per cent of waste – for recycling glass and cans.

Infrastructure director Maggie Sandison said changes in legislation left the SIC with no option but to change tack. The situation remains in flux, with further legislative changes expected, and she suspects that in the long term the council will be “recycling more and incinerating less”.

Collecting glass and cans “at least” once a month from every islands household will raise the local authority’s overall recycling rate to around 12 per cent, compared to six per cent at present.

SIC infrastructure director Maggie Sandison.  SIC infrastructure director Maggie Sandison.  Shetland will continue to recycle the lowest percentage of material anywhere in Scotland, trailing far behind the SNP Government’s target of recycling 70 per cent of waste by 2025.

But Sandison’s report pointed out that Zero Waste Scotland recognised that –until an alternative heat source to the energy recovery plant is found – “environmental benefits of waste incineration to heat the district heating scheme outweigh the environmental benefits of recycling combustible materials in Shetland”.

A special derogation from environmental regulator SEPA will be required to allow the energy recovery plant to continue burning hard plastics.

She told members of the environment and transport committee on Monday that the plan was to begin the new recycling collection next summer.

Door-to-door collections will help sort municipal waste, but more staff resources will be required to ensure industrial waste is properly sifted through prior to incineration.

“It will require different staffing,” she told environment and transport committee members. “We’re looking to change the opening hours of the waste management facility in order to redeploy staff to sorting waste rather than just accepting it through the gates.”

Sandison said staff would spend the remainder of 2014 looking at the best way to collect recycling, with an eye to Orkney where a similar door-to-door service was recently rolled out.

While “bring sites” for recycling will no longer be used by the council, Sandison said talks were being held about putting in place more textile banks for the Salvation Army “and they can choose what ones they want to use”.

The committee backed the report’s recommendations without objection on Monday, a move welcomed by chairman Michael Stout.

“There are many, many threads to this,” he said, “and I think from my perspective this gives us the best way out of the particular set of circumstances that we find ourselves in.”

Councillor Steven Coutts said he felt there was an opportunity for the council to be “proactive” in encouraging folk to minimise the amount of waste they generate, meaning there would be less material to recycle or burn in the first place.

Sandison agreed, saying the council should also promote reuse, while government regulations should reduce the extent to which things like fruit and vegetables are “wrapped in vast amounts of plastic”.

“We’ll see less and less [waste] when charges incurred in the manufacture of waste start to make that unattractive,” she said. “There are going to be big changes in waste generation as well as recycling as legislation proceeds.”

Clover's Social Media