Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

DIESEL ENDED BURNER, WITH 1000 LTR GAS STORAGE TANK in Addition to 6M SMOKESHAFT


Items/Model

TS250( PLC)

Photo

Idea

Waste Incineration Remedy

Burn Price

Average 250 kg/hour

Feed Ability

Criterion 400kg/feeding

Control Establishing

PLC( Programmable Reasoning Controller Burner)

Combustion Chamber

2000L

Inner Measurements

210x88x110cm

Secondly Chamber

1000L

Smoke Filter Chamber

Yes

Feed Setting

Guidebook

Voltage

220V

Electricity

2.0 Kw

Oil Consumption (kg/hour)

Frequent 24.2( DO)

Gas Consumption (m3/hour)

***

Temperature Display

Digital Current

Temperature Level Protection

Yes

Oil Tank

1000L

Feed Door

2.04 x 1.06 M

Smokeshaft

3Meter

Chimney Kind

Stainless-steel

1st.

Gross Weight

9000kg

Exterior Measurements

3.00 mx1.60 mx3.00 m (without chimney)

TWO (2) YEAR UPKEEP SPARES STRATEGY FOR LINE THING Two X OIL DISCHARGED HEATING SYSTEM

Two X CONCRETE REPAIRING BUNDLE (25KG)

Two X THERMOCOUPLE

Two X FIRE ROPE (1M)

INCINERATION IS A WASTE TREATMENT PROCESS THAT INVOLVES THE COMBUSTION OF ORGANIC SUBSTANCES CONTAINED IN WASTE MATERIALS. INCINERATION AND OTHER HIGH-TEMPERATURE WASTE TREATMENT SYSTEMS ARE DESCRIBED AS “THERMAL TREATMENT”. INCINERATION OF WASTE MATERIALS CONVERTS THE WASTE INTO ASH, FLUE GAS AND HEAT. THE ASH IS MOSTLY FORMED BY THE INORGANIC CONSTITUENTS OF THE WASTE AND MAY TAKE THE FORM OF SOLID LUMPS OR POWDER.

Two X HT MASTIC (PER BURNER)

1 X PPE BUNDLE

2020-06-27

Two X FIRE ROPE (1M)

Two X HT MASTIC (PER INCINERATOR)


HICLOVER – Medical Environmental 

1 X PPE PACKAGE


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-27


Ebola Waste Under Guard, Awaiting Incineration

Some 140 barrels of Ebola-related waste taken from the North Dallas apartment where Thomas Eric Duncan stayed with his fiancée and three children has been moved to a different, undisclosed location, according to leaders in North Texas.

Video from Chopper 5 showed Dallas County sheriff’s deputies providing security at the site until the barrels can be taken away for incineration at a separate, unnamed location.


Dallas Ebola Patient Treated With Experimental Drug

The U.S. Department of Transportation granted a special permit last Friday which allows one company, Stericycle of Illinois, the exclusive right to transport any and all Ebola-related waste in Texas through the end of November.

Stericycle is the largest transport and treatment company in the country, according to the company’s website.

Dallas Ebola Patient Treated With Experimental Drug

[DFW] Dallas Ebola Patient Treated With Experimental Drug
The Liberian man being treated for Ebola virus at a Dallas hospital is being given an experimental drug, according to Texas Health Presbyterian in Dallas.

In late September, the governor of Utah called for a criminal investigation into alleged emissions violations at a medical waste incinerator Stericycle owns and operates north of Salt Lake City.

The criminal investigation is one of three the state of Utah is conducting on the Stericycle incinerator. An investigation by the Department of Environmental Quality is looking into possible regulatory violations relating to Stericycle’s permits, and the Utah Labor Commission is looking into potential violations of occupational safety and health standards that would endanger workers at the site, according to a statement on the official website for Utah Gov. Frank Herbert.


Health Officials Battle Growing Ebola Concern

“The governor has directed the investigations to be completed as soon as possible. If any of the allegations are ultimately substantiated, he intends to use his full authority take swift and aggressive corrective action,” said a statement from Herbert.

As of this writing, a Stericycle spokesperson has not returned a request for comment regarding the investigations. The company had told other news organizations late last month that the allegations were “inaccurate and unfounded.”

Ebola Apartment Now Safe for Tenants: Hazmat Crew

[DFW] Ebola Apartment Now Safe for Tenants: Hazmat Crew
A decontamination crew has completed its work at a Dallas apartment where an Ebola patient stayed before being hospitalized and says the home is now safe for tenants.

A Department of Transportation spokesperson told NBC 5 the agency is aware of the Utah allegations, but added that the DOT did not select Stericycle for the handling of Ebola waste.

Instead, according to the agency, the DOT only reviewed and approved Stericycle’s permit application.


Ebola Hazmat Crew Finishes Work at Dallas Apartment

The DOT referred any questions to the selection of Stericycle for the contract to Texas Health Resources, which runs Presbyterian Hospital in Dallas, where Duncan is receiving treatment.

Texas Health Resources has yet to respond to a request for comment.

Stericycle has had recent, prior experience handling Ebola-contaminated medical waste. The company holds a medical waste removal and disposal contract with Emory University’s Hospital in Atlanta, the same hospital where Dr. Kent Brantly and Nancy Writebol, the two American missionaries who were among the first to contract Ebola, were taken for treatment in August.

The Reuters news agency reported in September that Stericycle initially refused to honor its waste hauling contract, specifically in regard to Ebola waste. It wasn’t until the Centers for Disease Control and Prevention stepped in after nearly a week that Stericycle ultimately complied, according to that report.

Medical Waste Incinerator Diesel


Basic Info.

Model NO.:medical waste incinerator manufacturer
Export Markets:Global

Product Description

YDC incinerator is newest layout for waste treatment, include medical waste, animal cremation and other solid waste. This equipment quality structural for kinds of website, like hospital, incinerator for solid waste, incinerator furnace, incinerator furnaces for pet cremation, incinerator gas burner, incinerator hazardous waste china, environmental department, animal cremation agencies, etc.. CLOVER Incinerator provide updated models with double combustion chamber, mix combustion chamber and smoke filter chamber using refractory lines, and the combustion chamber temperature up to 1200 deg C.

Items Specification
YDC Model YD-10C / YD-20C / YD-30C / YD-50C
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Infectious Waste Incinerators


Basic Info.

Export Markets:Global

Additional Info.

Trademark:nanjing clover
Origin:Nanjing Cn

Product Description

Key Features:  * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *according to order  * High temperature, long life of incinerator.  * Free or minimal installation on site.  * High burn rate, from 10kgs to 500kgs per hourto 6ton daily.  * PLC Control Plane. *according to purchase * New Design for pet animal cremation business.  * One year guarantee on incinerator and parts in stock. 

Program Scope:  1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. 3. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

How to Buy Clover Incinerators

1. Clover Medical save all rights to mend/update product information on website. The specifications are subject to change without prior notice.

2. We accept business term: FOB/C&F/CIF term, by sea/train, full container or bulk goods. 1. FOB (Free on Board), the price leave China port. 2. C&F (Cost and Freight), FOB price and freight cost. 3. CIF (Cost and Insurance and Freight), FOB price and insurance fee and freight cost.

3. Payment Term:
By sea: 50% deposit T/T (bank transfer) in advance, and 50% balance T/T before shipping day.
By Train: 100% T/T in advance.

4.Shipping Document & Packing: Generally, We supply (1)Bill of Lading (Way Bill), (2)Commercial Invoice, (3)Packing List ONLY.
If any further documents/certification and label print/words on packing material or documents which request by importer or local customs, whatever happen in China or oversea, should inform seller in advance and charge as actual cost. For example, Fumigation Certification, embassy certificate, BV/SGS…inspection, certificate of original (C/O), Form A, etc. Buyer must to inform seller in advance and pay these cost. Seller save all rights to postpone/cancel shipping and request lost cost cause this incident. If the importer local customs arrest/request penalty or other situation caused by buyer mistake, Clover Medical save all right to request compensation/litigation. Thanks for your cooperation.

5. The leading time is mostly 3-6 weeks, depending on the products and quantity.

7. Guarantee: One year for the equipment. We supply spare parts for maintenance, free charge within the first year and the delivery charge is on the buyer.

8. Insurance: Bear all risks of loss of or damage to the goods from the time they have passed the ship’s rail at the named port of shipment. we proposal apply All Risks insurance under each contract. When buyer pickup goods at local site, must inspect carefully. If any damage happened under insurance policy, buyer should inform insurance company and Clover Medical Limited immediately. We will provide necessary assistance.

Clover's Social Media