Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Hiclover bio waste incineration



HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.
Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce.

※ Main Quality:— — — — — Dual Burning Chamber — — Dual Italy Burner – – Burning Cost: 10-100kgs per hr–– – – Burning Chamber: 0.1M3-1.2 M3— — — — Mobile Incinerator, Requirement delivery containers, Easy to move/transport system— — — — Free Installment, Pre-installed heater, Suitable for camps— — — — Ultraviolet light sanitation inside

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm
Equipment Double chamber medical infectious waste incinerator Capacity 10-30 kg per hour Characteristics of waste
Mainly syringes and needles from immunization routine and campaign activities. However, the following average characteristics are considered*:
heating value above 2000 kcal/kg (8370 kJ/kg); content of combustible matter above 60%; content of non combustible solids below 5%; content of 
non-combustible fines below 20%; moisture content below 30% by weight
Combustion performance: The medica waste incinerator shall be capable of reducing waste to ash not exceeding 10% of the total combustible 
charges.
Outdoor installation. The medical waste incinerator will be installed outdoors. All incinerator components shall be suitable for but not 
limited to outdoor shaded installation, including electric motors, be resistent to corrosion, moisture and related weather elements.

Products of building and building and construction: The burner will certainly not have any type of asbestos, asbestos-containing products, mercury thermostats, as well as mercury switches. Refractory products will have the ability to meet appropriate standards under ISO TC33 and likewise CEN/TC 187.

Kinds of incinerator style appropriate: Dual-chamber controlled air incinerator or double- chamber pyrolytic burner


WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters

Nanjing Clover Medical Modern Technology Co., Ltd.

Tel: +86 -25 -8461 0201 Site: www.hiclover.com Email: [e-mail       secured] Email: [e-mail       secured]



the three incinerators for burning and incineration of drugs and toxic substances

Requirements and specifications for the process of supply, installation, operation and guarantee the three incinerators for burning and incineration of drugs and toxic substances for customs department

Free three years guarantee for incinerators from delivery date. In addition of free spare parts guarantee letter should be valid for 10 years from the end date of guarantee.
Electric unit should be delivered with service manual in English
Electric capacity should be 380-220 v 60 Hz for all equipment
Delivered time as soon as possible
Validity of offer should be not less than 6 months
In case of order, we need two certificates of origin that should be stamped from Saudi embassy in your country
Commercial invoice (certified from Chamber of Commerce)
Two original bills
Send someone to fix and train our staff for 5 people in each location
Send your manuals for installation units
Waiting for your good reply
Please provide details for the following,
1-Technical explanation includes technical specifications, scope of work, the requirements of the operation and maintenance.
2- Technical explanation for technicians training and furnace operators
3- Catalogs of oven with all the required specifications

The offer price must include the following;-
1. Training for technicians and operators for a period not less than two days at each site and give trainees training certificates
Documents must contain all the information such as brochures, technical resources, operating, maintenance manuals, and brochures dealing with the keyboard
2- Letter from the manufacturer to give three years guarantee for incinerators from delivery date. In addition of free spare parts guarantee letter should be valid for 10 years from the end date of guarantee
3- Provide certificate that the incinerators are environmentally friendly and attach proof that environmental protection organizations in the country of Origin and your product should be emissions free due to the sensitivity of its international air ports.
4-copmany must committed delivery, operation, and installation within 60 days from the date of site projects detection
5- Train five people for two days for each device for a period of two days for installation, operation, and safety. Give them certificates
GARANTEE
Provides operating and emergency maintenance also provides free spare parts for three from the starting date of the project. The company must make regular maintenance every 3 months and raise the maintenance report to the management of public concern and Maintenance.
The company must make all the maintenance work as well adjustment of the control and protection devices and filters / filters purify insulation
Specifications of ovens:
•    Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth.
•    The dimensions of the base are increased by (2 meters) from the edge of incinerators
•    The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water.
•    The floor coating must be high-quality epoxy paint.
•    Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns
•    This umbrella Cover the site furnace and allow bringing the chimney
•   The site is surrounded by an iron fence (sheet metal) 3 meters height from the surface of the earth in order to protect the incinerators from dust storms
•    The iron fence must have a 5 meters Width gate
•    Automatic anti-rust and heat electrical circuit must be provided
•    The furnaces are highly efficient, emissions-free, safe, and environmentally friendly and have capacity of not less than 3,000 kg of materials and the rate of burning at least 400 kg / h
•    The method of feeding the furnace through a side slot or from the top and the emission of the smoke is completely prevented.
•    a furnace Must have two rooms, one of them is the  main room of not less than the “5” stoves to the process of burning materials and other secondary room of not less “2” stoves to burn resulting gas from the first process as well as the chimney
•    The main component of the body of the furnace is stainless steel box, the thickness of not less than 7 mm with a layer of zinc phosphate plated with aluminium reflector to heat
•     the thickness of the door of 150 mm and a hardness of not less than 170 kg / m 3 to be burnt, automatic comprehensive remote system.
•    Furnaces must be destructive enough to burn and incinerate the material which mentioned previously
•   furnaces must have certificates are supported global enterprises and government competent for environmental protection In the country of origin or the General Presidency of Meteorology and Environment Protection in Saudi Arabia
•    The oven can work for 24 hours so as to allow for the burning of materials for a period of not less than 12 consecutive hours and the remainder for cooling and provides full fuel tank with a capacity of 1000 L to turn on the oven.
•    Must have an automatic ignition and diesel is used
•    a furnace has the ability to withstand extreme temperatures up to “130o c And also, it guarantees continuous operation of which can be utilized for 24 hours with the ability to remove residues during the work of the oven, Insulating layer of calcium must be present in the rooms with Thickness not less than 50 mm and a wall thickness of 100 mm
•    Isolation of burning room: the space between the walls must be of the “stainless steel”. In addition, burn room must fill with Thermal insulation material.
•    Ensure that the combustion of materials emitted in the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers
•    Incinerators must contain a system for processing (purification) gasses before emission of the smoke.
•     Incinerators must have the capacity of self-cooling after the end of the daily operating period.
•    Incinerators must have chimney not less than “4 meters” height from the surface of the oven, also, it must be thermally insulated and non-rust able, and must also be removable, installation and tide default.
•    Electrical capacity required “220/ 380-volt “60 hertz
•    Incinerators must be fitted with a control panel of the electronic keys to monitor all the necessary indicators of activation keys, as well as start-up and switch off so as to be isolated inside a metal box with the presence of the following:
Alarm Sensor in the event of (crashes “burner” or purification device or heat leakage       or internal connections and wiring)
Monitors for the temperature of the rooms
Aerosols Filter indicators/ monitors
Room temperature sensors
Indicators for furnaces and index overload
Timer for Extinguish the oven automatically depending on the time required.
•    All equipment must be highly resistant to external conditions such as high temperature (50oc)
•    All doors must have special lock are not allowed non-persons appointed to work.
•    Providing fire extinguisher for each site with a capacity of 10 kg at least

50-100-150-200 Kgs per Human Resources Strong Waste Heater Version TS150 PLC 1570Liters Chamber



Waste Heater Design TS150 PLC, Review

This design is small-scale waste incineration tools for tiny waste end result.

Construction is dual/double combustion chamber with 02 sets oil burner, batch load 
incineration equipment. Waste feed chamber is 1570Liters (1.57m3, TS150 PLC). 
Primary & Secondary combustion chambers and smoke filter chamber. 
Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation.


Primary Combustion Chamber: 

※Main Feature:

— Double Combustion Chamber
— Double Italy Burner
— Smoke Filter included
–Burning Rate: 50-200kgs per hour optional
–Primary Combustion Chamber: 1.57M3(1570Liters)
— Incinerator Mainbody steel: 8mm thickness 
— Paint for outside face: 800°C Rate
Chamber Material: High Alumina Fire Brick Wall, 1750℃ Rate
— Idea for campsite average or below 600 people

— Chimney: 10 Meters, Stainless steel


Feeding door primary chamber:


Items/Model

TS150( PLC)

Picture

Idea

Waste Incineration Therapy

Shed Price

Typical 150 kg/hour

*( 50/100/200kgs/ hr optional)

Feed Capacity

Requirement 750kg/feeding

Control Mode

PLC( Programmable Reasoning Controller Burner)

Text Steel

8mm thickness

Chamber Material

High Alumina Fire Brick Wall Surface Area, 1750 ℃ Rate

Paint for outdoors face

800 ° C Rate

Burning Chamber

1570L

Inner Measurements

150x100x105cm

Added Chamber

750L

Smoke Filter Chamber

Yes

Feed Setting

Guidebook

Voltage

210/230V 50/60Hz

Power

0.9 Kw

Oil Usage (kg/hour)

Normal 20.4-28.0( D.O)

Gas Use (m3/hour)

***

Temperature Level Display

Digital Existing

Temperature Degree Protection

Yes

Oil Storage Tank

300L

Feed Door

80x60cm

Smokeshaft

10Meter

Smokeshaft Kind

Stainless-steel

1st. Chamber Temperature

800 ℃—- -1000 ℃

second. Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

8500kg

Outside Dimensions

300x160x280cm( without smokeshaft)




 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.



Environmental Guideline for the Burning and Incineration of Solid Waste


People living and working in Nunavut often have limited choices available for cost effective and environmentally sound

direction of family and other waste. The widespread existence of permafrost, absence of decent cover material and

remote locations make open burning and incineration a widespread and common practice to reduce the quantity of waste and

make it not as an attractant to wildlife.  A vast array of combustion methods are utilized ranging from burning on the

floor to high temperature dual-chamber industrial incinerators.  Generally, high temperature incinerators are more expensive

to purchase and function and cause less pollution than do the less expensive and lower temperature methods.  However, high

temperature incinerators may safely dispose of a broader variety of waste than can the decrease temperature open burning methods. It is intended to be a resource for traditional, field and commercial districts

operators, communities and many others contemplating trimming and incineration as an element of the solid waste management program.

It assesses waste burning and incineration methods which can be used in Nunavut, their hazards and risks and summarizes best

management practices that may lessen impacts on the environment, reduce human-wildlife interactions and ensure worker and

general health and safety. This Guideline doesn’t address incineration of biomedical waste, toxic waste and sewage

sludge. The management of these wastes requires specific equipment, operational controls and training that are beyond the

scope of the current document.

The Environmental Protection Act allows the Government of Nunavut to execute measures to preserve, protect and enhance the

quality of their environment.

The Guideline isn’t an official announcement of law. For further information and advice, the owner or person in control,

control or management of a solid waste is encouraged to review all pertinent legislation and consult with the Department of

Environment, other regulatory agencies or qualified persons with experience in the management of solid waste.

The Guideline is not an official statement of the law. For further information and guidance, the owner or person in charge,

management or control of a solid waste is encouraged to review all applicable legislation and consult the Department of

Environment, other regulatory agencies or qualified persons with expertise in the management of solid waste.


CONTAINERIZED HEATER FOR INCINERATING HAZARDOUS AND ALSO NON HAZARDOUS WASTES



CONTAINERIZED BURNER FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES (BOTH DOMESTIC In Addition To INDUSTRIAL) AT A MINIMUM COST OF 300KG/HR WITH THE ABIDING BY DEMANDS:

Ø PRIMARY CHAMBER VOLUME 7.2 M ³

Ø BURNING CAPABILITY 300Kgs/hr.

Ø PRIMARY CHAMBER TEMPERATURE LEVEL 850 ⁰ C AND ALSO SECONDARY CHAMBER TEMPERATURE LEVEL 1100 ⁰ C

Ø REFRACTORY THICKNESS 225MM; REFRACTORY WITHSTAND TEMPERATURE 1400 ⁰ C

Ø RAM LOADER CAPACITY 0.75 M ³; FUNCTIONAL CYCLES EVERY DAY 8-16 Humans resources.

Ø GAS DIESEL/NATURAL GAS; RANGE OF PRIMARY BURNERS & & & & RATING: 2 @ 250kw

Ø VARIETY OF SECONDARY BURNERS & & & & POSITION: 2 @ 400kw; ELECTRIC SUPPLY 230V 60Hz

Ø CONTAINER TIPPER, MONITORING SYSTEM, CLEANSING SYSTEM

Ø GAS CLEANING AND ADDITIONALLY GAS MONITORING.MSW1000 General Medical Waste Incinerators melt price roughly 100kg/hr
A2400 Pet/ fowl Waste Incinerators melt rate as high as 200kg/hr. Laboratory waste Monitoring system
01. Liqued water purification system.
02. 03.
Momentary alloted area for purifications system- 30×× × × 20.
The following requirement to be suggesting in the biding document.
1. Strategy of removing treated drainage.
2. Technique of dealing with the sludge.
Duration for building and construction.
5. For the entire task.
6. Guarantee period in addition to maintaincne.



Clover's Social Media