Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
incineration in china
Combustion Efficiency 99.99%
Retention time Of the flow gases not less than 2 Sec in the hot portion.
Excess Oxygen concentration Of primary combustion chamber 3-6% max.
Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and
with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the
secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than
70 C.
Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent
any gas escaping, and the doors should be kept under negative pressure during the operation.
Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.
Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from
suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to
use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance
with KEPARS.
Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the
wet scrubber system including sensors.
Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from
ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D
downstream direction and 2D upstream from any flow disturbancies.
Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and
equiped with suitable stairs from ground to the port with comfortable slope.
Ash Removal It should be auto ash removal system.
Fuel It should be dual system, such as diesel and natural gas.
Feeding System Should be auto feeding system into primary chamber.
Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital
Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also
Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous
monitoring system reading and print out of gas emission parameters…etc.
Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling
if the Temp. will be heigher than 1100 C.
Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the
primary chamber if the combustion Temp. less than 500 C.
Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic
filters.
Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as
stainless steel 316 or equivalent.
Noise Level Not more than 85 dBA during normal operation.
Inaddition The desigh should insure that responsive fail-safe control systems are used.
The incinerator should be installed inside closed suitable building with good aeration and ventilation system.
The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and
waste containers, and cool storage area…etc.
The quotation should included list of original spare parts for 7 years.
The quotation should include supervising, starting up and training of the operators and ministry of health
engineers inside/outside Kuwait.
Detailed drawings, catalogs should be included.Our normal activities generates 2-5 tons of assorted waste
materials per day which range from condemned carcasses, and other wastes all which need to be incinerated at above
800Centigrade measured flue exhaust gas.
NPA and Vision talk trash over garbage incinerator
Non-Partisan Association mayoral candidate Kirk LaPointe is trash talking political rival Vision Vancouver for apparently doing nothing to stop the building of a new garbage incinerator in Metro Vancouver.
“[Mayor Gregor Robertson’s] plan to build an incinerator without community consultation, without transparency and without actual proven technology is an attack on Vancouver,” LaPointe said at a news conference Thursday.
But the fact is the mayor and Vision Vancouver are staunchly opposed to an incinerator and have made that position very clear to Metro Vancouver, the organization that will decide sometime in 2015 how and where to deal with the region’s garbage.
“We are completely opposed to incineration… it’s great that [the NPA] now also seems to share that position,” Coun. Andrea Reimer said Thursday, adding it’s “frustrating” that the NPA hasn’t come out with any new policies.
Council voted in 2013 to consider using a piece of property at the foot of Main Street and Kent Avenue South for a waste centre, but only if it meets strict environmental and health criteria.
The city’s website states it “does not support garbage incineration facilities, and would not allow the burning of garbage at the proposed facility under any circumstances.”
One of the technologies the city said it would consider is gasification, which has fewer emissions and converts waste to synthetic natural gas.
But LaPointe is also strongly opposed to gasification in city limits, saying it is an unproven technology that poses environmental and health concerns.
Instead, LaPointe supports unspecified landfill options, recycling options and sorting technologies.
Regardless, Metro Vancouver has not yet chosen where to put a waste plant.
“The NPA believes strongly in fighting to keep our air clean and our citizens healthy, but Vancouver’s waste-to-energy plans are likely to generate more emissions and harmful chemicals into the atmosphere,” LaPointe says. “An incinerator or gasification plant is simply not a green option. There are significant health and environmental challenges with both options.”
He says Gregor Robertson and Vision Vancouver, the supposed defenders of all things “green,” are doing nothing to stop the building of a costly new garbage incinerator in Metro Vancouver and are proposing their own “gasification” plant at Main St and Kent Ave. “They have failed to defend the interests of Vancouverites.”
LaPointe says he and an NPA government will fight the plans no matter where the incinerator might be built, and instead concentrate on ways to increase reducing, reusing and recycling the City’s solid waste.
“The only thing less green than burning or “gasifying” garbage in Vancouver is using fossil fuels to ship it elsewhere for burning. We share our air with the region’s other municipalities.”
LaPointe says fiscal concerns accompany the health and emissions worries. “The construction of a new incinerator represents significant risks for taxpayers,” he says, noting its cost of construction has increased by almost $50 million to the current $517 million estimate. “Vision Vancouver’s failure to address the cost issue again demonstrates its failure to manage the City financially.”
The Burnaby waste-to-energy incinerator, which loses money annually, is expected to lose another $16 million in this year.
LaPointe says Metro Vancouver has publicly identified three potential sites for a solid waste incinerator, while six additional, secret sites are under consideration. The City of Vancouver has also proposed a gasification facility in South Vancouver and that has residents concerned.
Jay Jagpal, NPA Park Board candidate and South Vancouver resident, says: “My community is very concerned about the lack of transparency around this project, with its potential to have an impact on so many people. This is typical behaviour of Vision and Vancouverites deserve better.”
Metro Vancouver’s proposed Bylaw 280, a plan to raise costs on waste disposal, is a key step in subsidizing these plants. An NPA government would work to prevent the bylaw from coming into force.
Incinerator for Pharmacuticals Comapny
Product Description
Incinerator is a incineration equipment, direct fire squander by gas fuel or oi gas. As distinct circumscription, incinerator can be termed many words as below:
Treatment capacity: Small scale incinerator, big scale incinerator and incineration pant. All over the planet, in most nations, people anti incinerator because the incinerator will create a large Dioxin from the smoke. “Dioxins” refers to a group of poisonous chemical compounds that share certain chemical structures and biological features. Dioxins can be released to the environment through woods fires, backyard burning of garbage, particular industrial activities, and residue from past commercial burning of waste. Dioxins break down very slowly and previous releases of dioxins from both natural and man-made sources still exist from the environment. Anyhow, we have to remind this, that is big scale incineration pant, normally more than 30 ton per day. This is a social problem, clover incineraters, clover medical China, clover medical net, clover-medical, clovermedical. Net, structure of an incinerator, cost for incineration for pets cost of running 100kg, Cremation equipment cost animal, to examine and suggest ways in various angles in the general public, government, economic growth, environmental protection, technology advancement, etc..
Therefore, why people still use incinerator? First, for your medical waste in the hospital, the pyrolytic incinerators is greatest treatment up to now. Pyrolytic technology can kill the virus, pollution management. Second, for individual body, pet animal, in most nations and regions, we want to cremation them. This is the service in the procedure for society growth, and ceremonies to commemorate the disappearance of life.
As previously two reason but not only above, we still use incinerators.
How you can find reasonable incinerator to your regional site? Incinerator isn’t a cheap equipment, normally the small scale model's cost around $5, 000USD per unit and big scale model's cost more than $50, 000USD per unit. Thus, before purchase one unit incinerator, you need to make clear after items: A, burn what? Incinerator is a incineration equipment, function is fire squander. So what sort of waste you would like to treatment? B, small or big? This according to the waste output daily or the waste volume per feed time, like animal size. C, fuel? Incinerator use oil or gas , normally, gas fuel is cheaper than oil and also the smoke cleaner than petroleum gas version. However, some local site don't have gas supply system. And other technology items, such as electricity (220V, 380V), waste feed doorway kind, incinerator structure, etc..
After you describe these, you can go to find a local or global manufacturers, requesting prices, technical specifications and ultimately purchasing the ideal products.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
Burner Maximizing Combustion Performance
More smoke along with various other pollutants are introduced right into the air throughout the ‘‘ start-up’ as ‘well as ‘ amazing’ stages of the shed cycle
than throughout the ‘‘ full thaw phase ‘when heats are preserved. Reduced temperature degree smoldering fires need to be
prevented. Melt just dry feedstock as well as sometimes include added waste to the fire in order to keep high melt
temperature levels up until all waste has really been wrecked. If waste is to be open burned on the ground, taking advantage of deep or steep-walled
‘‘ pits’ have to be stayed clear of as this will certainly stop the necessary harsh mixing of oxygen with the burnable gases.
Preferred running temperature degree ought to be completed as promptly as feasible when running any kind of burning or incineration device. A
quick ‘‘ start-up’ can be achieved by initial openly filling completely dry paper, paperboard product packaging and without treatment wood right into the lower
of the gizmo. Dry, openly packed material will stimulate faster as well as also burn extra evenly than a damp, securely stuffed tons.
Moist waste requirement to simply be included after the fire is proactively burning. Overfilling the burn chamber will absolutely avoid the rainy
blending of burnable gases in addition to oxygen, along with should be protected against.
Modern batch feed incinerators are made with supporting as well as main heaters to accomplish as well as protect the required high
thaw temperature levels. Added waste needs to just be consisted of in these incinerators once the ‘‘ cool off’ phase has actually been
finished along with it is safe to do so.
Animal Carcass Incinerator
Basic Info.
Additional Info.
Product Description
Key Attributes: * All models with Dual combustion chamber. * Stainless Steel chimney/stack, long life. *according to sequence * High temperature, long life of incinerator. * Free or minimum installation on site. * High burn rate, from 10kgs to 500kgs per hour, up to 6ton daily. *according to order * New Design for pet animal cremation business. * One year guarantee on incinerator and components in stock.
Presently, we provide different collection for local customer requirements and layout updated incinerator with our leading technology. Animal iacinerator, creature incincerator pricing, creature incineration, creature incineration emerging technologu, creature incineration gear in china, creature incineration equipment Costs, The updated design characteristic of our range of incinerators make them one of the most cost effective in the world.
Items | Specification | |||
YD Model | YD-30 / YD-50 / YD-100 / YD-150 / YD-200 / YD-300 / YD-500 / YD-600 | |||
Main Product List | Primary Combustion Chamber | |||
Secondary Combustion Chamber | ||||
Mix Combustion Chamber | ||||
Smoke Filter Chamber | ||||
Incinerator Common Control Case | ||||
Stainless Steel Chimney | ||||
Italy oil/gas burner: 02 units | ||||
Oil Tank (if oil fuel) |