Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Hazardous Waste Camp Incinerator


Product Description

Technology Respond(FAQ) 

Q: What’s kind of waste may utilize in this equipment?  A: This equipment for medical waste, pet animal, Municipal waste, reside waste. Prohibit any volatile and radiation substance, liquid waste and gas waste.  GB18484-2001. 

Q: Remedy capacity  A: Average Ability calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg a hour)doesn’t indicate any waste material. The animal/pet combustion rate around 2/3 of ordinary power. 

Clover incinerator utilize time daily to 24 hours. Between every feed/combustion time, you will find about 0.5-1 hours cooling time plus time to get feeding waste. Actual combustion time daily is around 16 hours. The lifetime of incinerator involving 5-10 year according to utilize. 

Ordinarily, we proposal little laboratory, little clinic use capability under 20 kgs per hour. If incinerator use in hospital, then please calculate the waste output around 2kgs per individuals per day. If there are 200 sickbed in the hospital, that's mean you need one incinerator capability around 400kgs per day, change to power per hour is around 30-40 kgs per hour. According the performance time per day, waste material, funding, growth, etc, pet crematorium equipment for sale, pet crematory burner, pet crematory china, pet crematory incenterator, pet equipment china, pet incinerator price, pet incinerators sale, you may use capacity from 30-50 kgs per hour incinerator.  *How to calculate Animal Cremation Burn Rate: 2/3 of this medical waste. 

Q: Assembly and Testing  A: We provide all documents and incinerators easy to installation and operation. Client can send individuals visit our factory to learn installation and operation. Generally, We do not send engineer to local website if not ask. The dispatch price is extra according to purchase. 

Q: Combustion Temperature  A: The first combustion chamber: 800-1000 centi level.  The second combustion chamber: 1000-1200 centi level.  PLC mode according to model and order. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to performance user guider, and understand threat of medical waste to safeguard worker self with mandatory protection element. 

Q: The Residency period in secondary combustion chamber  A: 02 sec.

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Medical Incinerator Specification


Capacity Not less than 500Kg/hr.
Operation 24hr-7days/week continuous operation.
Combustion chamber 2 combustion chamber.
Temp. First combustion chamber 800-1000 C.
Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.
Combustion Efficiency 99.99%
Retention time Of the flow gases not less than 2 Sec in the hot portion.
Excess Oxygen concentration Of primary combustion chamber 3-6% max.

Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. 
resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the 
same time prevent the Temp. of the outside body of the chamber not higher than 70 C.
Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and 
the doors should be kept under negative pressure during the operation.
Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.
Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti 
corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled 
circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.
Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system 
including sensors.
Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy 
opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any 
flow disturbancies.
Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable 
stairs from ground to the port with comfortable slope.
Ash Removal It should be auto ash removal system.
Fuel It should be dual system, such as diesel and natural gas.
Feeding System Should be auto feeding system into primary chamber.
Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the 
primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, 
auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.
Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be 
heigher than 1100 C.
Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the 
combustion Temp. less than 500 C.
Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.
Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or 
equivalent.
Noise Level Not more than 85 dBA during normal operation.
Inaddition The desigh should insure that responsive fail-safe control systems are used.
The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has 
facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and waste containers, and cool storage 
area…etc.
The quotation should included list of original spare parts for 7 years.
The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside 
Kuwait.
Detailed drawings, catalogs should be included.


resilient and extremely efficient heaters with different capacities for hospital/medical waste, cremation as well as additionally various other solid waste therapies



Single and also Double Chamber Medical Incinerator.durable and incredibly dependable burners with numerous capacities for hospital/medical waste, cremation in addition to numerous other solid waste therapies.

Chamber Dual

Burning Rate 10 kg per hour (for 2 incinerators)

Burning Price 20 kg per hr (for three heaters)

Packing Method Manual

No of Burners Solitary for 10 kg/hour and Double for 20 kg per human resources

Gas Diesel and likewise Natural Gas

Heat Up Time Not above 20 mins

Temperature controller Digital

Power Supply Single Phase 220V

Smokeshaft Altitude 20 feet from ground degree

· 50kg per hr

· Option for medical waste.

Kind
Singular Chambered Round

Feed Product
Files, Containers wastes

Capability
1000 Kg/Day

Burning Capacity
125 Kg/hr

Format Standards
Normally validating to IS Standards

Sort of melting procedure
Absolutely No Gas System

Burning Chamber

Kind
Cylindrical

Measurement
1.25 m Dia (Approximate) x 1.2 m Elevation (Approx)

Temperature Degree
400– – 600 ° C

MOC
Chrome Alloy Steel, inside lining with fire bricks/Ceramic Clay

Outer Lining
Thermal Proof Cellular Lining

HEAP

Type
Self Sustained

MOC
MS

Devices
Port Opening as well as Ladder for exhaust screening with complete online massaging system, thermostat

The systems will be made use of for our consumer camps in the field.



a burner for food waste as well as also polythene waste administration



an incinerator for food waste and polythene waste administration. based on our needs we would such as the YD 15C tiny incinerator.Mixed Biomedical waste Incinerator.Contract period: To be chosen by the provider
Negotiation terms:100% prepayment via banks TT after signing of contract.

Please validate your resolution to perform this contract job by sending handout and also your rate quotation for the listed below specification to allow us submit it to the firm incharge of the agreement for their study and additionally authorization.

Sort Of Waste: Mixed Biomedical waste.THE BURNER AS REQUESTED BY OUR CUSTOMER SHALL BE SEMI AUTOMATIC WITH:
WASTE BUCKET/TANK – – – – CONCERNING 2000KG CAPACITY OF FEEDING: REGARDING 600-800Kg Each Time.
THAWING AT ABOUT 150/165 -200 IN 60MINS THE HEATER SHALL USE DIESEL/OIL WITH SMOKESHAFT, ELECTRIC PANNELS, ELECTRIC MOTORS, And So On.
PRODUCTS FOR DISPOSAL: SHARP MEDICAL WASTES.

1. Waste burning ability of device: 100-125 kgs/ personnels.
3. 5.
6. Connected electric great deals: Approximate. 7-8 KW (A/C 3 stage,220 V, 50 Hz).
7. Total area need: 9 m (L) X 8 m (W) X 6 m (H) Each unit without stack

Heaters temperature degree regulated (TIC– – Thermocouple) as well as likewise handle ON––. OFF basis. The consistency on ON– – OFF will certainly depend upon the nature of.
waste, dampness web material, calorific worth, and more along with will certainly vary from waste to.
waste. The gas usage similarly depends upon the frequency of the door.
opening along with strategy of operation of the incinerator. We have in fact mentioned.
approx. expected fuel usage figures.

The Incineration System includes:

I. Key Incinerator with.
A. Main & & & & Additional Chamber Modules appropriately refractory lined, piped & & & & wired.
B. Container lift + DFDV gadget for autoloading and also Deashing.
tool.
II i. 1 No. totally automated Gas Oil burner for main chamber.
ii. 1 No. totally automated Gas Oil heating system for extra chamber.
III. Centrifugal forced draft follower establishing total with electric motor drive, duct as well as also.
dampers, and so forth set up on the regular skid of the gadget to offer:.
Burning air.

Eductor air.
IV. Eductor Establishing for:.
A/c of exhaust gases from 900– – 1000 0 C to around 350 0 C. Keeping the entire system under negative anxiety to stay clear of hot gases/ dirt.
bits hurrying out of billing door.
V. Electric Control Panel along with safety and security as well as protections, as well as likewise Audio/ Visual.
signs as well as.
/ or alarm systems for effective and likewise risk-free treatment of the system.
VI. Electric electric wiring of the device.
VII. Oil tank of 1000 ltrs capability placed on the skid.
VIII. Operating tools and also takes on consisting of– – rake, hoe, shovel (I No. each).
IX. Smokeshaft of 2.5 Mtr elevation.



small animal incinerator


  1. Piping and stack connection locations and sizes.

 

  1. Technical data including temperature rating and arrangement of refractory and insulation.

 

  1. Weights of unit and loading diagram of foundation. Evidence that contractor has coordinated support

requirements with foundation design.

 

  1. Recommended anchorage to foundation. Seismic requirements apply. Submit calculations by professional engineer.

 

  1. Predicted external surface temperatures.
  2. Certified test report on performance of similar unit burning waste types which has composition similar to

Article, PROJECT CONDITIONS, this specification:

 

  1. Overall burn time and weight reduction.
  2. Waste quantity and composition per batch.
  3. Emissions in all categories specified in PART 2.
  4. Auxiliary fuel use.

 

  1. Catalog data on burners, sound attenuators, fuel trains, motors.

 

  1. Fuel requirements: Flow rate, pressure at inlet to fuel train.

 

  1. Full load power, efficiency, and power factor of all motors greater than one horsepower.

 

  1. Electrical service requirements for all motors and controls.

 

  1. Predicted sound level of all systems.

 

  1. Schematic diagrams of control systems. Catalog cuts on components of control and instrument systems.

Description of operation of control system.

 

  1. Arrangement and location of control panels.

 

  1. Stack System:

 

  1. Drawings showing system arrangement and dimensions.

 

  1. Weights of subassemblies.

 

  1. Design, construction, pressure and temperature limitations of entire system including expansion joints and

dampers.


Clover's Social Media