Basic Info.
Product Description
Technology Respond(FAQ)
Q: What’s kind of waste may utilize in this equipment? A: This equipment for medical waste, pet animal, Municipal waste, reside squander. Prohibit any volatile and radiation material, liquid gas and waste waste. GB18484-2001.
Q: Remedy capacity A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not indicate any waste material. The animal/pet combustion rate around 2/3 of ordinary power.
Clover incinerator utilize time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time plus time for feeding squander. Incinerator combustion room photo, incinerator crematory, incinerator dealers, incinerator diesel fired, incinerator for medical waste, incinerator for medicial waste, Actual combustion time daily is around 16 hours. The life of incinerator involving 5-10 year based on utilize.
Ordinarily, we proposal small laboratory, small clinic use capability under 20 kgs per hour. If incinerator use in hospital, then please calculate the waste output capacity around 2kgs per individuals every day. If there are 200 sickbed at the hospital, that's mean you need 1 incinerator capability around 400kgs every day, switch to power per hour is approximately 30-40 kgs per hour. According the operation time every day, waste material, funding, development, etc, you may use capacity from 30-50 kgs per hour incinerator. *How to calculate Animal Cremation Burn Rate: 2/3 of this medical waste.
Q: Meeting and Testing A: We supply all documents and incinerators easy to installation and functionality. Client can send individuals visit our factory to learn installation and operation. Generally, We do not send engineer to local website if not request. The dispatch cost is additional based on order.
Q: Combustion Temperature A: The very first combustion chamber: 800-1000 centi level. The second combustion chamber: 1000-1200 centi level.
Q: Incinerator Control Mode A: Default Control manner is common control case. PLC mode based on model and order.
Q: Operation and maintenance costs A: Operation cost based on fuel consumption rate and power/staff, etc.
Annual approximately $500-$1000USD annually maintenance according model, utilize situation.
One individual can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation consumer guider, and know risk of medical waste to protect worker self with necessary protection element.
Q: The Residency period in combustion chamber A: 02 sec.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |