Heater ability of devastation of 350 kg/hour


– – – – – – – – Waste will probably be automatic feeding system directly into the burner.

– – – – – – – – Control plank will absolutely be fitted using a beneficial synoptic view disclosing the operating scenario of the entire

heater as well as also cared for by DCS/PLC system.

– – – – – – – – Heating system will certainly be made as a Packaged method, having electrical web link last as well as pre-wired pipes

in placing.

– – – – – – – – Control plank will absolutely be fitted using a valuable synoptic view disclosing the operating situation of the entire

heating system as well as likewise taken care of by DCS/PLC system.

– – – – – – – – TOC of slag as well as bottom ashes will absolutely be much less 3% of the completely dry weight.

– – – – – – – – Heater will surely be created as a Packaged system, having electric connection pre-wired as well as last pipes

in positioning.

– – – – – – – – Burner will surely have automated de-ashing system with higher instructions.

in position.

– – – – Incinerator will possess automated de-ashing system with upward direction.

– – – – Burner will surely have flue gas therapy system comprehensive [emergency scenario by-pass heap, gas heating system,

two activators as well as additionally particulates filtering method ] as well as assurance of discharges out of burner.

– – – – Training of AKU workers at website.

– – – – website could be assessed as well as likewise take a look at existing ATI maker, capacity 150 kg/hr. In 1 day therapy.

– – – – Existing facilities space is conveniently available in basement, 100′ ′ Size x 30 ′ large x 20 ′ Altitude for 2nd Incinerator.

– – – – Existing smokeshaft dimension is 12 meter, and additionally size is 24″ ″ dia.

common daily bloodbath involves 120 pigs. The Condemned thing along with additionally results in the abattoir for Entry is around 1000 kgs.daily{
(adsbygoogle = window.adsbygoogle || []).push({});|}


Posted in incinerator-uae.