waste heater suppliers from china



Incinerate: medical waste as well as additionally basic waste Capability to melt waste:
400-500kg/ human resources.
Gas: Diesel.
Gas Consumption: 10 liters/hr optimum.
Incineration temperature: 950-1300 levels centigrade.
Case: thick (mins 5mm) stainless-steel covering as well as absolutely safeguarded to.
stand up versus sea humidity Voltage 220/240v or 380/415V Uniformity 50Hz.
high-capacity, powerful, European Requirement heater, ideal for high quantity incineration, with indispensable after-burner for higher performance in addition to exhausts manage.
Waste Type as well as Melt Rate.
Made specifically for usage by fowl farmers,.
lamb farm owners, abbatoirs along with for pet dog.
cremation. The heater will certainly lose approximately 50kg of.
waste per hour (as long as 150kg shed.
Building and construction.
Light steel bonded construction having sheet steel.
As structural area sustains.
Cellular cellular lining.
Monolithic premium quality refractory concrete with high grade insulation support.
Heating units.
Absolutely automated, high-efficiency burners with electronic ignition, flame recommendation as well as burning control devices fitted.
Packing– – Ash elimination.
Hands-on ash removal from the key chamber. (Ash doors are readily offered as needed).
Outside finishing.
Multi-coat premium quality, high-temperature aluminium enamel leading layer paint, finished in silver.
Control.
Completely automated sequential control given by interior.
waste heater manufacturers from china, PLC system providing control of:.
1. Extra chamber pre-heat.
2. Lost cycle (variable).
3. Great cycle.
Fuel Options.
Diesel, LPG, Natural or Biography Gas.
Regular Gas Intake.
Diesel: 8/ 10 litres per hr.
Fluid Gas Gas: 6/ 8 litres per hr.
Gas: 7/ 9 Nm3 per hour.
Electrical supply.
240volt 16 amp.
Secret Requirements.
Chamber Amount 2.38 m3:.
2.2 m (l) x 0.9 m( w) x 1.2 m( h).
Lots Capability approximately 1000kg.
Heaps Technique Top. · Kind: Pyrolytic

· Usage: For medicines

· With Chassis to be Placed in truck/lorry

· May have a main along with added combustion chamber

· Should have a dilution chamber

· Capability: 100 Kgs per hr

· Resource Of Power: Diesel or Natural Gas or Liquified Gas



WASTE INCINERATOR


 

–          150 KG/HR

–          Compliant with EU principles, Directive 2000/76/EC

–          Fuel type: Diesel

–          Easy management and maintenance

–          Temperatures:

850 deg C for municipal waste

1000 deg C for medical waste

1100 deg C for harmful waste containing halogenated organic compounds with content of chlorine or its compounds.


Pyrolytic Incinerator


Basic Info.

for Animal:All
Dosage Form:Incineration
Type:Cremation
Function:Cremation
Export Markets:Global

Additional Info.

Trademark:nanjing clover
Origin:Nanjing Clover

Product Description

Research and Markets: Waste: A Handbook for Management 

The breadth of information included in this single volume will ensure it is the most extensive coverage of waste on the market. It focuses on all the main areas including household waste (compostable material, paper, glass, fabrics, household chemicals, vinyl, water, e-waste), pet and industrial waste incinerator, pet. Crematory, pets perennial gear, pets crematorium, pharmaceutical burning incinerator, pharmaceutical>waste tag, pharmaceuticals waste, social waste (metals, building, tires, medical battery, toxic mining, nuclear, ocean, military, and distance ), and the future of landfills and incinerators. Including all of the issues associated with waste in 1 volume can help lead to comparisons, synergistic solutions, and a much more educated society. Besides a comprehensive coverage of waste, this publication will offer the very best methods for managing the problems via recycling, incineration, landfill and other procedures.

Incinerator Primary Combustion Chamber


HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial 
trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.
Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, 
eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal 
for military and civil camps and remote locations where infrastructure is scarce.
Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with 
other disposal methods.
Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid 
cross-contamination risk and to keep waste treatment costs at acceptable level.

WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters

Nanjing Clover Medical Technology Co.,Ltd..


incinerator type of pyrolytic medical waste incinerator capacity


Including:Incinerator: Structure to be specified
The mark to be specified
Water temperature: 800 to 1000 ° C;
Refractory
Temperature of more than 1100 ° C + obtained;
Capacity: 20-50 kg / hour
Fireplace: 4 to 6 meters high;
Dimension 70 cmx70 crn
Height: 1.10 meters
Fuel: coal;
Aspiration: natural

– A receiving cage for biomedical waste;

– A combustion chamber with a chimney with a filter to retain the ashes;

Chimney section: about 300 cm; With a minimum height of 6 m

Door size: approximately 50×60 cm

Supplied with a 500 liters fuel tank and all necessary accessories for installation.
–                          INCINERATOR for pharmaceutical waste treatment with                  a scrubbing system

With the following technical data:

1.      One pharma solid waste incinerator unit containing two combustion chambers and based on steel base with scrubbing

system.

2.      Working hour /day: minimum 10 hours/day.

3.      Capacity: Approximated 150 kg/hr. Over 10 hrs.

4.      Wastes characteristics:

·         BULK density: 70 – 100 kg/ bm³.

·         Calorific value: 2000-3000 kcal / hr.

·         Moisture content: 20-30%by weight.

·         Ash content: 2 – 8 % by weight.

·         Plastic content: 15-20 % by weight.

5.      Two combustion chambers.

6.      Operating temperatures:

·         First chamber: not less than 700 – 800 °c.

·         Second chamber: not less than 1200 °c (during steady operation).

7.      The burners should be automatically switched off if any of the combustion chambers doors is open.

8.      The burners of the first and second combustion chambers are selected for burning diesel oil (light fuel).

9.      Automatic loader and unloader to be provided.

10.     Exhaust gases to be comply with International Environmental code and requirements.


Medical Waste Treatment


Basic Info.

Model NO.:medical waste incinerators
Type:Incinerator
Export Markets:Global

Product Description

Key Features:  * All models with Dual combustion room.  * Stainless Steel chimney/stack, long lifetime. *based on sequence * High fever, long lifetime of incinerator.  * Free or minimum installation onsite.  * High burn rate, from 10kgs to 500kgs per hourto 6ton per day.  *based on order  * New Design for pet animal cremation enterprise.  * One year guarantee on incinerator and parts in stock.  Program Scope:  1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste.  3. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation 

Incinerator is a incineration gear, direct fire squander by gas fuel or oi fuel. As distinct circumscription, incinerator could be termed many words as below: 

Treatment capacity: Small scale incinerator, big scale incinerator and incineration pant. 

Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, individual cremators 

Incinerator fuel: Gas incinerator, petroleum incinerator 

Waste to Energy (WTE): WTE incinerator, non-WTE incinerator 

Incinerator Manufacturer: China incinerator producer, UK incinerator producer, USA incinerator producer, India incinerator manufacturer. 

Famous Incinerator manufacturer company: Inciner8(UK), garbage destructor, garbage destructors, tube incinerator for paint and crematory, turbulance in incineration, two room incinerator, two chambered incinerator, Clover Incinerator(China), Pennram (USA), Haat (India) 

Burning Speed: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour

Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Medical Waste Incinerators


Basic Info.

Model NO.:medical waste incinerator 300kg/time china
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What’s kind of waste can utilize within this equipment?  A: This equipment to medical waste, pet animal, Municipal waste, reside waste. Prohibit any volatile and radiation substance, liquid gas and waste waste. 

Q: Incinerator Smoke Standard  A: China Government Standard: No. GB18484-2001. 

Q: Remedy capacity  A: Typical Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg a hour), not mean any waste material. The animal/pet combustion rate around 2/3 of ordinary capacity. 

Clover incinerator utilize time daily to 24 hours. Between every feed/combustion time, you will find approximately 0.5-1 hours cooling time plus time for feeding waste. Laboratory incinerator china manufacturer, big animal incinerators, low-cost medical waste incinerator, pet crematory, pet incinerator deisel, pet incinerators, Actual combustion time per day is around 16 hours. The life of incinerator between 5-10 year based on utilize. 

Ordinarily, we proposition little laboratory, little clinic use capability under 20 kgs per hour. If incinerator use in hospital, please calculate the waste output around 2kgs per people every day. If there are 200 sickbed in the hospital, that's mean you need one incinerator capability around 400kgs every day, change to capacity per hour is around 30-40 kgs per hour. According the operation time every day, waste material, funding, development, etc, you can use capacity from 30-50 kgs each hour incinerator.  *The best way to calculate Animal Cremation Burn Rate: 2/3 of this medical waste. 

Q: Meeting and Testing  A: We provide all documents and incinerators simple to installation and functionality. Client can send people visit our factory to find out operation and installation. Generally, We do not send engineer to neighborhood website if not ask. The dispatch price is extra based on order.  The next combustion chamber: 1000-1200 centi level.  PLC mode based on model and order. 

Q: Operation and maintenance costs  A: Operation price based on fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according version, utilize situation. 

One individual can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower based on operation user guider, and understand threat of medical waste to protect worker self with necessary protection element. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Powerful Waste Incinerators


OVERALL REACHED COLLECTION

Layout in addition to Create approved gas metering system.
8.
16. Details of space available: Not restricted
19. How fast do you require the machine to be supplied? : Sea Freight to Port of Cairns, Queensland, Australia in approximately Two months.
11. Approximate moisture articles: Variable
( Cont would certainly)

4. ) The Service provider will offer in addition to totally comply with all needs from the associated authority during design stage, design authorization, appraisal and after evaluation, handing over the machine package whether it is plainly exhibited or yet considered needed for successful conclusion in addition to contentment to the jurisdiction. The Contractor has to acknowledge his tender cost all direct and indirect price at no extra price to the Client for all such conformities.7.
20. City in addition to state of usage: Australia.
13. What is the height of this smokeshaft required? : No chimney is called for. Flue length Should be approximately 2 to 3 metres to connect to a downstream Procedure
22. Any sort of different details requirements: Primary burning chamber is required. Solid and also ignitable waste products require in order to be together with the capacity of being recovered from the incinerator quickly using an automated therapy. This is due to the fact that the incinerator will surely be called to operate 24/7. Rotating kiln or transferring floor may be thought about if believed sensible by the distributor. One initial incinerator is needed for a proof of idea task and also future orders for the successful vendor, after successful implementation of the project, are most likely to be significant.
18. Do you call to get a gas scrubbing system? : [] Yes [X] No.
9. Number of waste generated each day in kg: 3 -5 tonnes per day
10. Stage – incinerator will be used per day: 1– 8 hours1– 16 hrs/ Constant
23. It would be most valuable in the event the provider might send out a video of their incinerator in performance or layouts in addition to photos to demonstrate how it works.

5. The Professional will probably be in charge of all upkeep of their machine, routine and also periodical maintenance such as cleaning up etc. , upon completion, prior to and also following examination. The maintenance will be in fully conformity to the jurisdiction needs in addition to fulfillment and also shall be deemed included in the Specialist tender cost in addition to at no extra cost to the Client.

6. The Contractor must send to the S.O their proposed system plan detail, so that includes jurisdiction authorization and an A4 or A3 preliminary dimensioned system design fitting into place allocated in the plan drawing. For upkeep and solutions during Problem Liability Duration, respond period to any type of criticism for the Contractor to take part in shall be within 24hours

8. The Cremators plan will, inter alia, inclusive the tasked with scope:

– – Heating System Chamber along with Afterburner

– – Burning System

– – Control Board

– – Solitary refactory lined chimney for two cremators

– – Flue Gas Tasting Platform

– – Electrical circuitry inside the system requires

– – Raking Tools

– – Ashbox

– – Authorization from DOE/ Regional Authority

– – Any other scope/works Needed for its systems

The Professional provides a Cremation System bundle for TWO (02) Cremators and system approved by related jurisdiction, which will need to suit the alloted area as shown on the plan drawings. The job will include however not confined to make prep function, authority layout consent, supply, fabricate, construct, appointing, testing, functional approval, provide training in addition to additionally support warranty of the machine package. The job includes all preliminaries, related civil and also structural function, mechanical along with electrical project in addition to all external project required for the correct completion in addition to operational of the machine and as adheres to: The incinerator will surely be used to get a group of private multi profile medical facilities.

The hourly-generated waste has to do with 100kg per hourhowever with 1000kg daily amount.

As a consequence of the fiscal circumstance in Bulgaria currently, our researches demonstrates that a 100kg/hour system can match the needs set at work.

Please, offer us an Incinerator system that can match the parameters defined above. We prepare to offer details that’s more comprehensive if you require such one. Within the specialized requirements of you thing we will need to have complete particulars of the specifications of exhaust gases, together with all certificates you have about the ecological safety regarding EU directives.

1. All preliminaries that will include but not limited to offering job insurance coverages, taxation, mobilisation and demobilisation, arrangement administration and guidance, design and also expert charge, authority style approval, functional approval, website prep function, momentary storage, health and health environmental safety and safety and safety, setting out, CIDB levy, responsibilities, deposits, penalties, fees, payment yet not leaving out only the bank guarantee to this jurisdiction JPP which will be offered from the Client, growth coverage and also other called for preliminaries for effective conclusion of the work.This type of burner is exactly what you have described as a ‘‘ reduced temperature thermal disintegration incinerator’. We can speed up the burning procedure using warm air from a downstream process that can be fed straight back right into the incinerator to elevate the burning temperature.

– – Ashbox

– – Authorization from DOE/ Regional Authority

– – Any other scope/works required for the systems