BURNER SCREENING AND ALSO COMMISSIONING


The tenderer will certainly give hydrostatic oil materials estimate (level indication) or a.
– – Manufacturer’s title of occupation mark.
( ii) 75mm (3″″) port socket screwed B-SP as well as pipeline at the end of the storage tank having an unloading device to avoid the rise in storage area tank strain over the design strain and anxiety. The air compressor pipe shall be empty of bends and will have a continual increase while being as quick as problem-free.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
Background deciding 510mm lengthx380mm dimension as follow;

1.1.5 OIL STORAGE in Addition to ALSO SUPPLY

iii) 1No. Oil ignition method

– – Exam anxiety.

The strain will be raised gradually as well as steadily up until the specified examination stress is gotten to which pressure is going to be preserved for a period sufficient time to permit a comprehensive examination to be made to make certain that the tank is sound enough and discloses no leakages or excess distortion.

The storage container will after that be cleaned on the outside area and also supplied with rust preventing guide prior to utilizing 2No.

The storage tank is going to be provided with the following:-

(I) 450mm bolted examination covers with liquid and vapour limited joint made out of a gasket of gas immune materials.
ii) 1No. Solenoid valve
– – The selection of British need as well as similarly kind of storage tank

The container is going to be mounted using a 25mm reduction in the direction of their water drain-off touching element. The distribution outlet is going to be raised within the container to stay clear of availability of water at the distribution line. The major service provider will certainly develop container assistances and also bund wall surface areas to information illustrations generated by the sub-contractor. A valued drain away from one of the most cost effective part of the container will be supplied complete with tail pipe and likewise a specification for tube pipeline connection. It will be set up complete with all of the needed pipelines installations and devices.

1.1.9 DAILY SERVICE CONTAINER

A day-to-day storage tank of miniature capability 1,800 Litres will be positioned at 2.5 metre high degree in the heater space. Storage tank is going to be made from 6mm thick pushed steel plates of 1220mm x 1220mm black light steel sheet, complete with bolted cover and also adequate venting. The storage container will certainly satisfy BS 799 part 5 1995 in addition to be supplied with a materials watch tube. The container will probably be garnished with 50mm thick fibre glass insulation of 0.4 W/m2 thermal conductivity as well as also finished with 20SWG galvanized sheets cladding.

The container will certainly be examined for any type of sort of escapes of which if any kind of kind of depends upon will certainly be made great prior to the container is painted on the surface with rust preventing paint. Storage tank has to be securely bolted.

1.1.10 AUXILLIARY TOOLS

All pipework made use of at the petroleum storage area systems will be to B.S. 1387 heavy grade. Joints shall be screwed, and also adequate unions ought to be provided to permit basic removing the gear.

A 25mm size fire shutoff of this rapid activity bar conducted dead weight kind is going to be set up, in the petroleum blood flow line. This will certainly be stored at the work opportunity by a light scale steel cable linked to a fusible web link. The fusible link is going to be positioned directly over the heater. The relaxing heater oil feed from the top level day container is going to be heated through an electrical mapping tape effectively twisted around the pipeline. The pipe shall then be shielded using 25mm thick fiber glass insulation as well as completed with scale 22swg galvanized steel sheet.

The distribution pipeline from the mass oil tank into the high level day has actually been set up by others nonetheless the tenderer shall enable web link to the top level day container. The tenderer will additionally supply and additionally set up high capability filters across the supply pipe as well as the heater feed pipeline.

1.1.11 PIPE SUPPORTS

The array and type of assistances will be kept to a minimum as well as also their style will be such as to advertise review together with safe handling to match concrete stonework or timber. When creating aids to the maintenance of favored pipeline reduction as well as the restraining of pipeline moves to a longitudinal axial directions only,

Consideration will be used.

The sub-contractor shall provide and setup all steel work creating a part of pipeline support settings up and also will certainly be in charge of earning good any sort of sort of problems to service providers operate connected with builders function installment.

Pipe runs will certainly be secured by clips attached to pipeline hangers, wall surface dental hygiene or trapeze kind maintains.

The sub-contractor will ship his entire proposal for the pipeline supports into the Engineer for authorization before any kind of erection job starts.

1.1.12 ELECTRICAL WORKS

All circuitry between things, plant in addition to controls will be implemented from the tenderer. The tenderer shall provide enough guidance to ensure that electrical links are properly created to all products of tools as well as controls offered by himto the Work Manager’s/ Designer’s gratification.

E-6

1.1.13 BURNER SCREENING as well as COMMISSIONING

The tenderer will certainly check and also appoint the burner at the existence of this Engineer.The tenderer will certainly additionally offer adequate oil to last a minimum of two (2) hours. The tenderer shall commission the burner as well as test in the existence of the Designer and additionally validate that the burner is functioning in accordance with the specifications set here-in and in the brochures together with guidebooks in the suppliers of that incinerator.The burner efficacy examination will be done in conformity into BS3316: part 4:1987. Need to any sort of issue be recognized, it will certainly be corrected along with the testing process replicated into the Job Supervisor’s gratification.

1.1.14 FIRE INSTRUCTIONS ALERT

Continue and also acquire and similarly place as listed below;

Publish fire instructions on the Perspex plate, 3mm close White Colour.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
Photo-electric cells

two collections of functioning as well as maintenance handbooks (both for the incinerator in addition to heaters) need to similarly be supplied. This include 2 collections of control schematic depictions for all of the controls and also circuitry.

1.1.7 MASS OIL STORAGE TANK

The bulk oil storage tank nominal capacity of 10,200 litres and additionally complying with BS 799 component 5: 1975 will likely be put on 3 concrete cradles.

The functions will include supply, distribution, placing together, erection, testing, commissioning and planning to function. The container is to be of bound light steel type with a structure anxiety of 40KN/m2 as well as storage area temperature of 240 C. It is to be found beside the burner as well as central heating boiler home.

The container shall be round with dished end as well as be created of 6mm thick cube small steel plates according to BS 1966. Best premium galvanized materials won’t be used.Welded construction elements shall be sprayed.

E-4

The tank will certainly be pressure examined with a general mind of water or fitting, assessed from the bottom of the container, as well as also equal to 1 1/2 times the amount of:

(I) The elevation of this container and likewise
– – Day of examination. – Optimum allowed working anxiety.
( iv) 50mm dimension evaluating connection with lockable cap.
Complete with anti-siphoning device.

these details shall be entirely and additionally simply indicated on the container around the.
( iii) 65mm size filling up pipe with tube combining link
Properly corrected stick (of dip tape) and get into ladder into the peak of the storage tank.

The packing pipe shall be enlarged within the container to within 150mm of storage tank base,.

A flue smokeshaft, 15,000 mm extensive and also 560mm size is going to be assembled from steel sheet, complete with lagging, damper and water shield cone.

The damper will definitely deal with the close of the door to not less than 85%. The heap is to let fresh air at the supply’s base to ensure that the flue gases are found at stagnate afterwards 4000 C which the discharge suits the British Clean Air Act, the National Setting Management Agency (NEMA) Act or several other critical acts.

1.1.4 POWER SUPPLY

The sub-contractor will certainly provide tools which appropriate for operating a 415V, 3 point, 50HZ or 240V, lone stage, 50HZ electrical power supply.

1.1.5 OIL STORAGE AND ALSO LIKEWISE SUPPLY

The machine will include a mass oil storage tank, daily storage tank, and move hand gas pump as well as additionally connected pipe job. Oil in the mass tank is going to be provided to a high degree daily storage tank located in the heater space using a transport hand pump as well as automatic electrical pump.

1.1.6 SAVES AND ALSO LIKEWISE GUIDEBOOKS

The tenderer is to submit with his tender a listing of proposed initial supply of spares with their costs. Part from the furnace spares explained right here under, the spares rates should not be included generally wrap-up of costs routine yet is to be independent and are revealed to be ordered later on if and also when it ends up being necessary as well as functional to the client. The heating system averts whose costs are to be contained generally summary of expenditures schedule (BQ) are:-

I) 1No. Develop of security and security controls
Centre line close to the electrical outlet connection. |{
(adsbygoogle = window.adsbygoogle || []).push({});|}
( ii) 75mm (3″″) port socket screwed B-SP as well as pipeline at the end of the storage tank having an unloading device to avoid the rise in storage area tank strain over the design strain and anxiety. The air compressor pipe shall be empty of bends and will have a continual increase while being as quick as problem-free.
– – Day of examination. – Optimum allowed working anxiety.
( iv) 50mm dimension evaluating connection with lockable cap.
– – Manufacturer’s title of occupation mark.

A flue smokeshaft, 15,000 mm extensive and also 560mm size is going to be assembled from steel sheet, complete with lagging, damper and water shield cone.

The damper will definitely deal with the close of the door to not less than 85%. The heap is to let fresh air at the supply’s base to ensure that the flue gases are found at stagnate afterwards 4000 C which the discharge suits the British Clean Air Act, the National Setting Management Agency (NEMA) Act or several other critical acts.

1.1.4 POWER SUPPLY


PLC Control Incinerator


Product Description

Nanjing Clover Medical Technology Co., Ltd..

Item Customer Request Example
Application Scope  
 
 
 
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc
What kind of waste?  
____, _____%
____, _____%
____, _____%
 
 
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent
if for animal/pet, indicate animal size like: cat, dog, cattle, etc
Quantity Request    
01.02.03^…unit
 
Budget    
$US Dollar.
 
 
Operating Time    
The staff work Hours per day.
Our incinerator can work up to around 18 hours per day.
Realization Date of project In ___ year  
Waste Output Capacity per Day?  
 
1000kgs Per Day^
Request waste burn rate   Capacity: 100kgs Per hour^
Request waste feed capacity   Capacity: 100kgs per feed^
Whether Natural Gas Supply Local?   Yes or No.
Local Power   If 380V and 220V valid?
Product Installation Destination  
 
Country or City name
DestinationSeaport name?   To check sea freight charge.
 
Customer    
End-Customer, Agent, Government.
 
Method of contract   Tender or Negotiation
Date of Tender limit    
How did you know our company?    
Other request or information  
 
 
 

Key Features:  * All models with Dual combustion room.  *based on sequence * High fever, long life of incinerator.  * Free or minimal installation on site.  * High burn rate, from 10kgs to 500kgs per hourto 6ton per day.  * PLC Control Plane. *based on order  New Design for pet animal cremation enterprise.  * One year guarantee on incinerator and components in stock.

Model YD300 Waste Incinerator Instal at Somalia UN Base”


For UN (United Nations) and AU (African Union) camp at Mogadishu airport. We shipping 02 sets version YD-300 incinerator and shipping in 1×40′ ft high container.

300kgs a hour burning rate incinerator is well enjoyed by marketplace because this version can be medical waste incineration equipment for big hospital and also very great for other solid waste therapy with lowest cost, even if big size creatures can also be pumped to the combustion chamber. The primary combustion chamber volume is 2.4m3, big enough for common dimension critters. For shipping transport, YD-300 could be loaded to 40’ft full container.

Model YD-300
Burning Rate 300 kgs/hour
Feed Capacity 500 kgs
Primary Combustion Chamber 2400 Liters
Secondary Combustion Chamber 1200 Liters
Mix Combustion Chamber Yes
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V/380V
Power 1.48Kw
Fuel Type Diesel Oil/ Natural Gas/LPG
Burner Italy Original
Oil Consumption (Diesel Oil) 26–48.1 kg/hour
Gas Consumption (Natural Gas) 16.1–48.8 m3/hour
Internal Dimensions 220 x 110 x 100cm (primary chamber)
External Dimensions 260 x 220 x 420cm (without chimney)
Temperature Monitor Yes
Oil Tank Capacity(if oil fuel) 500 Liters
Door Opening 90 x 110cm
Chimney Length 10.0 Meters
Chimney Type Stainless Steel
Equipment Gross Weight 8300 kgs
Operation Technical Specifications
Paimary Chamber Temperature 800℃–1000℃
Secondary Chamber Temperature 1000℃-1200℃
Residency Time 2.0 Sec.
Burning Efficiency >98%
Waste Lower Calorific Power 3000Kcal

 

 


Kazakhstan Medical Incinerators


Basic Info.

Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Items Specification
YDC Model YD-10C / YD-20C / YD-30C / YD-50C
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Nanjing Clover Medical Technology Co., Ltd..

Incinerator


Basic Info.

Model NO.:PLC Incinerator
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Nanjing Clover Medical Technology Co., Ltd..

Items Specification
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Key Features:  * All models with Dual combustion room.  * Stainless Steel chimney/stack, long lifetime. *based on sequence * High fever, long lifetime of incinerator.  * Free or minimal installation on site.  * High burn rate, from 10kgs to 500kgs per hourto 6ton per day.  *based on order  New Design for pet animal cremation business.  * One year guarantee on incinerator and parts in stock.

animal crematorium equipment


I also research their product details and find it don’t require fuel and also not require fan

blower but that incinerator can only burn waste with 30%-40% humid. I see if your products can burn waste with 30%-40%

humid without fan blower and more 40% humid require fan (Optional solution) which lead us to kick them out.

I don’t have yet precise information on the project opportunities. I have met with the Environment Minister in

Algeria, among others, and they are presently in the process of preparing bid documents for different installations for

waste incineration for several Cities in Algeria. I have indicated to the Minister and his subordinates that I will

identify key partners interested to bid on these upcoming calls for tenders. The Minister will send me preliminary

documents for these upcoming bids so that I may comment them and make necessary recommendations to optimize bid

results. We are talking here of large projects requiring a capacity of 1 000 tons per day and above of wastes and the

production of electricity.


Procedure Fire Brick Setup at Incinerator Oil and Gas


Basic Info.

Model NO.:price of burner incinerator
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can utilize within this gear?  A: This gear to medical waste, pet creature, Municipal waste, live squander. Prohibit any explosive and radiation substance, liquid waste and gas waste. 

Q: Incinerator Smoke Standard  A: China Government Standard: No. GB18484-2001. 

Q: Remedy capacity  A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour)doesn’t mean any waste material. The animal/pet combustion rate around 2/3 of ordinary power. 

Clover incinerator utilize time daily to 24 hours. Between every feed/combustion time, you will find about 0.5-1 hours cooling time and time to get feeding squander. Actual combustion time daily is around 16 hours. The life of incinerator involving 5-10 year based on utilize. 

Ordinarily, we proposition small laboratory, small clinic use capacity under 20 kgs per hour. If incinerator use in hospital, then please compute the waste output around 2kgs per people every day. If there are 200 sickbed in the hospital, that's imply you need one incinerator capacity around 400kgs every day, change to power per hour is approximately 30-40 kgs per hour. Incinerator medical for practice, incinerator medical waste, incinerator news, incinerator of china manufature, incinerator pharma manufacturer waste, incinerator portable suppliers from china, According the operation time every day, waste material, funding, growth, etc, you can use potential from 30-50 kgs each hour incinerator.  *The best way to compute Animal Cremation Burn Rate: 2/3 of this medical waste. 

Q: Assembly and Testing  A: We provide all documents and incinerators simple to setup and operation. Customer can send people visit our factory to learn installation and operation. Generally, we don’t send engineer to neighborhood website if not request. The dispatch cost is additional based on order. 

Q: Combustion Temperature  A: The very first combustion chamber: 800-1000 centi degree.  The second combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode  A: Default Control mode is common control case. PLC mode based on order and model. 

Q: Operation and maintenance costs  A: Operation cost based on fuel consumption rate and power/staff, etc. 

Annual approximately $500-$1000USD annually maintenance according version, utilize situation. 

One individual can service 02 device incinerators. The staff must have basic electrician comprehension to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know threat of medical waste to safeguard worker self with necessary protection element. 

Q: The Residency time in combustion chamber  A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm