Animal Corpse Incineration Furnace


Basic Info.

Export Markets:Global

Additional Info.

Trademark:clover

Product Description

First, for your medical waste in the hospital, the pyrolytic incinerators is greatest treatment up to now. Pyrolytic technology can kill the virus, pollution control.  Second, for individual body, pet creature, in many countries and areas, we desire to cremation them.

As previously two reason but not only above, we still utilize incinerators. 

the way you are able to discover reasonable incinerator to your local website?  Incinerator isn’t a inexpensive equipment, normally the small scale model's price around $5, 000USD per unit and big scale model's w2e pet, waste anathomics incinerator, waste burner china any gasoline, waste clinic incinerator manufacturers, waste gas incinerator manufacturer, waste incineration, price more than $50, 000USD each unit. Thus, before buy one unit incinerator, you have to make clear following items:  A, burn out what? Incinerator is a incineration gear, function is flame waste. So what kind of waste that you want to treatment?  B, small or big? This according to the waste output every day or the waste volume per feed period, like creature dimensions.  C, fuel? Incinerator use oil or gas fuel, normally, gas fuel is less expensive than oil and also the smoke cleaner than oil gas version. However, some neighborhood website don't have gasoline distribution system.  Along with other tech products, like electricity (220V, 380V), waste feed door kind, incinerator structure, etc..

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Incinerator Calculations for Bunker Capacity


Basic Info.

Model NO.:hospital diesel fuel fired incinerators
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste may utilize within this gear?  A: This gear for medical waste, pet animal, Municipal waste, reside waste. Prohibit any volatile and radiation material, liquid waste and gas waste. 

Q: Incinerator Smoke Standard  A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity  A: Average Ability calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg a hour), not mean any waste material. The animal/pet combustion rate around 2/3 of ordinary capacity. 

Clover incinerator utilize time per day up to 24 hours. Between each feed/combustion time, you will find about 0.5-1 hours cooling time and time to get feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator involving 5-10 year according to utilize. 

Ordinarily, we proposal small laboratory, small clinic use capability under 20 kgs per hour. If incinerator use in hospital, please calculate the waste output around 2kgs per individuals every day. Medical waste furnace, animal waste incinerator manufacturer, domestic incinerator, incinerator installment demonstration, medical incinerator prices, in case there are 200 sickbed in the hospital, that's mean you need 1 incinerator capability around 400kgs every day, change to capacity each hour is approximately 30-40 kgs per hour. According the performance time every day, waste material, funding, growth, etc, you may use capacity from 30-50 kgs each hour incinerator.  *The best way to calculate Animal Cremation Burn Rate: 2/3 of this medical waste. 

Q: Meeting and Testing  A: We provide all files and incinerators simple to setup and functionality. Client can send individuals visit our factory to learn installation and operation. Generally, we don’t send engineer to neighborhood site if not ask. The dispatch cost is extra according to order.  The next combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode  A: Default Control manner is common control case. PLC mode according to model and order. 

Q: Operation and maintenance costs  A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual approximately $500-$1000USD per year maintenance according version, utilize situation. 

One individual can service 02 device incinerators. The team should have fundamental electrician understanding to operate/inspect/maintaince incinerator/burner/blower according to performance user guider, and understand risk of medical waste to safeguard worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items Specification
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Campaigners welcome Heathrow’s Intends to move incinerator


Heathrow Airport has announced plans to move an incinerator from Stanwell and make a 15 mile ‘green ring’ around town.

The airport said it shifted its plans after residents raised concerns over its plans to relocate its incinerator to the Bedfont Road area.

A Labour county councillor however has stated it is like moving pieces around a hockey board.

Stanwell and Stanwell Moor councillor Robert Evans stated:”I welcome very much the modifications and that is due to the strain placed on BAA by me and the Labour party.

“But neighborhood resident Andrew McLuskey has done all of the hard work.

“But in saying that, we’re still fighting away to stop growth happening at Heathrow whatsoever.

“There are still serious reservations and I do not believe an expansion of the airport is ideal for the area or the entire country.

“We are talking semantics here it’s a large growth in a very cramped area. It is like moving pieces around a chess board — whatever we do not like about Stanwell will be equally as massive someplace else.”

Changes to the programs include introducing a 15 mile’green corridor’ which will increase the amount of recreational space between town and a new car park south to the airport — which has also been reduced in size.

A new park and an all-weather sports pitch has been mooted for the area, as well as the potential construction of’balancing ponds’ to help restrain the launch of floodwater.

Roberto Tambini, chief executive of Spelthorne Borough Council, stated:”We are delighted that Heathrow has listened to and acted upon our own opinions in creating its updated expansion plans and that the residents of Spelthorne are provided a better deal as a outcome.

“I am certain that we can work together and that Heathrow will continue to listen to Spelthorne residents and demonstrate a flexible approach to prospective proposals.”

Some of those 16 billion of private money being spent will also be utilised to support the Environment Agency in creating flood prevention strategies to protect homes and land in the surrounding areas.

The airport has also announced plans to finance a new bypass to replace the existing A3044 in Colnbrook and Poyle to alleviate congestion difficulties.

John Holland-Kaye, chief executive of Heathrow stated:”The growth of Heathrow can bring significant benefits for local people as well as the UK economy.

“Along with bringing 50,000 new jobs and 10,000 apprenticeships, we can also improve the ecological landscape around the airport and mitigate some of today’s issues including road congestion and flooding. We continue to improve our strategies depending on the comments we receive.”

The Airports Commission is currently analyzing the situation for growth of Heathrow or Gatwick.


infectious waste pyrolysis machine chinalarge animal incinerators


Major components are – Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone ,LPG

quote for incinerators for industrial chemical wastes treatment,

1 burning rate must be Average 30kgs/h
2 inside of chamber material must be refractory concrete cement
3 it works in three system diesel oil/ Natural gas or LPG
4 voltage must be 220V

5 inside temperature first must be 1000c  and second must be 1200c
6 pipe length must be 20 M

Our requirements are  for 125 kg/hr and 42 kg/hr, please send quote with catalog for both options
We are currently dealing in Defense Related Equipment, Construction Assistance and Medical Equipment, Modular Solutions

for Hospitals, Waste Management System, CSSD, Hospital Furniture and Services. We are based in the Capital city of

Pakistan i.e. Islamabad ,where there are all the head offices of Military and Govt. institutions. We have the capacity to

Participate in tenders and we also have a strong network of energetic/active dealers and sales staff in Pakistan and

Afghanistan.
5 incinerator 15 kg the specifications High temperature incinerator​99% combustion efficiency Temperature up to 1200°C or

Smoke and smell free Excellent heat retention Electric powered​ Fast heatup times Temperature Up to 1200°C or as required

Capacity​15 Kg Burning Efficiency 98% Noise- <78db Power – Electric Chamber​Single / Dual chamber Safety Alarm Emergency

vent Monitoring device​ Air Pollution Control Device​ CE and ISO Certified

I ‘d like to ask you about a power plant by burning waste. We have many of camps for displaced people in Syria, and we

want to buy a plant to generate electricity by municipal waste incineration Please send me an offer or any details.


Solid Waste Processing


Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Nanjing Clover Medical Technology Co., Ltd..

Key Characteristics: 

* All models with Dual combustion chamber.  * High temperature, long life of incinerator.  * Free or minimum installation on site.  * High burn rate, from batch loading incinerator, batch load waste incinerator, batch loading incinerator, up to 10ton per day.  * PLC Control Plane for Intelligent operation.  * New Design for pet animal batch power load, best mobile incinerator design, large capacity incinerator, 10kgs to 600kgs per hour, cremation enterprise.  * One year guarantee on incinerator and parts in stock.  *Detail Specificaton based on order.

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

incinerators china


All numbering will be carried out in compliance with the corresponding circuit diagrams and wiring list.

 

Component Marking

 

 

 

 

All components inside the switchboard shall be marked for identification.

 

 

 

 

The  marking  shall  be  effected  by  material  resistant  to  the  prevailing  environment conditions.

 

 

 

 

All  marking  shall  be  in  English  and  be  in  compliance  with  the  corresponding  circuit diagrams

 

 

 

 

Labels

 

 

 

 

The switchboard shall be provided with all necessary labels for control and understanding of the system.

 

 

 

 

The labels on the exterior of the switchboard shall be engraved PVC and fixed to the board surface by means of screws

or plastic rivets. The text shall be in black and the background shall be white.


England’s Garbage generating Danish heat


“They save having to bury the waste plus we save the usage of natural gas,” he said.

READ MORE: Denmark pays electricity

Environmental protection agency Miljøstyrelsen said that year up to 200,000 tonnes of non-hazardous waste from England was incinerated in Denmark — nearly half percent of the entire quantity of combustible material used.
The incinerator in Frederikshavn has dropped its imports of the English squander in the past year.

Incinerators in Aalborg and Hjørring will also be burning British trash.

“The heating we produce with the waste is more affordable than that which we can create with gas,” said AVØ head Tore Vedelsdal. “And the British are curious since they lack incinerators and pay hefty taxes .”

Good for the environment
The custom is being called an economic and environmental boon on both sides of the equation.

The AVØ incinerator in Frederikshavn produces heating and power to the region by burning crap from England.

“It is mainly construction waste such as bits of wood, plastic and cardboard from Manchester,” AVØ operations manager Orla Frederiksen told DR Nyheder. “I guess we’ve 600 tonnes here which provide a good combustible mixture we can then turn into district heating and power.”

Good for the bottom line

Environmental protection agency Miljøstyrelsen said that last year up to 200,000 tonnes of non-hazardous waste from England was incinerated in Denmark – nearly six percent of the total volume of combustible material used.

by: http://cphpost.dk/news/englands-trash-generating-danish-heat.11398.html


Automated PLC controller heater plant with Double heat heaters as Well as twin Room HICLOVER YD-30C with Damp Scrubber


2020-06-28

Thing

Needs

Design

YD-30C

Key Product Listing

Key Burning Chamber( Main body stainless-steel)

Additional Burning Chamber( Key body stainless steel)

Mix-Combustion Chamber

Wet Scrubber( Laundering Tower)( Text stainless-steel)

Heater Control Circumstance

Smokeshaft:5.0 Meters

*( upgrade to Stainless-steel, complimentary expense)

Italy burner: 02 collections


HICLOVER – Medical Environmental 

Oil Storage Container (if petroleum gas): 100Liters


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

Automatic PLC control incinerator plant using Twin cozy burners in Addition to twin chamber. Suitable for squander of health and wellness centers Variety of burner 2 Nos Voltage 380V 50Hz Functional enjoinment 5 C 60 C Wetness 10 C 90%

Gas kind Natural gas Selection of room 02 Nos