Infectious Waste Incinerator


Product Description

Principle of the Incinerator Gear is incineration/combustion/burn.

The main body is 1 combustion chamber (at least), Refractory lineup or firebrick, Insulation materials and the outer plate. Ignition component is external oil or gas burner. The burner may be operating until waste burnout but for some waste such as plastic, newspaper (sometime, mix coal with waste before feeding), they could combustion itself after Ignition. During gas, burner includes a buff small incinerator price, little incinerator lab, little incinerator producer, incinerator medical waste, little incinerator cost in china, little incinerator main chamber secondary, itself for Oxygen supply and also protect burner avoid heat damage from combustion chamber. The Exhaust gas blow out after combustion.  The secondary burner burn the Exhaust gas from main combustion chamber, this technology ensure sufficient combustion, couple black smoke and odor. 

The updated incinerator technology focus on Exhaust gas treatment to get rid of Hazardous material and other purpose from incinerator, such as heat recovery (waste to energy), save fuel price, PLC Automation performance. 

In some Developed countries, some new waste treatment method such as High-temperature cooking, waste carbonization, crushing sterilization technology is instead of incineration technology.

Item Customer Request Example
Application Scope  
 
 
 
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc
What kind of waste?  
____, _____%
____, _____%
____, _____%
 
 
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent
if for animal/pet, indicate animal size like: cat, dog, cattle, etc
Quantity Request    
01.02.03^…unit
 
Budget    
$US Dollar.
 
 
Operating Time    
The staff work Hours per day.
Our incinerator can work up to around 18 hours per day.
Realization Date of project In ___ year  
Waste Output Capacity per Day?  
 
1000kgs Per Day^
Request waste burn rate   Capacity: 100kgs Per hour^
Request waste feed capacity   Capacity: 100kgs per feed^
Whether Natural Gas Supply Local?   Yes or No.
Local Power   If 380V and 220V valid?
Product Installation Destination  
 
Country or City name
DestinationSeaport name?   To check sea freight charge.
 
Customer    
End-Customer, Agent, Government.
 
Method of contract   Tender or Negotiation
Date of Tender limit    
How did you know our company?    
Other request or information  
 
 
 

Pet Dog Animal Crematory Incineration



Incineration is the most obvious solution for total destruction of municipal waste, avoiding 

all the direct and indirect risks associated with other disposal methods.
Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the 
same place where it was generated to avoid cross-contamination risk and to keep waste treatment costs at acceptable level.

※ Main Feature:–– 3 Burning Chambers or A/B Main Burning Chamber— — Dual or Three Italy Heater–– Burning Rate: 80-800kgs per hour–– Burning Chamber: 1.0M3-10.0 M3 ※ Optional Function/Parts/Material/ Burning Price: — — Stainless Steel Smokeshaft — — Dry Smoke Filter Chamber— — Smokeshaft Elevation Customized Made— — Semi-Automatic Waste Feeding— — 3-Section Damp Scrubber System— — Movable Platform Feeding Door— — Added Burner

— Upgrade/Downgrade Burning Rate
WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

Tel: +86 -25 -8461 0201

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

System purpose Infected clinical waste decontaminationUnit made from stainless steel NecessaryDecontamination process is performed in a shut system NecessaryWaste shredding within sterilization process NecessaryDecontamination technique 1No pressure; 2Moisture and also heat.Microbiological purification degree At least 6 log10Sterilization cycle temperature At the very least 1400CThe sanitation cycle time Not a lot more than 40 min.One cycle treated waste volume At the very least 100 litrųOne cycle cured waste weight At least 7 kgDecontaminated waste has to be 1Dry,2 Odorless,3 Not identifiableThe waste quantity reduction after treatment At least 70% The waste weight reduction after therapy At the very least 30 % System control MicroprocessorControl panel Digital with touch screenNoise level At least 80 dBPower consumption Not extra than 0,5 kWh/kgWater consumption Not more than 0,003 m3/kgFiltering system 1At least two-stage carbon filters; 2HEPA filter.HEPA performance At least 95% Device ability At the very least 15 kg/hr. Impact on the environment and employees Safe, environmentally friendlyDimensions ( for specific space) 90 size ( ± 10 ) x 150 deepness ( ± 10 ) x120 elevation ( ± 10)



Cremation Furnace Used for Pets


Product Description

Nanjing Clover Medical Technology Co., Ltd..

A Model animal crematory burning speed from 20-400kgs per hour. Heavy duty combustion room and match for large animal cremation. 

Secondary Chamber & Mix-Combustion Chamber. Residency time 2.0 sec. In place combustion chamber. Practically smoke and odor free. 

Smoke Filter Chamber with filter Virtually smoke and odor free after burningoff.

Italy original oil or gas burner, quality dependable. It suit for petrol oil, natural gas, LPG gas. 

Items Specification
 Model A360 / A600 / A900 / A1200 / A1500 / A2400 / A4000 / A5500
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

User guider, full installation and operation document for client.

burner suppliers



incinerator providers.7) Burn cost: 15 – – – – 20 Kg/h 8) Ability: very little less than 130 L.
9) Concentrations of numerous contaminants in heap gases listed below discovery limitations.
10) Gasoline.
11) Electronic system control.
12) Easy to run and also really little training.
13) Any kind of type of tool or devoted gadget called for to the appropriate performance and additionally use of the tools included.Incinerator clinical waste diesel, building and construction in painted steel light weight aluminum resistant to heats up, device control

indication flame, reload indicator, temperature level control gadget, dropping ability of 250kg/ 10 humans resources in 2 stages

(key video camera as well as extra digital video camera). One heater to be set up in an university hospital of 440 architectural beds as well as 375 management beds. This heating unit needs to have the ability to lose from 180 to 220 kilo daily of clinical waste and all-natural waste.
2. One heating unit to melt run out drug that can incinerate around 500 kg of medications or around 4,000 kg of gone out medication per day.a biology research laboratory takes advantage of an average of 2 000 rats every year as well as likewise we intend to have a tool to blaze and likewise remain free from positioning them in the landfill.-Muhimbili National University hospital.
– – Kigoma Regional Health Center.
– – Ndanda Objective University Hospital.
– – Musoma Regional Health Center.
– – Mnazi Mmoja Medical Facility in Zanzibar. waste Burner that can be set up in a truck and likewise mosts likely to numerous cities to blaze Community Solid Waste, shows all type of waste, plastic, organic.an industrial incinerator to 1000 pounds per hr, for natural substratum along with waste,.
he wants to understand advantages of each heater.
as well as usage: gas or diesel, rates as well as averages separately,.
He desires a furnace (economizer) for water 60 ° C, and to understand the required water blood circulation. presure in advance 500 mts and into in 3 kg/cm2 vessel.ACL Health care center, Abuja (Nigeria)

Mmedical waste burner with the ability of getting rid of as much as 0.25 cubic meter of pathological or contagious waste.



incinerator manufacturer china


The sludge shall be properly atomized by means of compressed air in the burner so as to ensure complete combustion of

the sludge.

 

 

An air compressor complete with a receiver shall be included in the incinerator. Both compressor and receiver shall be

mounted on the same skid as the incinerator.

 

 

The incinerator shall also provide digital mimic window for monitoring of the feed rate of the sludge pumps as well as

the feed rate of DO being used. Digital monitoring of the flue gas temperature shall also be provided. The digital

display shall be able to display alarms and faults. It shall be equipped with appropriate control keys that allow

scrolling in the alarms, changing set points, viewing data, acknowledging and resetting of the alarms and faults.

 

 

An exhaust stack shall be provided which shall discharge its flue to the atmosphere. The stack shall be at least 15 m

high and shall be fit to operate in marine and corrosive environments. The offered stack shall be of heavy duty design,

inclusive of flexible compensators, bellows, transition piece and shall be designed to withstand highly corrosive

environment, high cyclic stresses and capable of resisting cyclonic gusts of at least 280 km/hour.

 

 

The incinerator body shall be of dual casing type, that is, air cooled. The incinerator shall also operate on a

negative draught that is maintained by means of an ejector so as to prevent gases and smoke from leaking to the

surrounding area. Air for combustion shall be supplied in excess so as to enable complete combustion of sludge.


Capability of destruction in weight 60 Kg/h


* A switch breaker for every engine (ventilators and burners).
* Heater with gas, mono-bloc casting directing form with flat flame, lighting as well as security of electronic

ignition, longterm air leak, electromagnetic sluice entry of regulation and isolating valve.
* A timer with flexible temporization for the regulation of every burner.
– Refractory concrete:
.
. Nature: 42% of Al203.
9. The incineration has to be totally devoid of visible smoke in addition to offensive odours.
24.
23. Ability to deal with Plastic: Not less than 40% by weight.
10. The reduced volt electricity (L.C.P) of the waste will be 3,500 kcal/kg
8. It should be able to hold exhaust at the 2nd melt with gas house of not less than 2 seconds.
* A tool of injection of air permitting a general re-combustion of gases.
This burner with “PYROLYTIC” burning ought to have:.
* Carcass in solid sheet steel with support of connection.
2. What about the warm created throughout burning, are there windows or air circulation right into the containers.

–– Intake of power and additionally gas. Medical facility garbage disposal system for a health facility job

–– Ash removal odor.The burner is for CONTAMINATED MATERIALS and SOLID WASTE along with marginal carbon release.

–– Automatic treating procedure temperature regulated chamber.Incinerator with 150l waste room

–– Second room.

1. Do you have plans for over incinerators revealing flooring measurements, height. What goods should be used for your FLOOT, WALLS, ROOFING SYSTEM ETC. 1) The sole consumable needed for the system TS100

(PLC) is Oil( diesel) is that OKAY?

two ) from your technological requirements: petroleum intake (Kg/hour) is between 14–– 28) would you indicate is liters/hour?

example the incinerator will be working for 10 hours each day indicates that the oil use will be 140 Litres or more?

3) Chimney type stainless steel. Just how around main body building and construction materials?if you will find a whole lot more two choice of text

building and construction materials for much better life

3. Send out information regarding electric power, ventilation, fire security, wears down, chimney etc

4. Do you have erected shelters?Installation of waste disposal system (biomedical) 500kg ability layout, MP 500

clinical incinerator. We see you have container shelters. Send us appreciate quote for this thing

1. Ability of harm in weight: 60 Kg/h.
24. The provider will perform an onsite installment of the incinerator.
23.
2. It must have the ability to operate not less than 10 hours/day
* A sheath of release of these gases scorched.
* The insulating material of the burning chamber should be made up of refractory bricks, using a high content of aluminium

and insulates bricks in order to make sure a minimum temperature on the outside sheet metal.
12. The Volume of the burning room: 1.200 L.
* A regulator with electronic watching for the warmth of burning.
– – Assumption: general medical facility beds 50 percent, operation beds 50 percent to the 100 bed health centre position, while this

ratio is 30-70% for the other Circumstances
19. A control box making sure the entire cycle of burningoff. Follower:.
7. It has to be able to reduce the quantity of wastes by 98%.
– The Temperature levels of burning: Minimum will be 850oC in Addition to max 1400oC
* A heater of lighting which the use is restricted to the ignition of waste.
* A reduction of burning of gases,.
23. The mounted incinerator should birth a 1 year warranty.
* Flawlessly tight doorway to the hand-operated loading of waste. The loading ought to be Guidebook, Establish Tons.
15. Fuel: gas.
22. Process Filtering system: Scrubber to be stated as optional.
11. The Internal diameter of the Smokeshaft: Ø 400 and its altitude: 8 m.
5. ” PYROLYTIC” burning, by regulating the gasification of waste.

clinical waste incinerator solutions as well as prices for 100 mattress / 500 mattress / 1000 mattress / 3000 bed health facilities.
From the mill; it will consist of medicinal and preventive upkeep, and utilizing device, etc

following the control of the automated cycle.
17. A burning chamber of waste:.
* Make-up of the refractory;.
Would certainly it be feasible to give us information on the ability of burner we require

on this island.

–– Around 150 KG/Hrs. Burner to dispose our daily regular death with this size of the ranch.1. Can the

100kg/hr melt solid waste/hazardous waste such as expired paints, waste oil or compounds.
–– global standards and waste productions assumptions should apply
Nature: Magnesium.
– – fragments that can be easily arranged
* A regulatory authority with watch for the warmth of website post combustion.
4. Layout Requirements: Forms A, B, C, vitamin D, in Addition to E of clinical waste
21. Controls as well as coverages:.
* Electric box. The de- ashing needs to be completed at all-time low of the burning chamber or the deashing ought to be Automatic or hands-on

put de ashing.
Natural rubber, synthetic rubber, polyurethane sheet, and awkward movies, solids and
INCINERATOR, DIESEL.

Amount: 2 [two ] with total accessories.
* A secondary shot of air to ensure excellent oxygen web content.
– Protect in fibrous panel:.
3. This incinerator should be able to destruct all combustible wastes created by medical facilities, exclusive facilities,

labs, institutes, etc..
* Frontage of loading with door seals gone on hinges, wheel of screw plug, elastic joint, as well as packing protecting

from refractory.
13. The Measurement of the doorway for packing in centimeters: 70×× 70.
22. The provider must give batches of spare components of first urgency as well as consumable of the burner.
6. The incinerator must stay alert to the launch of black smoke as well as fine dust, (Electric) through the loadings.
25. The technological training of drivers will certainly have to be offered and provided by a professional.
* Burner of lights of waste, with gas, regular mono-bloc casting directing diving fire, lights and security of

electronic ignition, irreversible air flow, electro-magnetic sluice gate of law as well as separating shutoff.
– – Chemical waste solids along with liquids, waste petroleum and also various other difficult-to-handle things

The apparatus will definitely be licensed for performance from PME after departure website investigations.Manual tons double room

burner for clinical waste to melt 50kg/hr on constant process, with Main temperature amount approximately

800degC minimum and 1200degC or more in the Additional room, complete of charging doorway, Ash doorway, Air as well as check out

ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition device, the entire to

meet NEMA needs as well as various other worldwide requirements. Здравствуйте! Ж

ду ответа. Стоимость и доставка до г.Алматы Казахстан

The technical details we respect are:

–– Ability (burning capability of waste per hr). 150kg/hour. Burner with 300l waste room

–– Construct goods, 5mm Excellent excellent light steel structure; 100 mm excellent quality refractory lining.

–– High Temperature paint finish.we have 2 hospitals, more after that 20 dentist offices, and additionally over 50 physician offices.
14. Heater procedure ought to be Automatic On/Off.

out of refractory.
* The insulation of the burning chamber ought to be made up of refractory bricks, having a high content of aluminium

and also insulates bricks in order to ensure a minimum temperature on the outdoors sheet metal.
* Make-up of the refractory;.
– Refractory concrete:
. Density: ≥ 100 mm
. Nature: 42% of Al203.
– Shield in fibrous panels:
. Thickness: ≥ 75 mm.
– Nature: Calcium silicate.
* Burner of lights of waste, with fuel, standard mono-bloc casting directing diving flame, lights and security of

digital ignition, irreversible air flow, electro-magnetic sluice gate of law as well as separating shutoff.
* Plate of combustion in Carborundum, staying clear of the dealing with of glass and slags.

18. A chamber of article burning of gases.
* A burner of burning of gases,.
* A tool of injection of air permitting an overall re-combustion of gases,.
* A gadget of air inlet of air conditioning of waste gases,.
* A sheath of discharge of the gases scorched.
* Carcass in strong sheet steel with support of link.
* Composition of the refractory;.
– Refractory concrete:.
Thickness: ≥ 150 mm.
Nature: 65% of Al203.
– Protect in fibrous panel:.
Thickness: ≥ 85 mm.
Nature: Calcium.
* Heater with gas, mono-bloc casting guiding type with horizontal flame, lighting as well as safety of digital

ignition, long-term air flow, electromagnetic sluice entrance of regulation and isolating valve.
* A secondary injection of air to guarantee excellent oxygen web content.
19. A control box making certain the total cycle of burning.

20. Follower:.
* Electro-ventilator distributing the secondary air, the policy of the air circulation being executed by valves and also

following the control of the automatic cycle.
21. Controls as well as policies:.
Control box watertight to dirt, consisting of:

* A switch breaker for every engine (ventilators and also burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of burning.
* A regulatory authority with watch for the temperature of blog post combustion.
* Electric box.

21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on

set de ashing.
22. Process Filtering system: Scrubber to be stated as optional.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
23. Ability to treat Plastic: Not much less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
22. The provider has to give batches of spare parts of first urgency as well as consumable of the burner.
23. The mounted incinerator should birth a one year warranty.
24. The provider will perform an onsite installment of the incinerator.
25. The technological training of drivers will certainly have to be offered and also provided by a professional.
from the factory; it will consist of medicinal and also preventive upkeep, and using device, etc


Medical Waste Incinerator


Basic Info.

Model NO.:medical waste incinerators china
Export Markets:Global

Product Description

A Model creature crematory burning rate from 20-400kgs a hour. Heavy duty combustion room and match for big animal cremation. 

Secondary Chamber & Mix-Combustion Chamber. In place combustion chamber. Virtually smoke and smell free. 

Smoke Filter Chamber with filter brick, Virtually smoke and smell free after burningoff.

Italy original oil or gas burner, quality dependable. It suit for diesel oil, natural gas, LPG gas. 

User guider, complete installation and operation document for client.

Items/Model A1500 A2400 A4000 A5500
Burning Rate *animal 90 kgs/Hr. 150 kgs/Hr. 200 kgs/Hr. 400 kgs/Hr.
Feed Capacity *animal 120 kgs 200 kgs 300 kgs 500 kgs
Equipment Weight 7000 kgs 8300 kgs 13000 kgs 16500 kgs
Picture  
Primary Chamber (Liters) 1500 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 240x170x380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 150x100x96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 500 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Medical Incinerator (TS20 PLC)


Basic Info.

Model NO.:TS20 PLC
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER
Packing:Full Container
Standard:20 kg per hour
Origin:China
Production Capacity:1000 Sets Per Year

Product Description

TS model PLC incinerator is latest layout for waste treatment, include health care waste, animal cremation and other solid waste. This gear quality structural for types of site, small capacity incinerator,small home incinerator,small home incinerators,small hospital incinerator prices,small incinerator delers in ernakulam,such as hospital, environmental department, animal cremation agencies, etc.. CLOVER Incinerator provide updated models with double combustion chamber and smoke filter chamber using refractory lines, along with the combustion chamber temperature up to 1200 deg C.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg
Control Mode PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm
Chimney 3Meter 3Meter 5Meter 5Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 degree 800–1000 degree 800–1000 degree 800–1000 degree
2nd. Chamber Temperature 1000-1200 degree 1000-1200 degree 1000-1200 degree 1000-1200 degree
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm