Category Archives: incinerator-uae
Incinerator in 100 to 500kg Feb Hour
Basic Info.
Product Description
Key Attributes: * All models with Dual combustion chamber. * Stainless Steel chimney/stack, long life. *based on order * High temperature, long life of incinerator. * Free or minimal installation onsite. * High burn rate, from 10kgs to 500kgs per hour, up to 6ton daily. *based on order * New Design for pet animal cremation business. * One year guarantee on incinerator and components in stock.
TS version PLC incinerator is latest design for waste treatment, include medical waste, animal cremation and other solid waste. This gear quality structural for kinds of site, such as hospital, environmental department, high temperature incineration, hog incinerators available, house incinerator design, house incinerator medical waste, house incinerators available, house medication insinerators, animal cremation agencies, etc.. CLOVER Incinerator supply updated models with double combustion chamber and smoke filter chamber with refractory lines, along with the combustion chamber temperature up to 1200 deg C.
Items | Specification | ||||
Model | TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC) | ||||
Main Product List | Double Combustion Chamber | ||||
Smoke Filter Chamber | |||||
PLC Mode Control Case | |||||
Stainless Steel Chimney | |||||
Italy oil/gas burner: 02 units | |||||
Oil Tank (if oil fuel) |
The three incinerators for burning in addition to incineration of medications in addition to harmful compounds
Demands and specs to the practice of supply, installation, performance and ensure the three incinerators for burning and incineration of medications as well as harmful chemicals for customizeds branch
Free 3 years guarantee for incinerators from shipment day. In addition of complimentary extra components guarantee letter needs to be valid for 10 years from the end of assurance.
– All doors must possess unique lock aren’t permitted non-persons delegated to operate.
– The iron fencing has to have a 5 meters Width entrance.
Send your manuals for installation systems.
Please provide details to your complying with,.
Electric apparatus should be delivered with support guidebook in English
Send out a person to fix as well as educate our employees for 5 individuals in each area.
Supplies operating as well as emergency scenario maintenance also provides totally free spare parts for 3 in the starting day of the project. The company should make routine upkeep every 3 weeks as well as increase the upkeep report to the administration of public problem and also Care.
– Guarantee that the combustion of materials released from the secondary room has to be at least 2 seconds length as well as the space is lined with high-density ceramic fibbers.
3- Brochures of stove with all the called for specs
The offer cost has to include the following;-.
– heating systems should have certificates are encouraged worldwide ventures and authorities competent for environmental security In the nation of origin or the General Presidency of Meteorology as well as Setting Protection from Saudi Arabia.
– Must have a automatic ignition and petrol is use.
– The floor finishing should be high-quality epoxy paint.
5- Train 5 people for 2 days for each device for a length of 2 days for installation, functionality, and security. Supply certificates.
– The method of feeding the furnace using a side slot or from the top and also the exhaust of the smoke is entirely stopped.
– Incinerators have to have smokeshaft not much less than “4 meters” height in the surface of the oven, also, it ought to be thermally protected and also non-rust able, as well as need to similarly be removable, installment as well as tide default.
– a heating system has the capacity to hold up against acute temperatures as much as “130o c in addition to also, it guarantees continuous procedure of which may be used for 1 day with the capacity to eliminate residues throughout the job of the stove, Protecting coating of calcium have to be present from the chambers with Density not less than 50 mm as well as a wall depth of 100 mm.
The business must make all of the maintenance work also adjustment of the control and defense tools and also filters/ filters detoxify insulation.
Area temperature level sensors.
Files must include all of the information such as pamphlets, technical resources, operating, maintenance guidebooks, as well as pamphlets handling the key-board.
1-Technical explanation includes technological specifications, scope of project, the needs of the process and upkeep.
Two initial costs.
– Automatic anti-rust as well as heat electrical circuit ought to be provided.
– The stove can benefit 24 hr so regarding permit for the burning of materials for a period of not much less than 12 successive hours and the remainder for air conditioning and gives full gas container using a capacity of 1000 L to turn on the oven.
3- Provide certification that the incinerators are environmentally friendly and attach evidence that environmental management businesses in the nation of Origin and also your product must be discharges cost-free as a consequence of the amount of sensitivity of its own worldwide atmosphere vents.
– The remainder of the accessories in most of the tendencies even makes it possible for the employee right feeding as well as maintenance job, cleansing and relocate handily thinking about the propensities of the base to the door for water drainage of water.
– a heating system Have to get two spaces, one of them is the main space of not much less compared to “5” ranges to the practice of burning materials and several other secondary region of not much less “2” ovens to shed resulting gas in the first process as well as the smokeshaft.
– Incinerators have to be fitted with a control board of the digital tricks to monitor all the vital indicators of activation tricks, as well as start-up and switch off so as to be separated inside a steel box together with the existence of the following:.
– Burners must possess the capacity of self-cooling after conclusion of the daily operating period.
– The dimensions of the base are increased by (2 meters) in the medial side of burners.
GARANTEE.
Validity of deal ought to be not less than 6 weeks
– All devices should be very immune to outside conditions like high temperature (50oc).
1. Asking for professionals and drivers for a period not less than two times at each website and give trainees training certifications.
In situation of sequence, we need two certificates of origin That Has to be stamped from Saudi consular office on your nation
– The heating systems are very effective, emissions-free, risk-free, and environmentally friendly as well as have capacity of not less than 3,000 kg of materials as well as the purchase price of melting at 400 kg/ h.
Two – Technical explanation for support technicians training and heater drivers.
– Isolation of shedding region: the place between the walls must be of those “stainless-steel”. Furthermore, shed space must complete of Thermal insulation merchandise.
Timer for Extinguish the stove instantly depending on the moment called for.
Provided moment asap
Alarm system Sensor at the event of (mishaps “heater” or filtration apparatus or heating leakage or interior connections as well as electric wiring).
Indicators for furnaces as well as index overload.
Screens for the warmth level of those rooms.
Aerosols Filter signals / monitors.
– Mount anti-rust and hot Umbrella of brick and also steel (pyramid form) of (5) meters altitude above the ground which setup using the border of the concrete base by columns that are thick .
– Supplying fire extinguisher for each website having an capability of 10 kg at least
Little choice incinerator of falling capacity
Hen Burner – – – – – – – – 400 kgs feed a day.a small scale burner of shedding capability 30kg/hr= 1No. Be aware that it needs to be mobile as this is meant for oil regions service tented camps. It needs to be gas run as our area is remote. 150! Kg per human resources LPG electric burner for use at the global airport terminal. This is a requirement bu the biography security and protection along with security and protection as well as likewise protection that all Worldwide flights require all of rubbish sweltered within an identified time.Required entire lots capability is 150Kg
Chamber – – – – – – – – Primar 900 litres Added: 300Litres
Smoke Filter Chamber: Yes .
Oil Waste Incinerator
Basic Info.
Product Description
Technology Respond(FAQ)
Q: What’s kind of waste may utilize in this equipment? A: This equipment for medical waste, pet animal, Municipal waste, reside squander. Prohibit any volatile and radiation material, liquid gas and waste waste. GB18484-2001.
Q: Remedy capacity A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not indicate any waste material. The animal/pet combustion rate around 2/3 of ordinary power.
Clover incinerator utilize time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time plus time for feeding squander. Incinerator combustion room photo, incinerator crematory, incinerator dealers, incinerator diesel fired, incinerator for medical waste, incinerator for medicial waste, Actual combustion time daily is around 16 hours. The life of incinerator involving 5-10 year based on utilize.
Ordinarily, we proposal small laboratory, small clinic use capability under 20 kgs per hour. If incinerator use in hospital, then please calculate the waste output capacity around 2kgs per individuals every day. If there are 200 sickbed at the hospital, that's mean you need 1 incinerator capability around 400kgs every day, switch to power per hour is approximately 30-40 kgs per hour. According the operation time every day, waste material, funding, development, etc, you may use capacity from 30-50 kgs per hour incinerator. *How to calculate Animal Cremation Burn Rate: 2/3 of this medical waste.
Q: Meeting and Testing A: We supply all documents and incinerators easy to installation and functionality. Client can send individuals visit our factory to learn installation and operation. Generally, We do not send engineer to local website if not request. The dispatch cost is additional based on order.
Q: Combustion Temperature A: The very first combustion chamber: 800-1000 centi level. The second combustion chamber: 1000-1200 centi level.
Q: Incinerator Control Mode A: Default Control manner is common control case. PLC mode based on model and order.
Q: Operation and maintenance costs A: Operation cost based on fuel consumption rate and power/staff, etc.
Annual approximately $500-$1000USD annually maintenance according model, utilize situation.
One individual can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation consumer guider, and know risk of medical waste to protect worker self with necessary protection element.
Q: The Residency period in combustion chamber A: 02 sec.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

Control: Built-in data recording
Operating temperature: Incinerator
/Primary Combustion Chamber
Primary Chamber: 900 – 1200 0C

Type: horizontal/vertical
Temperature: 1200- 1300 oC
Residence time of gases : >2 seconds
Ash Residue: <5% of original waste size
Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash
Flue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacity
Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc
Auxiliary device: Fuel cut-off device
Waste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time
Chimney (Stack):
Type: Vertical type
height:>7 meter’
Material: Fireproof cast, stainless steel
OUTPUT:
GAS- SMOKELESS,ODORLESS
ASH -Max <5% of original waste size
Reduction of Pollutant gas SO2, HCL, HF and line particulate
Emission standard:
WHO/ European
Test report for emission testing provided?
Heat exchange mode: Automatic
Type: Constant loading, Best LoadingCapacity/Burn Speed per hour: 250 -300 kg/hr Substance:External- 3 layers Internal lining: a fire proof Substance of pre-fired refractory bricks Using Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:
Debaye Over Dioxin Emission From Waste Incineration
Basic Info.
Product Description
Items/Model | YD-200 | YD-300 | YD-500 | YD-600 |
Burning Rate (kgs/Hour) | 200 kgs/Hr. | 300 kgs/Hr. | 500 kgs/Hr. | 600 kgs/Hr. |
Feed Capacity (kgs) | 400 kgs | 500 kgs | 800 kgs | 1100 kgs |
Equipment Weight | 7600 kgs | 8300 kgs | 13000 kgs | 16500 kgs |
Primary Chamber (Liters) | 2000 | 2400 | 4000 | 5500 |
Secondary Chamber (Liters) | 500 | 1200 | 1500 | 1500 |
External Dimensions (cm) | 270 x 185 x 380 | 260x220x420 | 320x220x460 | 360 x 220 x 475 |
Internal Dimensions (cm) | 180 x 115 x 96 | 220x110x100 | 257x147x108 | 300 x 147 x 125 |
Oil Tank(Liters) | 300 | 500 | 500 | 500 |
Door Opening (cm) | 59 x 81 | 90 x 110 | 108 x 128 | 108 x 128 |
Chimney (M) | 10 | 10 | 14 | 14 |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Secondary Chamber | YES | YES | YES | YES |
Mix-Combustion Chamber | YES | YES | YES | YES |
Smoke Filter Chamber | YES | YES | YES | YES |
Combustion Fuel | Oil/Gas | Oil/Gas | Oil/Gas | Oil/Gas |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Temperature Monitoring | YES | YES | YES | YES |
Nanjing Clover Medical Technology Co., Ltd..