hog incinerators


The purpose of the start-up burner is to ignite waste materials and to maintain the prescribed minimum

temperature in the primary chamber. It shall be mounted in the lower part of the primary chamber.

 

  1. The start-up burner shall function automatically when:-

 

–      Pre-heating is completed, or after reaching the adjustable minimum temperature in the thermal reactor.

 

–      The temperature in the primary chamber has dropped below the adjustable minimum value (e.g. 300?C). This can

occur when a lot of damp waste material is to be combusted.

 

–     The start-up burner shall be of one-stage burner with pre-ventilation, working on the principle of an oil

atomizer for diesel oil, consisting of:-

 

–      Fan housing with adjustable air intake.

 

–      Air closure damper with actuating drive

 

–      Burner tube with burner connection and insulating flanges

 

–      Burner plate with automatic oil firing sequence control, ignition transformer

 

–      Electric nozzle rod with quick closing gate valve, electrode block, baffle plate.

 

  1. The mounting point of the waste ignition burner shall be fitted with a manually operated sliding closure plate

to protect the burner head when the flame is not in use. The slide plate shall be interlocked with the burner ignition

controls to provide operation of the burner when the slide plate is not in the fully open position.

 

The integral burner air fan shall be wired for continuous running.

 

  1. Reactor Burner

 

The purpose of the reactor burner is to ignite low temperature carbonization gases and to maintain the prescribed

minimum temperature in the thermal reactor at all times but mainly during periods when the energy content of the

carbonization gases is low (pre-heat, post combustion phase). It shall be mounted in the entrance area of the thermal

reactor.

 

The reactor burner shall modulate between partial load and full load and automatically function when:

 

–      The temperature in the thermal reactor drops below the adjustable minimum operating value (e.g. 1000?C) (full

load)


Waste Incineration Therapy Style TS75( PLC).



Average 50-100 kg/hour Burn Rate

Items/Model

TS75( PLC)

Principle

Waste Incineration Therapy

Burn Cost

Average 50-100 kg/hour

Feed Ability

Ordinary 200-300 kg/feeding

Control Mode

PLC( Programmable Reasoning Controller Burner)

Face Oil Paint

800 ℃

Combustion Chamber

768 Liters (0.768 M3)

Inner Measurements

1200x800x800mm

Added Chamber

384 Liters (0.384 M3)

Smoke Filter Chamber

Yes

Feed Setting

Manual

Voltage

210/240V 50Hz 1P

Power

1.3 Kw

Oil Intake (kg/hour)

Typical 20.4( D.O)

Thermal ability( kw/hour)

166-332

Gas Consumption (m3/hour)

***

Temperature Level Degree Monitor

Digital Show

Oil Tank

3000L

Feed Door

60x50cm

Smokeshaft

10Meter

Chimney Kind

Stainless-steel

1st. Chamber Temperature

800 ℃–– – – -1000 ℃

2nd. Chamber Temperature Level Degree

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

7500kg

Outside Dimensions

260x160x250cm( without smokeshaft)

We offer singular burning chamber, dual combustion chambers, 3 burning chambers and multi-combustion

chambers waste incinerators for lab, center, clinical facility, clinical facility, hygiene specialist waste devastation with scientific

non reusable, organic waste, clinical plastic waste, contaminated materials, red bag waste, needle disposal, gauze and additionally plasters,

secured sharp containers, pathological waste, trace-chemotherapeutic wastes, and so forth.

Our collection of incinerators provide for little to big range family pet cremation relevant business, such as fowl ranches, livestock

ranches, lamb ranches, pig ranches, stables, kennels, screening laboratory, catteries, pet dog crematoriums. Vendor clear up rate for incinerator consumer,

The incinerator burn waste in primary combustion chamber and burn the smoke from primary combustion chamber again to 

make sure environmentally friendly with no black smoke, smelless, reduce pathogenic bacteria infection.

System solutions for medical waste environmental, including waste incineration, smoke emission treatment, high-temperature 

sterilization, ultraviolet sterilization lamp, waste shredder, needle destroyer, medical waste package, sharp containers, etc.

The pet cremation equipment humanized design with movable platform, small space covers for modern pet cremation 

business owner all over the world.

The containerized mobile incinerator mounted in ISO container before leave factory, pre-installation, no incineration house 

build construction, movable by truck and ultraviolet lamp sterilization inside.

We are growing brand for environmental protection field, and market share with most of 

Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental 

organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. 

We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan.

supply clinical burner, medical center burner, family pet burners, hog burners, pet dog cremation tools, small incinerator,

pet dog burner, pet dog burner, mobile burner, little pet dog burner, transmittable waste pyrolysis tool, lab

heater.

burner.



New waste incinerator for Macau”


New waste incinerator for Macau.

Items/Model TS50(PLC)
Burn Rate 50 kg/hour
Feed Capacity 100kg
Control Mode PLC
Combustion Chamber 560L
Internal Dimensions 100x80x70cm
Secondary Chamber 280L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.7Kw
Oil Consumption (kg/hour) 12.1–24
Gas Consumption (m3/hour) 9.9–26.1
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 100L
Feed Door 70x55cm
Chimney 5Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃
Residency Time 2.0 Sec.
Gross Weight 4500kg
External Dimensions 230x130x155cm


Animal Incinerators (A1200)


Basic Info.

Model NO.:A1200
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:North America

Additional Info.

Trademark:clover

Product Description

A Model creature crematory is newest layout for animal cremation and other solid waste. This gear quality structural for kinds of site, such as hospital, environmental department, animal cremation phuket medical waste incinerator, pics of pet crematorium, images of incinerator, images of industrial waste incinerator, plasma gasification cremation, agencies, etc.. CLOVER Incinerator provide updated models with dual combustion room, mix combustion room and smoke filter room using refractory lines, along with the combustion room temperature up to 1200 deg C. 

Key Attributes:  * All models with Dual combustion room.  *according to order  * High fever, long lifetime of incinerator.  * Free or minimum installation on site.  * High speed, from 10kgs to 500kgs per hourto 6ton per day.  * PLC Control Plane. *according to order  * New Design for pet animal cremation enterprise.  * One year warranty on incinerator and parts in stock.

Items/Model A360 A600 A900 A1200
Burning Rate *animal 20 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 60 kgs/Hr.
Feed Capacity *animal 30 kgs 50 kgs 80 kgs 100 kgs
Equipment Weight 2300 kgs 3000 kgs 4000 kgs 4300 kgs
Primary Chamber (Liters) 360 600 900 1200
Secondary Chamber (Liters) 200 200 300 500
External Dimensions (cm) 145x90x175 175 x 100 x 180 200x160x230 220x180x360
Internal Dimensions (cm) 100x60x60 130 x 70 x 65 120x90x85 130x100x90
Oil Tank(Liters) 200 200 300 300
Door Opening (cm) 48 x 60 50 x 60 62 x 80 55 x 80
Chimney (M) 5 5 5 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800 degree–1000degree  800 degree–1000degree  800 degree–1000degree  800 degree–1000degree
2nd. Chmaber Temperature  800 degree–1000degree  800 degree–1000degree  800 degree–1000degree  800 degree–1000degree

Medical Waste Incinerators


3. You do give secodn hand incinerator in great working condition.

Incinerator but the dimension of chamber > 2000 x >> 1200 mm. Plan for burn off FLUID Waste +/- 20 liter/hr.
A; Set Capacity for every design, just how much tons can we put in one-time. I need tio beneath stand in duration of batch load one time I can ut in Kgs.
The mobile unit is our top priority then the most taken care of devices. The mobile system is our priority following the fixed systems.
5. Please send us DEFRA and DADR authorization records by attachment, replicate of ISO as well as summary of gasoline emmission record from burners.

3. You do give secodn hand incinerator in good working condition.
4. We require only double chamber dual heater incinerator.
5. Please send us DEFRA and DADR authorization records by accessory, copy of ISO as well as summary of gas emmission report from burners.


clinical heater key combustion price



Our normal activities produces 2-5 lots of different waste items daily which vary from condemned carcasses, and also medical burner primary combustion price

other wastes all which need to be blazed at above 800Centigrade gauged flue exhaust gas.To be made use of by small

health care centers as well as facilities to securely take treatment of contagious as well as pathological wastes. 50kg/Hour – – – –

Burners to be really trustworthy, gas efficient with high/ decreased capacity melt prices
Modern Technology:

Temperature Level Controlled Heating System. Heavy-duty real estate, to be a quality, sturdy, reliable, budget friendly Medical Waste

Burner with appropriate control, very easy to run as well as likewise self-supporting.
Equipments to be pre-assembled, pre-piped, pre-wired & & & & assessed prior to Transport/ Export.

Within the framework of a ecological and also clinical equipment & & & & modern technology consultation and joint purchasing, this

Purchase Bureau invites candidates for pre-qualification in the objective of primarily selecting competent companies to bid

for the above tender.
The supply will make up the unique devices for reliable waste management as mentioned over for a brand-new individual

environment contract administration business with prepared procedures 2013 in Indonesia in addition to Thailand, as well as 2014 in West & & & & East

Malaysia to accomplish those expert solutions in order to comply with the federal governments safety and protection disposal needs

for medical as well as medical facility, specialist waste in the area and also to fulfill the greater technical criterion in this particular

field.small incinerators with filter (with the really the very least minimum pollution) for burning/combusting 5kg/hr, 10kg/hr, 15 kg/hr,

20kg/hr, 25kg/hr to 50kg/hr as well as also 300kg/hr of SOLID ALL-NATURAL DRY AND DAMP NON-HAZARDUOUS of any type of kind (including health care center

wastes) everyday or per hr. Needs to it be without any smoke, no fumes, no smell (odor), no dust, no emission of solid

bits and with the extremely least minimal contamination (within nationwide in addition to worldwide requirements). Required to be eco

healthy and also balanced along with acceptable with worldwide requirements. Need to not be with water scrubbers. Ash materials after melting

must be 3-4%.

Our normal activities creates 2-5 loads of different waste items daily which vary from condemned carcasses, as well as likewise medical burner major combustion rate



Medical Waste Incinerator


Basic Info.

Model NO.:medical waste incinerator
Export Markets:Global

Product Description

Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator Maker in China.

Key Features:  * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long lifetime. *based to order  * High fever, long lifetime of incinerator.  * Free or minimal installation on site.  * High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day.  * PLC Control Plane. *according to order  * New Design for pet animal cremation business.  * One year warranty on incinerator and components in stock. 

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Program Scope:  1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste.  3. Community & Sea Port & Station: Municipal Solid Waste, etc.  4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

Diesel/LPG/LNG burning vital burning chamber/primary combustion burner



Key burning
Diesel/LPG/LNG burning vital burning chamber/primary burning area
Second burning
Residence time in the second chamber not less than 2 secs
Both essential along with the second temperature levels maintained up until all the waste has in fact been entirely stired up
Chimney
Chimney with a very little height of 4 meters over ground level
Minimum leave velocity of the discharges very little less than 10 metres/second
Temperature level Cautions
Visible and/or distinctive alarm to warn the vehicle driver when the second temperature level drops to listed below the needed temperature level
General
Control box that can be separated as well as mounted on different stand a minimum of 1.5 meters from burner at around 1.6 meter

heightItem 1
Burner style A

Melt Rate 65kg/h minimum

Weight (kg), please show:

Secondary Chamber

Gas Retention Time – – – – 2 Secs

– Fuel – Diesel/LPG/LNG, please show

Power Supply for Control Box – 220V-240V 50Hz solitary phase

Minimum running temperature level 850 ° C, please recommend

One year Spare Components Prepare for total maintainability

10m Tube Pipe, recommend size

I000 Litre Gas Tank + Pipeline System, show quantity

Added smokeshaft expansion, show elevation

Solution guarantee, suggest no of years

Thing 2
Incinerator version C.
Burn Rate 250kg/h minimum

Weight (kg) please showProgram.
2nd Chamber.
Gas Retention Time 2 Secs.
Fuel Diesel/LPG/LNG, please show.
Power Supply for Control Box 220V-240V 50Hz solitary stage
. Minimum running temperature level 920 ° C, please recommend.
One year Spare Elements Bundle for full maintainability.
10m Hose pipe Pipe, indicate size.
I000 Litre Gas Tank + Pipe System, indicate quantity.
Bonus smokeshaft expansion, suggest elevation.
Guarantee, indicate no of years

Warmth Waste Incinerator

Capability at least (4000) kg/day (( Day= 16 Working Humans Resources))

Capability at the very least (4000) kg/day (( Day= 24 Working Hrs))

With the following qualities:

* Automatic feeder as initial part of the unit.

* Automatic ash/ leftovers removal as preliminary part of the device.

* Water Injection System to manage the temperature > >

* Flue gas filtering system abiding by EU.
HTW Incinerator design D.
Burn Rate – – – – 150kg/hour minimum. Weight( kg), please indicate:.
Secondary Chamber.
Gas Retention Time 2 Seconds.
Gas Diesel/LPG/LNG, please program.
Power Supply for Control Box 220V-240V, solitary stage 50-60Hz.
Minimum running temperature level 1200 ° C, please program

One year Spare Components Prepare for full maintainability

10m Tube Pipe, show size.
1000 Litre Gas Storage Tank + Pipeline System, suggest quantity.
Bonus chimney extension, suggest height.
Mobile Burner

Item 5.
Mobile Heater version E

Melt Cost 50kg/h minimum

Weight (kg), please program:

Second Chamber

Gas Retention Time – – – – 2 Seconds –

– Gas – Diesel/LPG/LNG, please suggest

Power Supply for Control Box – 220V-240V 50Hz solitary stage

Minimum running temperature degree 850 ° C, please suggest

One year Spare Elements Package for complete maintainability.
Mobile Incinerator

Point 6.
Mobile Incinerator variation F

Melt Rate 100kg/h minimum

Weight (kg), please indicate:

Second Chamber

Gas Retention Time – – – – 2 Secs

– Fuel – Diesel/LPG/LNG, please suggest

Power Supply for – Control Box – 220V-240V 50Hz solitary phase

Minimum running temperature level 850 ° C, please suggest

One year Spare Components Bundle for full maintainability

10m Pipeline Pipe, suggest size

1000 Litre Gas Container + Pipe System, show amount

Additional smokeshaft expansion, show elevation

Service warranty, indicate no of years.
Warmth Waste Mobile Incinerator.
Product 7.
HTW Mobile Heater version G.
Burn Cost 100kg/h minimum.
Weight (kg), please suggest:.
Second Chamber.
Gas Retention Time – – – – 2 Seconds. Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – – – – 220V-240V 50Hz solitary stage

Minimum running temperature level 1200 ° C, please suggest.
Key burning.
Diesel/LPG/LNG burning primary burning chamber/primary combustion area.
2nd burning.
Residence time in the second chamber not much less than 2 seconds.
Both primary and the additional temperature levels protected up until all the waste has been totally ignited.
Smokeshaft.
Smokeshaft with a marginal altitude of 4 meters over ground level.
Minimum leave rate of the emissions not less than 10 metres/second.
Temperature level Cautions.
Audible and/or noticeable alarm to encourage the driver when the additional temperature goes down to listed below the called for temperature level.
General.
Control box that can be separated as well as mounted on separate stand at least 1.5 meters from burner at about 1.6 meter

altitude.
Assurance, show no of years

Weight (kg) please show:.
Service warranty, indicate no of years

Warmth Waste Burner

Ability at the very least (4000) kg/day (( Day= 16 Functioning Hrs))

Ability at the very least (4000) kg/day (( Day= 24 Working Hrs))

With the complying with qualities:

* Automatic feeder as original component of the device.

* Automatic ash/ leftovers elimination as preliminary element of the system.

* Water Injection System to control the temperature level > >

* Flue gas filtering system following by EU.

* Consistent discharge monitoring and also recording system.

elevation.
Guarantee, show no of years