Burners


drop between 5000-10000 pound per hour.Mostly waste from oil storage tanks. Construction and construction, installment and 6 months upkeep expenditure including specifications.CMSD for Double Chamber Rotating Klin Kind Incinerator (1st Chamber temperatur not less than 850 degree centrigrade & & 2nd Chamber Temperature Level not less than 1200 c with exhaust pipeline 100 meter long with release gasoline filtering mechanics ), Hydroclave (Clinical) with anciliary apparatus functioning standards: Temperature 250-275 degree feren, Pressure 15-35PSI, Sanitation time 30 minus, Set capacity -463 kg. 2 Burners for a healthcare centre in VN. The anticipated ability is roughly 1,000 kg every day.


waste burner manufacturers china



Capacity Not much less than 500Kg/hr.
Procedure 24hr-7days/ week continuous operation.
Burning chamber 2 burning chamber.
Temperature. Burning chamber 800-1000 C.
Secandry combustion burning 1000-1200 C, with the possibility to be updated to 1400 C.
Burning Performance Effectiveness 99.99%.
Retention time Of the flow gases not much less than 2 Sec in the hot component.
Excess Oxygen focus Of key burning chamber 3-6% max.
Refractory The chambers need to be lined with high thermal securing refractory blocks with perfect density and additionally with incredibly temperature. resistance. Not less than 1400 C for the very first combustion chamber, and not much less than 1600 C for the secandry combustion chamber, as well as additionally at the specific very same time avoid the Temp. of the outdoors body of the chamber not greater than 70 C.
Doors Need to be lined with the similar bricks, as well as the sides lined with distinct excellent shielding item to stay clear of any kind of kind of gas running away, as well as additionally the doors should be kept under negative stress and anxiety throughout the operation.

Air Exhaust Control System With high damages and also elimination efficiency (DRE). Not much less than 99.9999 based upon KEPA.
Wet System If the system equiped with a CEMS cleaning the blood circulation gas with water, after that it should be created from suitable anti corrossion materials, as well as likewise equiped with pH meter to assess in addition to reduce the results of the water. It ought to be able to use the water in shut recycled circuit many times prior to treating/ releasing right into the sewage system in conformity with KEPARS.
Chemical application It should be equiped with proper autochemical application system to manage the pH for the water of the wet scrubber system including picking up systems.
Chimney It require to be ideal with the capacity in addition to the technological requirements, with elevation not much less than 12m from ground degree. With easy opennable tasting factor equivalent concerning 3 inch, and also the optimum tasting locations goes to the really the very least 8D downstream instructions as well as also 2D upstream from any type of kind of flow disturbancies.
Sampling aspect Requirements to be equiped with a system positioned down the sampling element by a range very little less than 1 m, and also equiped with ideal stairs from ground to the port with comfortable slope.
Ash Removal It need to be car ash removal system.
Fuel It ought to be twin system, such as diesel in addition to gas.
Feeding System Must be vehicle feeding system right into primary chamber.
Control Area Must be equiped with a control board reveals Temp. of the burning heaters, gas monitoring, electronic Temperature level. indecation for the primary/secondary chambers, digital Temperature. indication for the gases … … and so on it should certainly be also Car procedure, burnures on/off vehicle lights switch, auto start/stop for air discharge control system, automobile gas continuous security system analysis in addition to print out of gas exhaust specs…… … … and so on. A/c System The primary chamber ought to be supplied automobile cooling systemthrough nozzles to permit direct air conditioning if the Temperature. If the burning Temperature, will definitely be heigher than 1100 C.
Inter-lock system The incinerator burner ought to equiped with inter-lock system to stop quit the waste to the primary chamberTemperature level less than 500 C.
Flue therapy as well as likewise cleaning To be composed a combined system (wet/dry), taking advantage of water, lime, energetic carbon as well as ceramic filters.

Quelling system/Heat exchanger Have to be made as well as created from anti rust and acid attack products such as stainless-steel 316 or comparable.
Noise Degree Not greater than 85 dBA throughout regular procedure.
Inaddition The desigh ought to guarantee that responsive safe and secure control systems are made use of.
The burner should be placed inside closed appropriate structure with fantastic oygenation as well as air circulation system. The building has centers for off-loading of wastes from transport trucks. Auto cleansing system for trucks and likewise waste containers, as well as additionally great storage location…… … … and more
. The quotation should included checklist of initial extra elements for 7 years.
The quote should contain overseeing, launching as well as training of the drivers as well as additionally ministry of health and health designers inside/outside Kuwait.
Thorough illustrations, publications should be included.



heater tiny to tool waste dispossal



Carburant Diesel
Capacité (M3) 1.92
Ave Capability 1200kg
Consommation (litre/heure 12
Dimension externes
Longueur (mm) 3110
Largeur (mm) 2150
Hauteur (mm) 3200
Ouverture Porte 1000×× × × 2000.
Dimension internes
. Longueur( mm )2200.
Largeur( mm) 1050. Hauteur( mm) 800.
Optimum température d’opération 1320.
Température de suivi oui.
Thermostat oui.
Ventilateur oui.
Chambre de burning secondaire 2 secs.
garantie minimum 12 mois.
Carburant Diesel.
Capacité (M3) 1.18.
Ave Capability 750 kg.
Consommation (l/h) 6.
Dimension externes.
Longueur (mm) 3110.
Largeur (mm) 1800.
Hauteur (mm) 3300.
Ouverture Porte 770×× × × 2000.
Dimension internes.
Longueur (mm) 2100.
Largeur (mm) 700.
Hauteur (mm) 800.
Opération. burner tiny to tool waste dispossal for concerning 150-200 cosmopolitan waste from shopping mall, work environment as well as additionally residential.

The waste most include vary products plastics, rubber, paper, grass, leaves, timbers, fruits, item packaging container, as well as additionally a number of others

Minimum température d’opération 950.
Optimal température d’opération 1320.
Température de suivi oui.
Thermostat oui.
Ventilateur oui.
Chambre de combustion secondaire secs.
garantie minimum 12 mois.a little animal crematorium, creates along with rates

The waste most contain differ materials plastics, rubber, paper, turf, leaves, woods, fruits, packaging carton, as well as likewise whole lots of others

Minimum température d’opération 950.



Waste disposal burner


{
(adsbygoogle = window.adsbygoogle || []).push({});|}
The chamber of the incinerator should have the ability to transport about 200 – – – – 250 kg of waste at a used time. edical Waste Incinerators.

Incinerator however, the measurement of chamber > 2000 x >> 1200 mm.
C: The quantity of batch can we place in about a daily basis per 24-hour.|C: The quantity of batch can we place in about a daily basis per 24-hour.
What is your minimum capacity as well as likewise maximum capacity heater.
4. We require just double chamber double burner incinerator.
(adsbygoogle = window.adsbygoogle || []).push({});
5. Please send us DEFRA and also DADR authorization records by attachment, copy of ISO and also recap of gas emmission report from incinerators.


small scale medical waste incinerator


Toxic and dangerous wastes,
Medical pharmaceutical and hospitable liquids  Wastes
Domestic garbage
Electric and electronic wastes
Industrial wastes
In General, all type of wastes and garbages
Capacity 50-60Kg/h

Combustion supporting materials
Coal oil, diesel oil

Temperature inside
800-10000C

1000-12000C

Burning efficiency
>98%

Power consumption
1.3KW

Noise
<78dB

Index of let smoke and waste gas
Ringelman’s smoke index< level 1

Smoke concentration
Oil
45.5

(mg/m3)
Gas
25.5

(mg/m3)

SO
Oil
0.176
Gas
0.065

NOX
Oil
0.031
Gas
0.038

H2S
Oil
0.016
Gas
0.008

CO
Oil
8.32
Gas
35.64

small scale medical waste incinerator Requirements
Incombustible and explosive materials not allowed in

Process manner
Two combustion cabinets (wetness drying, high temperature dust removal)

Combustion / Burner
Good Quality made in Italy

Blower
Good Quality made in China

Control Electrical
Good Quality made in China

Capacity 50 Kg/h

Working Voltage
220 V

Power
1000 W

Applied For
200 beds

Input Fashion
Manual

Medical Incinerator, 24 kg/hr
Medical Incinerator, 24 kg/hr including panel board, controls and accessories
Furnace gate
Chimney
Blower
Combustion burner

Medical Incinerator, 12 kg/hr
Medical Incinerator, 12 kg/hr including panel board, controls and accessories
Furnace gate
Chimney
Blower
Combustion burner

Medical Incinerator, 6 kg/hr
Medical Incinerator, 6 kg/hr including panel board, controls and accessories
Furnace gate
Chimney
Blower
Combustion burner


Containerized Type Pre-Assembled Mobile Medical Facility Waste Burner Model CA100



Items/Model

CA100

Image

Concept

Medical Waste Incineration Treatment

Burn Price

Average 100 kg/hour

Feed Capability

Standard 200kg/feeding

Control Mode

PLC( Programmable Logic Controller Burner)

Burning Chamber

1200L

Internal Measurements

120x100x100cm

Secondary Chamber

600L

Smoke Filter Chamber

Yes

Feed Mode

Handbook

Voltage

220V

Power

1.3 Kw

Oil Consumption (kg/hour)

Ordinary 20.4 Kgs/Hour

Gas Usage (m3/hour)

***

Temperature Display

Digital Show

Temperature Level Defense

Yes

Oil Container

200L

Feed Door

80x60cm

Smokeshaft

5Meter

Smokeshaft Kind

Stainless Steel

1st. Chamber Temperature

800 ℃–– -1000 ℃

second. Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

6000kg

External Dimensions

260x150x180cm

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-25



incinerator manufacturer


“PYROLYTIC” combustion, by controlling the gasification of waste

The incinerator manufacturer must avoid the release of black smoke and fine dust, during the loadings.

It shall be able to reduce the volume of wastes by 98%.

It shall be able to hold emission in the second burn with gas residence of not less than 2 seconds.

 

The incineration should be completely free from visible smoke as well as offensive odours.

1.0The primary ignition burner shall providing ignition of the waste to 850 °C and must switch off to conserve fuel.

The primary combustion chamber shall be constructed from heavy steel plate and the unit is internally lined with a

complete layer of hote face refractory and high efficiency insulation.

The Internal diameter of the Chimney at least: ? 400 and its height: 8 m