Finish
All equipment shall be painted with a coat of zinc rich primer and two coats of high temperature heat resistant
polyurethane type paint. All painted surfaces shall be prepared by either steel shot cleaning or sand blasting.
Identification and Name Plates
Identification and name plates containing the manufacturer’s name, model number, serial number, and other pertinent
information shall be securely fastened to the unit in readily visible locations.
Fuel Type and Tank
All burners shall be fuel oil (diesel) fired. For all incinerators fitted with fuel oil (diesel) type burners, the
bidder shall supply and install 1000 litres steel tank and all the necessary piping and fittings and initial supply of
1000 litres fuel oil. Where existing fuel is found to be still in good condition from site inspection, contractors must
use existing tanks and therefore must clearly specify in their bids of such usage. The tank shall be positioned at
least 2 meters above ground on steel frame next to the incinerator shed. Fuel delivery to incinerator burners shall be
by gravity feed. The tank should be fitted with a drain plug as standard.
Medical waste incinerator
Standard requirement:
The medical incinerator should meet the European standards 2000/76/EC.
Basic requirements:
1-Capacity 100kg/hr.
2-Work for 24 hours.
3-Unit should have enough combustion room consists of two combustion chambers (mounted vertically)
4- Unit should supply with control methods for air entry to the primary and secondary chambers and hence incineration
of the waste is accomplished.
5-The unit charging is done automatically and have an option to be done manually.
6-The ash removal is done automatically and have an option to be done manually
7-The unit should have a dry filtering unit.
8-The unit should be controlled from the control panel.
control panel :
Should show different tasks of operation using (PLC)
-Temperature in combustion chamber
-time of operation and combustion.
-different pressures.
-amount of air in combustion.
-efficiency indicator.
-emergency system in case of increasing pressure or temperature.
f- Time for gas passing:
Minimum time required for passing to combustion chamber for oxidizing 0.5 seconds at 800 degree Celsius .
1- design details:
A-primary combustion chamber:
Oxidize all waste to combustion residuals and temperature not less than 800 degree Celsius.
b- Secondary chamber:
Continue combusting combustion gas residuals and hanging particles using additional burner temperature not less than
1100 degree Celsius and this conditions is reached by harmonizing between temperature and time of passage to ensure
adequate oxidizing supplying enough air to ensure turbulence of gas all the time this is controlled from control panel.
Metro Vancouver is taking more heat over its strategy to construct a second garbage incinerator, using a new study commissioned by squander firm Belkorp Environmental Services indicating the move could cost around $1.3 billion more than originally estimated.
The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to take care of the state’s rejection of its proposed Bylaw 280, which was essential to its solid waste management program because it could have guaranteed crap created in Metro was kept in the area.
Belkorp, which conducts the Cache Creek ditch, has been engaged in a high-profile lobbying effort against Bylaw 280 as well as Metro Vancouver’s plans to burn off the region’s waste rather than landfill it. Metro is slated to close the Cache Creek ditch in 2016.
“We’re still battling for alternatives that are far better than the incinerator,” said Russ Black, Belkorp’s vice-president of business development. “Regardless of Bylaw 280, we still wanted to demonstrate the true costs of this incinerator.”
The analysis, by ICF’s lead author Seth Hulkower, indicates Metro Vancouver significantly outperforming the revenue it would earn by selling electricity in the new incinerator into BC Hydro within a period of 35 years.
Metro had suggested it would seek to negotiate a cost of $100 per kilowatt hour from BC Hydro, but Hulkower noted the waste-to-energy business plan does not take into account that BC Hydro may correct the cost it pays for electricity after Metro recovers it capital outlay on the undertaking.
Metro Vancouver chairman Greg Moore said he is not surprised with the research’s findings, stating it’s a point that has long been contended by Belkorp.
But he said the research is early considering that Metro has at least 10 proponents offering different forms of waste-to-energy, such as district heat and gasification, and there are many potential scenarios.
“They’re persistent in pursuit of the agenda to continue to possess garbage going to their landfill,” Moore stated. “Until that decision is made I do not believe they’ll stop.”
Belkorp has a Coquitlam site where it proposes to construct a facility to take a”last pass” at waste to remove recyclables such as organics, plastics, paper and alloys, a movement that would ultimately rob the area of enough material to fuel a different waste-to-energy facility.
Black acknowledged multi-material recovery centers directly compete with incinerators however state that they make sense. “When you examine the range of prices, there’s some serious questions that need to be addressed,” he said.
Belkorp already has a Coquitlam site where it proposes to build a facility to take a “last pass” at waste to remove recyclables such as organics, paper, plastics and metals, a move that would ultimately rob the region of enough material to fuel another waste-to-energy facility.
Black acknowledged multi-material recovery facilities directly compete with incinerators but say they make sense. “When you look at the range of costs, there’s some serious questions that have to be addressed,” he said.
MSW Model is newest design for municipal solid waste and other waste. This gear quality structural for kinds of site, like hospital, environmental division, animal cremation agencies, etc.. CLOVER Incinerator provide updated models with double combustion room, chinese cremator manufacturers, chinese incinerator, chinese incinerator photo, clinical waste incenarator machines in china, cloer incinerator, mix combustion room and smoke filter room with refractory lines, and the combustion room temperature up to 1200 deg C.
Items | Specification | |||
Model | MSW2000 / MSW3000 / MSW4000 / MSW5500 | |||
Main Product List | Primary Combustion Chamber | |||
Secondary Combustion Chamber | ||||
Mix Combustion Chamber | ||||
Smoke Filter Chamber | ||||
Incinerator Common Control Case | ||||
Stainless Steel Chimney | ||||
Italy oil/gas burner: 02 units | ||||
Oil Tank (if oil fuel) |
Technology Respond(FAQ)
Q: What is kind of waste can utilize within this gear? A: This gear for medical waste, pet animal, Municipal waste, reside waste. Prohibit any volatile and radiation material, liquid gas and waste waste. GB18484-2001.
Q: Remedy capacity A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour)doesn’t indicate any waste material. Incinerator price, incinerator price for 50kg/hr made in china, incinerator producers, incinerator small scale, incinerator suppliers in china, incinerator baths china, The animal/pet combustion speed around 2/3 of average capacity.
Clover incinerator utilize time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time plus time for feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year based on utilize.
Ordinarily, we proposition small laboratory, small clinic use capability under 20 kgs per hour. If incinerator use in hospital, please calculate the waste output capability around 2kgs per people per day. If there are 200 sickbed in the hospital, that's mean you need 1 incinerator capability around 400kgs per day, switch to capacity per hour is approximately 30-40 kgs per hour. According the performance time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator. *How to calculate Animal Cremation Burn Rate: 2/3 of this medical waste.
Q: Assembly and Testing A: We provide all documents and incinerators easy to setup and operation. Customer can send people come to our factory to learn installation and operation. Generally, we don’t send engineer to neighborhood website if not ask. The dispatch cost is additional based on order.
Q: Combustion Temperature A: The first combustion chamber: 800-1000 centi degree. The second combustion chamber: 1000-1200 centi degree.
Q: Incinerator Control Mode A: Default Control manner is common control case. PLC mode based on order and model.
One person can service 02 device incinerators. The team should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower in accordance with performance user guider, and understand threat of medical waste to protect employee self with mandatory security element.
Q: The Residency period in secondary combustion chamber A: 02 sec.
One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element.
Q: The Residency time in secondary combustion chamber
A: 02 sec.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
Items/Model | YD-200 | YD-300 | YD-500 | YD-600 |
Burning Rate (kgs/Hour) | 200 kgs/Hr. | 300 kgs/Hr. | 500 kgs/Hr. | 600 kgs/Hr. |
Feed Capacity (kgs) | 400 kgs | 500 kgs | 800 kgs | 1100 kgs |
Equipment Weight | 7600 kgs | 8300 kgs | 13000 kgs | 16500 kgs |
Primary Chamber (Liters) | 2000 | 2400 | 4000 | 5500 |
Secondary Chamber (Liters) | 500 | 1200 | 1500 | 1500 |
External Dimensions (cm) | 270 x 185 x 380 | 260x220x420 | 320x220x460 | 360 x 220 x 475 |
Internal Dimensions (cm) | 180 x 115 x 96 | 220x110x100 | 257x147x108 | 300 x 147 x 125 |
Oil Tank(Liters) | 300 | 500 | 500 | 500 |
Door Opening (cm) | 59 x 81 | 90 x 110 | 108 x 128 | 108 x 128 |
Chimney (M) | 10 | 10 | 14 | 14 |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Secondary Chamber | YES | YES | YES | YES |
Mix-Combustion Chamber | YES | YES | YES | YES |
Smoke Filter Chamber | YES | YES | YES | YES |
Combustion Fuel | Oil/Gas | Oil/Gas | Oil/Gas | Oil/Gas |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Temperature Monitoring | YES | YES | YES | YES |
JQuery(record ).ready(function($) $.post(‘https://www.medicalmate.net/wp-admin/admin-ajax.php’, action: ‘mts_view_count’, id: ‘5585’);
Alimentación intermitente (con cargador opcional): 0,9 yd3 / h (0,7 m3 / h) hasta 8 horas / día
Especificaciones: Longitud total del sistema por lotes de -9′-6 ″ (2896 mm) sin cargador
18′-6 ″ (5639 mm) con sistema de carga opcional Ancho total -7′-6 ″ (2820 mm)
Altura (sin pila) -10′-0 ″ (3048 mm) Aprox. (6364 kg) sin
Cargador
si se mide durante un período de 6 per 16 horas.
Nota:
Todas las concentraciones de contaminantes deben expresarse a Oo C y 1.013 x 10 5 N / m2, gasoline seco y corrección de 11% de oxígeno. Los materiales destinados a la incineración deben ser de origen y composición conocidos y deben
incinerarse únicamente en un horno que esté registrado para el tipo particular de residuo.
el mal funcionamiento debe registrarse en un libro de registro y notificarse a la autoridad competente.
autoridad.
11 Limpieza El sitio donde se construye el incinerador debe:
12 Salud y seguridad (equipo de protección) 1. El personal que manipula los desechos debe estar bien capacitado en el manejo seguro de
Desechos peligrosos
gafas de protección.
);
JQuery(record ).ready(function($) $.post(‘https://www.medicalmate.net/wp-admin/admin-ajax.php’, action: ‘mts_view_count’, id: ‘5585’);
Alimentación intermitente (con cargador opcional): 0,9 yd3 / h (0,7 m3 / h) hasta 8 horas / día
Especificaciones: Longitud total del sistema por lotes de -9′-6 ″ (2896 mm) sin cargador
18′-6 ″ (5639 mm) con sistema de carga opcional Ancho total -7′-6 ″ (2820 mm)
Altura (sin pila) -10′-0 ″ (3048 mm) Aprox. (6364 kg) sin
Incinerate: medical waste and general waste Capacity to burn waste:
400-500kg/hr
Fuel: Diesel
Fuel Consumption: 10 liters/hr maximum
Incineration temperature: 950-1300 degrees centigrade
Casing: thick (min 5mm) stainless steel casing and fully insulated to
withstand sea humidity Voltage 220/240v or 380/415V Frequency 50Hz
high-capacity, powerful, European Standard incinerator,ideal for high volume incineration,with integral after-burner for greater efficiency and emissions control.
Waste Type and Burn Rate
Designed specifically for use by poultry farmers,
sheep farm owners, abbatoirs and for pet
cremation. The incinerator will burn up to 50kg of
waste per hour (up to 150kg burn
Construction
Mild steel welded fabrication consisting of sheet steel
and structural section supports.
Lining
Monolithic high grade refractory concrete with high grade insulation backing.
Burners
Fully automatic, high-efficiency burners with electronic ignition, flame recognition and combustion control devices fitted.
Loading – Ash removal
Manual ash removal from the primary chamber. (Ash doors are available on request).
Exterior finish
Multi-coat high quality, high-temperature aluminium enamel top coat paint, finished in silver.
Control
Fully automatic sequential control provided by internal
waste incinerator manufacturers from china, PLC system providing control of:
1. Secondary chamber pre-heat
2. Burn cycle (variable)
3. Cool down cycle
Fuel Options
Diesel, LPG, Natural or Bio Gas.
Typical Fuel Consumption
Diesel: 8 / 10 litres per hour
Liquid Propane Gas: 6 / 8 litres per hour
Natural Gas: 7 / 9 Nm3 per hour
Electrical supply
240volt 16 amp.
Key Specifications
Chamber Volume 2.38m3:
2.2m (l) x 0.9m(w) x 1.2m(h)
Load Capacity up to 1000kg
Load Method Top.· Type: Pyrolytic
· Use: For drugs
· With Chassis to be Mounted in truck/lorry
· May have a primary and secondary combustion chamber
· Must have a dilution chamber
· Capacity: 100 Kgs per hour
· Power Source: Diesel or Natural Gas or Liquified Natural Gas