Capability of destruction in weight 60 Kg/h


* A switch breaker for every engine (ventilators and burners).
* Heater with gas, mono-bloc casting directing form with flat flame, lighting as well as security of electronic

ignition, longterm air leak, electromagnetic sluice entry of regulation and isolating valve.
* A timer with flexible temporization for the regulation of every burner.
– Refractory concrete:
.
. Nature: 42% of Al203.
9. The incineration has to be totally devoid of visible smoke in addition to offensive odours.
24.
23. Ability to deal with Plastic: Not less than 40% by weight.
10. The reduced volt electricity (L.C.P) of the waste will be 3,500 kcal/kg
8. It should be able to hold exhaust at the 2nd melt with gas house of not less than 2 seconds.
* A tool of injection of air permitting a general re-combustion of gases.
This burner with “PYROLYTIC” burning ought to have:.
* Carcass in solid sheet steel with support of connection.
2. What about the warm created throughout burning, are there windows or air circulation right into the containers.

–– Intake of power and additionally gas. Medical facility garbage disposal system for a health facility job

–– Ash removal odor.The burner is for CONTAMINATED MATERIALS and SOLID WASTE along with marginal carbon release.

–– Automatic treating procedure temperature regulated chamber.Incinerator with 150l waste room

–– Second room.

1. Do you have plans for over incinerators revealing flooring measurements, height. What goods should be used for your FLOOT, WALLS, ROOFING SYSTEM ETC. 1) The sole consumable needed for the system TS100

(PLC) is Oil( diesel) is that OKAY?

two ) from your technological requirements: petroleum intake (Kg/hour) is between 14–– 28) would you indicate is liters/hour?

example the incinerator will be working for 10 hours each day indicates that the oil use will be 140 Litres or more?

3) Chimney type stainless steel. Just how around main body building and construction materials?if you will find a whole lot more two choice of text

building and construction materials for much better life

3. Send out information regarding electric power, ventilation, fire security, wears down, chimney etc

4. Do you have erected shelters?Installation of waste disposal system (biomedical) 500kg ability layout, MP 500

clinical incinerator. We see you have container shelters. Send us appreciate quote for this thing

1. Ability of harm in weight: 60 Kg/h.
24. The provider will perform an onsite installment of the incinerator.
23.
2. It must have the ability to operate not less than 10 hours/day
* A sheath of release of these gases scorched.
* The insulating material of the burning chamber should be made up of refractory bricks, using a high content of aluminium

and insulates bricks in order to make sure a minimum temperature on the outside sheet metal.
12. The Volume of the burning room: 1.200 L.
* A regulator with electronic watching for the warmth of burning.
– – Assumption: general medical facility beds 50 percent, operation beds 50 percent to the 100 bed health centre position, while this

ratio is 30-70% for the other Circumstances
19. A control box making sure the entire cycle of burningoff. Follower:.
7. It has to be able to reduce the quantity of wastes by 98%.
– The Temperature levels of burning: Minimum will be 850oC in Addition to max 1400oC
* A heater of lighting which the use is restricted to the ignition of waste.
* A reduction of burning of gases,.
23. The mounted incinerator should birth a 1 year warranty.
* Flawlessly tight doorway to the hand-operated loading of waste. The loading ought to be Guidebook, Establish Tons.
15. Fuel: gas.
22. Process Filtering system: Scrubber to be stated as optional.
11. The Internal diameter of the Smokeshaft: Ø 400 and its altitude: 8 m.
5. ” PYROLYTIC” burning, by regulating the gasification of waste.

clinical waste incinerator solutions as well as prices for 100 mattress / 500 mattress / 1000 mattress / 3000 bed health facilities.
From the mill; it will consist of medicinal and preventive upkeep, and utilizing device, etc

following the control of the automated cycle.
17. A burning chamber of waste:.
* Make-up of the refractory;.
Would certainly it be feasible to give us information on the ability of burner we require

on this island.

–– Around 150 KG/Hrs. Burner to dispose our daily regular death with this size of the ranch.1. Can the

100kg/hr melt solid waste/hazardous waste such as expired paints, waste oil or compounds.
–– global standards and waste productions assumptions should apply
Nature: Magnesium.
– – fragments that can be easily arranged
* A regulatory authority with watch for the warmth of website post combustion.
4. Layout Requirements: Forms A, B, C, vitamin D, in Addition to E of clinical waste
21. Controls as well as coverages:.
* Electric box. The de- ashing needs to be completed at all-time low of the burning chamber or the deashing ought to be Automatic or hands-on

put de ashing.
Natural rubber, synthetic rubber, polyurethane sheet, and awkward movies, solids and
INCINERATOR, DIESEL.

Amount: 2 [two ] with total accessories.
* A secondary shot of air to ensure excellent oxygen web content.
– Protect in fibrous panel:.
3. This incinerator should be able to destruct all combustible wastes created by medical facilities, exclusive facilities,

labs, institutes, etc..
* Frontage of loading with door seals gone on hinges, wheel of screw plug, elastic joint, as well as packing protecting

from refractory.
13. The Measurement of the doorway for packing in centimeters: 70×× 70.
22. The provider must give batches of spare components of first urgency as well as consumable of the burner.
6. The incinerator must stay alert to the launch of black smoke as well as fine dust, (Electric) through the loadings.
25. The technological training of drivers will certainly have to be offered and provided by a professional.
* Burner of lights of waste, with gas, regular mono-bloc casting directing diving fire, lights and security of

electronic ignition, irreversible air flow, electro-magnetic sluice gate of law as well as separating shutoff.
– – Chemical waste solids along with liquids, waste petroleum and also various other difficult-to-handle things

The apparatus will definitely be licensed for performance from PME after departure website investigations.Manual tons double room

burner for clinical waste to melt 50kg/hr on constant process, with Main temperature amount approximately

800degC minimum and 1200degC or more in the Additional room, complete of charging doorway, Ash doorway, Air as well as check out

ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition device, the entire to

meet NEMA needs as well as various other worldwide requirements. Здравствуйте! Ж

ду ответа. Стоимость и доставка до г.Алматы Казахстан

The technical details we respect are:

–– Ability (burning capability of waste per hr). 150kg/hour. Burner with 300l waste room

–– Construct goods, 5mm Excellent excellent light steel structure; 100 mm excellent quality refractory lining.

–– High Temperature paint finish.we have 2 hospitals, more after that 20 dentist offices, and additionally over 50 physician offices.
14. Heater procedure ought to be Automatic On/Off.

out of refractory.
* The insulation of the burning chamber ought to be made up of refractory bricks, having a high content of aluminium

and also insulates bricks in order to ensure a minimum temperature on the outdoors sheet metal.
* Make-up of the refractory;.
– Refractory concrete:
. Density: ≥ 100 mm
. Nature: 42% of Al203.
– Shield in fibrous panels:
. Thickness: ≥ 75 mm.
– Nature: Calcium silicate.
* Burner of lights of waste, with fuel, standard mono-bloc casting directing diving flame, lights and security of

digital ignition, irreversible air flow, electro-magnetic sluice gate of law as well as separating shutoff.
* Plate of combustion in Carborundum, staying clear of the dealing with of glass and slags.

18. A chamber of article burning of gases.
* A burner of burning of gases,.
* A tool of injection of air permitting an overall re-combustion of gases,.
* A gadget of air inlet of air conditioning of waste gases,.
* A sheath of discharge of the gases scorched.
* Carcass in strong sheet steel with support of link.
* Composition of the refractory;.
– Refractory concrete:.
Thickness: ≥ 150 mm.
Nature: 65% of Al203.
– Protect in fibrous panel:.
Thickness: ≥ 85 mm.
Nature: Calcium.
* Heater with gas, mono-bloc casting guiding type with horizontal flame, lighting as well as safety of digital

ignition, long-term air flow, electromagnetic sluice entrance of regulation and isolating valve.
* A secondary injection of air to guarantee excellent oxygen web content.
19. A control box making certain the total cycle of burning.

20. Follower:.
* Electro-ventilator distributing the secondary air, the policy of the air circulation being executed by valves and also

following the control of the automatic cycle.
21. Controls as well as policies:.
Control box watertight to dirt, consisting of:

* A switch breaker for every engine (ventilators and also burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of burning.
* A regulatory authority with watch for the temperature of blog post combustion.
* Electric box.

21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on

set de ashing.
22. Process Filtering system: Scrubber to be stated as optional.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
23. Ability to treat Plastic: Not much less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
22. The provider has to give batches of spare parts of first urgency as well as consumable of the burner.
23. The mounted incinerator should birth a one year warranty.
24. The provider will perform an onsite installment of the incinerator.
25. The technological training of drivers will certainly have to be offered and also provided by a professional.
from the factory; it will consist of medicinal and also preventive upkeep, and using device, etc