Burners


dropped between 5000-10000 kg per hour.Mostly waste from oil storage tanks. Structure and construction, installment and also 6 months upkeep cost such as specifications.CMSD for Dual Chamber Rotating Klin Kind Incinerator (first Chamber temperatur less than 850 degree centrigrade & & & & next Chamber Temperature Level much less than 1200 c with exhaust pipe 100 meter long using discharge gas filtering system apparatus ), Hydroclave (Clinical) with anciliary gadgets operating standards: Temperature 250-275 level feren, Stress and anxiety 15-35PSI, Hygiene period 30 minus, Establish ability -463 kg. 2 Burners for a healthcare centre in VN. The anticipated capacity is roughly 1,000 kg every day.


Posted in incinerator-uae.