small capacity incinerators

1    Basic Plant Design    An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated sections may include but not limited to:

Overall plant layout.
Feed chamber/ charging
Primary Combustion Chamber.
Secondary Combustion Chamber.
Particulate Scrubbers
Acid Gas Scrubbers
The stack/ chimney.
2    Feeding And Charging    Controlled hygienic, mechanical or automatic feeding methods have to be used which will not influence the air temperature in the primary and secondary chambers of the incinerator negatively.

No waste is to be fed into the incinerator:

1.    Until the minimum temperatures have been reached.
2.    If the minimum combustion temperatures are not maintained.
3.    Whenever the previous charge has not been completely combusted in the case of batch feeding.

4.    Until such time as the addition of more waste will not cause the design parameters of the incinerator to be exceeded.

3    Primary Combustion Chamber    The primary combustion chamber must:

1.    Be accepted as the primary combustion zone.
2.    Be equipped with a burner/s burning gas/fuel or low sulphur liquid fuels. Other combustion methods will be judged on merits.

3.    Ensure primary air supply is controlled efficiently
4.    Ensure minimum exit temperature is not less than 850oC

4    Secondary Combustion Chamber (Afterburner).    The secondary combustion chamber must:

1.    Be accepted as secondary combustion zone.
2.    Be fitted with secondary burner/s burning gas or low sulphur liquid fuel or any suitable fuel.

3.    Ensure secondary air supply is controlled efficiently.
4.    Ensure flame contact with all gases is achieved.
5.    Ensure residence time is not less than two (2) seconds.
6.    Ensure the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100oC.

7.    Ensure the oxygen content of the emitted gases is not less than 11%.
8.    Ensure both primary and the combustion temperatures are maintained until all waste has been completely combusted

5    Particulate Removers    A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:

Cyclone separator
Electrostatic precipitators
Fabric filters
6    Chimney / Stack    1.    The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings within 50 meters radius should be taken into account.

2.    If possible the chimney should be visible to the operator from the feeding area.
3.    The addition of dilution air after combustion in order to achieve the requirement of these guidelines is unacceptable.

4.    The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting gases.

5.    Point for the measurement of emissions shall be provided.

7    Instrumentation    Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers.

2.    An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to below the required temperature.

3.    In addition to the above the following instruments may also be required.
A carbon monoxide and/or oxygen meter/recorder
A smoke density meter/recorder
A gas flow meter/recorder
A solid particulate meter/recorder
Any other instrument or measurement that may be considered necessary

8    Location / Siting    1.    Must be sited in accordance with the relevant local municipal authority planning scheme, the topography of the area and be compatible with premises in the neighborhood,

2.    Must be housed in a suitably ventilated room.

9    Emission Limits    1.    Combustion efficiency:

Combustion efficiency (CE) shall be at least 99.00%
The Combustion efficiency is computed as follows;

C.E=             % CO2           x 100
% CO2 + CO

2.    The temperature of the primary chamber shall be 800 ± 50o C

3.    The secondary chamber  gas residence time shall be at least 1 (one) second at 1050 ± 50o C, with 3% Oxygen in the stack gas.

4    Opacity of the smoke must not exceed 20% Viewed from 50 meters with naked eyes
5.    All the emission to the air other than steam or water vapour must be odourless and free from mist, fume and droplets.

6.    The Authority may require that the certificate holder have tests carried out by an accredited institution to determine stack and/or ground level concentrations of the following substances.

Cadmium and compounds as     Cd
Mercury                                      Hg
Thallium                                     Tl

Chromium                                  Cr
Beryllium                                    Be
Arsenic                                       As
Antimony                                    Sb
Barium                                        Ba
Lead                                            Pb
Silver                                          Ag
Cobalt                                         Co
Copper                                        Cu
Manganese                                  Mn
Tin                                               Sn
Vanadium                                     V
Nickel                                           Ni
Hydrochloric                                HCL
Hydrofluoric acid                         HF
Sulphur dioxide                           S02

7.    A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where:

DRE = [(Win – Wout)/Win]*100
Where: Win = mass feed rate of the POHC in the waste stream fed to incinerator, and
Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.

8.    The average dioxin and furan concentration in the emissions should not exceed 80ng/m3 total dioxins and furans if measured for a period of 6 to 16 hours.

Note:
All pollutant concentrations must be expressed at Oo C and 1.013 x 10 5 N/m2, dry gas and 11% oxygen correction.

Oxygen correction is computed as:

Es =     21 – Os    x EM
21 – OM

Where:    Es    = Calculated emission concentration at the standard percentage oxygen concentration
EM    = Measured emission concentration
Os    = Standard oxygen concentration
OM    = measured oxygen concentration

10    Operation    1.    Materials destined for incineration should be of known origin and composition and must be only incinerated in a furnace that is registered for the particular type of waste.

2.    A record must be kept of the quantity, type and origin of the waste to be incinerated.
3.    The incinerator must be preheated to working temperature before charging any waste.
4.    The incinerator must not be overcharged.
5.    The incinerator must be in good working order at all times and must not be used if any component fails. Any malfunction should be recorded in a log book and reported to the relevant authority.

6.    The incinerator operator and all relevant staff must be trained to the satisfaction of the relevant control authority.

11    Housekeeping    The site where the incinerator is built must:

1.    Have running water.
2.    Have a solid floor.
3.     Have lighting if 24hrs operation
4.    Have fly ash containerization and storage before disposal.

12    Health & Safety (Protective Gear)    1.    Staff handling waste must be well trained on safe handling of hazardous wastes
2.     Staff must be provided with appropriate  protective gear such as, gas mask, aprons, gumboots, helmets, gloves, goggles.

3.     Caution and Warning signs must be provided.
4.     Fire fighting equipment must be provided
5.     There should be no smoking or eating on the site.

Pet Cremation Equipments


Basic Info.

Model NO.:pet cremation incinerator cost
Export Markets:Global

Product Description

Nanjing Clover Medical Technology Co., Ltd..

A Model creature crematory burning speed from 20-400kgs a hour. Heavy duty combustion room and suit for big animal cremation.  In post combustion chamber. Virtually smoke and odor free. 

Smoke Filter Chamber with filter Virtually smoke and odor free after burningoff.

Italy original oil or gas burner, quality reliable. It fit for diesel oil, gas, gas. 

User guider, full installation and performance document for client.

Items Specification
 Model A360 / A600 / A900 / A1200 / A1500 / A2400 / A4000 / A5500
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

incinerators

incinerate biohazard waste

an incinerator which is capable of burning between 3 to 5 tonnes per day of mixed waste products, plastics, rubber, flammable putrescible waste, medical waste, rubber tyres, paper and cardboard, textiles, green timber waste etc. As some of the waste products will contain non-flammable solids, the incinerator should be capable of extracting those materials probably via a rotary kiln process. We are however  open to suggestions on the issue of the rotary kiln solution as you may have other solutions available.

It is not intended to use any fuel, such as oil or diesel, to promote the burning of the waste, as the waste products are required to be incinerated using a free burning process. Hot air however from a downstream process will be available to increase the incinerator temperature and burning rate as required. Very high temperatures in the incinerator are not necessary and are not required.

The burning of the waste products is expected to produce toxic emissions which will be cleaned via other existing downstream processes and a Post Combustion process in the incinerator is therefore not required.

The incinerator should be capable of accommodating an automatic waste feed process.We are looking for incinerator to incinerate biohazard waste of our microbiology lab. Our daily waste production is upto 20 Kg maximum and incinerator will be required on weekly basis that is 1 or 2 times a week so you are therefore requested to kindly suggest the appropriate incinerator for our lab which shall be cost effective for us regarding purchasing and maintenance cost.

Tiniest Burner 30kgs


Standard 30kgs per hr

*** Key chamber( 200Liters)

*** Second chamber

*** Mix burning chamber

*** Stainless-steel smokeshaft( 1meter)

*** Italy Produced oil burner( 2sets)

*** Dry Scrubber

*** Weight 1.7 T( can decrease to 1.0 Bunch)

Essential Spare Parts( Standard for incinerator, and Also price consist of currently):

*** 2 collections Italy Oil Heater

*** 2sets Temperature Level Probe

*** 1 Based Control Instance

*** 1 Based Air Follower

*** 1 Place Diesel Oil Tank



HICLOVER – Medical Environmental 

*** 1 Place Maintain Product


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 


Incineration of Waste for Garbage


Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

How you can find reasonable incinerator for your local website?  Incinerator isn’t a cheap equipment, normally the small scale model's price around $5, 000usd per unit and big scale model's price more than $50, 000usd per unit. So, before purchase one unit incinerator, you have to make clear after items:  A, burn what? Incinerator is a incineration equipment, function is fire waste. So what sort of waste you want to treatment?  B, small or big? This based on the waste output every day or the waste quantity per feed period, like animal size.  Incinerator use gas or oil fuel, normally, gas fuel is cheaper than oil and also the smoke cleaner than oil gas version. However, some local website don't have gas supply system.  This equipment quality structural for kinds of website, such as hospital, incinerators w2e, incinerators-manufacturers home, incineratorschina, incineretor chaina, incineretor smoke filter, and incinirator of health care hospital, environmental division, animal cremation bureaus, etc.. CLOVER Incinerator supply updated models with dual combustion room, mix combustion chamber and smoke filter room with refractory lines, along with the combustion room temperature up to 1200 deg C.

Items Specification
YDC Model YD-10C / YD-20C / YD-30C / YD-50C
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Contact Us”


Nanjing Clover Medical Technology Co.,Ltd.


burner manufacturers



1. SCOPE OF FEATURE The work specified in the agreement will certainly consist of.
1. Supply, place as well as assign a heater as given in the technological specifications
2. Specification for adherence to OSHA along with other legal demand associating with Health and wellness of staff members throughout execution of the works covered in this tender.
3. Analysis and also prep work as well as building and building of a standard burner shed with one waste storage room (see the design)

4. Stipulation of treatment and also maintenance guidebooks as well as illustrations complete with upkeep schedule and guidelines.

5. Gas oil storage tank- Light steel1500 litres ability

6. Onsite training for operation in addition to maintenance team.

CRUCIAL
Tenderers that fail to conform with this need totally will have their tenders refuted. TECHNOLOGICAL NEEDS OF THE REQUIRED BURNER

2.1 General Recap

The plant have to have 4 unique areas that show 3 principles of turbulence, home time and likewise temperature level retention.
1. Overall plant layout
2. Feed chamber/charging
3. Key burning chamber
4. Particle scrubbers
5. Acid gas scrubbers.
6. The stack/chimney.
7. Minimum capability of crucial chamber = 0.18 cubic metres
8. Dropped price (price of waste incineration) = a the very least 20 kg per human resources
9. Need to have a full dimension counterbalance filling door enabling very simple access to the main chamber for filling as well as getting rid of ash.
Supply, Setup and also Appointing of A Burner in Eastern Hydros [Web Page 28

2.2 Feeding and additionally Billing
Controlled sanitary mechanical feeding that does not negatively influence the air temperature degree in the trick as well as likewise 2nd chambers of the heater shall be made use of.
2.3 Key Burning Chamber.

a) This chamber need to be outfitted with burners that make use of low sulphur gas.
b) The chamber should ensure a marginal leave temperature degree of 850 levels centigrade.

2.4 Secondary Burning Chamber (After burner)

a) Should be fitted with heating systems that utilize low sulphur gas.
b) Assurance 2nd air supply is controlled.
c) See to it residence time is not much less than two secs.
d) Guarantee that the gas temperature level as gauged versus the within wall in the extra chamber and also not in the fire location is not much less than 1100 levels centigrade.
e) Make sure the discharged oxygen web material of the sent out gases is not much less than 11%.
f) Assurance both primary as well as second burning temperature level levels are preserved up till all waste is totally ignited.

2.5 Particulate Removers

A mechanical fragment lover need to be incorporated after 2nd burning chamber for removal of particle toxic substances entrained in the flue gas stream. The particle collection agencies may include any of the abiding by or a mix thereof:.
a) Cyclone separator.
b) Electrostatic precipitators.
c) Fabric filters.
2.6 Chimney/Stack

l) The smokeshaft need to have a marginal altitude of 10 metres above ground degree in addition to clear the acme of the framework by not much less than 3 metres for all roofs. The topography along with elevation of nearby structures within 50 metres span must be thought about.
m) The smokeshaft should certainly show up to the motorist from the feeding area.
n) The minimal leave price require to be 10 metres per second in addition to at least twice the bordering wind speed (Efflux speed = wind speed x 2) whichever is higher to make sure no down cleaning of leaving gases.
o) The point for measurement of discharges will certainly be offered.

2.7 Instrumentation

a) Tool for finding out the within wall temperature as well as likewise not heater fire temperature level must be addressed both also second as well as key chambers.
b) A additionally noticeable and distinctive alarm system requirement to be mounted to signal the operator when the second chamber temperature degree drops to listed here the called for temperature.
c) A carbon monoxide gas as well as additionally oxygen meter/recorder should be provided

d) A smoke density meter/recorder require to be supplied.
e) A strong particulate meter/recorder should certainly be provided.
f) Any sort of various other tool that may be taken into account essential.

2.9 Exhaust Province

a) Burning efficiency (C.E) shall go to the very the very least 99.00% where C.E = %Co2 x 100/ [% CARBON DIOXIDE + carbon monoxide] b) The temperature degree of the main chamber will certainly be 800 +/- 50 degrees centigrade. c) The additional chamber gas house time shall most likely to the very least 1 second at 1050 +/- 50 levels centigrade with 3% oxygen in the pile gas.
d) Opacity of the smoke demand to not exceed 20% seen from 50 metres with naked eyes.
e) All the discharge to the air besides vapor or water vapour must be odor free and without mist, fume and also grains.
f) A 99.99% devastation and removal efficiency (DRE) for every single primary all-natural hazardous element (POHC) in the waste feed where DRE [( Success – – – – Wout)/ Win] x 100 where Success = mass feed price of the POHC in the waste stream fed to burner as well as Wout = mass exhaust price of POHC in the pile prior to the launch to the atmosphere.
g) The typical dioxin and likewise furan concentration in the exhaust should not exceed 80mg/m3 overall dioxins and furans if gauged for a duration of 6 to 16 hrs.

– – – – Guidebook technological monitoring is delivered with the devices with all descriptions of failings in addition to resolutions.
Capacity/island: 4000 kg/day; 25000 kg/day; 31000 kg/day; 48000 kg/day

Burning temperature– – over 12000C

Two chambers– – minimal

Wears down– – dioxin as well as additionally significant metaly– – much better after that Kyoto procedure

Discharge– – tracking system

Waste unloiding– – straight from waste track to incinerator