Slaughter House Incinerators


Product Description

Nanjing Clover Medical Technology Co., Ltd..

Item Customer Request Example
Application Scope  
 
 
 
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc
What kind of waste?  
____, _____%
____, _____%
____, _____%
 
 
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent
if for animal/pet, indicate animal size like: cat, dog, cattle, etc
Quantity Request    
01.02.03^…unit
 
Budget    
$US Dollar.
 
 
Operating Time    
The staff work Hours per day.
Our incinerator can work up to around 18 hours per day.
Realization Date of project In ___ year  
Waste Output Capacity per Day?  
 
1000kgs Per Day^
Request waste burn rate   Capacity: 100kgs Per hour^
Request waste feed capacity   Capacity: 100kgs per feed^
Whether Natural Gas Supply Local?   Yes or No.
Local Power   If 380V and 220V valid?
Product Installation Destination  
 
Country or City name
DestinationSeaport name?   To check sea freight charge.
 
Customer    
End-Customer, Agent, Government.
 
Method of contract   Tender or Negotiation
Date of Tender limit    
How did you know our company?    
Other request or information  
 
 
 

Key Features:  * All versions with Dual combustion room.  *based on sequence * High fever, long lifetime of incinerator.  * Free or minimum installation onsite.  * High speed, from 10kgs to 500kgs per hourto 6ton daily.  *based on order  * New Design for pet animal cremation business.  * One year guarantee on incinerator and parts in stock.

nanjing clover incinerator price

Large incinerators – INDUSTRIAL INCINERATORS – specs below.

2.) Size requirement for the incinerators is 750 — 850 kg capacity

3.) The bum rate should be 80 LL 100 kg/ hour.

4) The primary chamber shouId have an operating temperature of 900 -1200 degree C.

5) The incinerator should hate a high temperature secondary chamber and 2 second gas
retention time at 850- 1150 degree C so that it is suitable for high risk materials.

6). The incinerator should have temperature monitoring and thermostat control for ease of
operation and assurance of bum temperature to confirm correct operation.

7). The incinerator should be capable of burning any of the hazardous wastes listed in the
subsequent section.

8) The incinerator should be capable of burning diesel oil and should include a larger fuel
tank (10-500 litres) and generator (3 –40 kV) set that can be carried on the trailer with the
incinerator so that the unit requires no external electrical power supply.

9.) The incinerator should be trailer mounted so that it is a po

Hazardous Waste to be Incinerated

Hazardous solid chemical:

Different types of combustible solids, used textiles, grease, and toner cartridges, chemicals
for water purification and photographic consumables and plastic material, empty
plastic/metal cans that still contain remnant hazardous material, oil absorbent.

Hazardous liquid chemical:

Mainly different types. of Acid, Paint, Varnish, Acetone, White Spirit Aromatic-less
Solvents, Synthetic Liquid for Break Systems, Aircraft De-icing Liquid, Hydraulic and
Compressor oil, Freon, used in some older refrigeration units, Insecticide liquid/spray, air
refresh spray and other similar chemicals.

Contaminated fuel:
Mainly diesel or gasoline contaminated by water or solvents.

Used and/or Contaminated oil:

Used motor oils and/or mineral oils unfit for their originally intended use. Mainly motor
and gearbox oil (approximately 80%) contaminated by a mixture of white spirit and acetone (approximately 51%), hydraulic liquid (approximately 5%).

Contaminated water:

Waste oilshvater, leaches, hydrocarbons/water mixtures, emulsions and leachate.

Contaminated soil:

Soil polluted by oil, fuel or 11 chemicals.
Contaminated soil polluted by chemicals that has to be recycled in landfill.
Contaminated soil—treated and replaced on site.

Oil Contaminated Solids
Rags, Absorbents, Cardboard, oil and fuel filters, air filters are not consider as hazardous materials.

Electronic waste:

Waste electrical or electronic appliances or assemblies, including printed circuit boards,
containing toxic material and/or heavy metal and/or emitting low radiation.

Used battery cells:

Dry battery, UPS battery or other types, unsorted waste batteries/ battery cells, containing
materials that are hazardouy.

Used lead-acid batteries:
Waste lead-acid batteries, rained/un-drained, and whole or crushed.

Hazardous medical waste:

Clinical and related waste, arising from medical, nursing or similar practices and waste
generated in clinics during the investigation or treatment of patients (bio hazard).

Expired drugs, solid:

Waste pharmaceuticals, drugs and medicines, including sensitive medicines.

Expired drugs Iiquid:

Waste liquid pharmaceuticals, different type liquid chemicals for treatment, medical
grease, and paraffin based xpired medicines.

Expired and/or contaminated fod:

Spoiled fresh food or unusable MRE’s (Meal Ready for Eat – dry food)

Onsite Training and Assem Option for Industrial Incinerators

I. The bidders should includ 1a price in their offer for training in a central location ( Goma or
Bukavu) approximately 15 staff in the operation and maintenance of the
equipment.

Smart Ash Incinerators

1. Size requirement for the incinerators is that the unit works with a 55 gallon open ended
steel drum.
2. The unit should operate wit. no fuel and use only 120V or 220V electricity for the blowers.
3. The unit should be capable of burning oil contaminated wastes and medical wastes with a moisture content of 0-15%J
4. Each unit should come witH two steel drums, so that a spare drum is available.

Spare Parts Option
If there are any vendor suggested spare parts , that list and price should be included as an option in the offer.

incinerator capacity calculation


Test shall be conducted by factory authorized representative of incinerator manufacturer.

 

  1. Demonstrate required weight reduction of specified waste. Waste shall be fed in a single batch to the unit.

After termination of manufacturer’s predicted burning period, inspect and weigh the residue.

 

  1. Emissions testing may be deleted if not required by state or local authorities. List all additional tests

required by state and local emission authorities.

 

  1. Emissions:

 

  1. Test shall be conducted by independent testing organization provided by Contractor which has a minimum of three

years experience in emissions testing and which has been approved by the pollution control authority that has

jurisdiction.

 

  1. Conduct tests during the reduction of waste test specified above.

 

  1. Test methods must comply with EPA Reference Method 5, 40 CFR 60, Appendix B, “Determination of Particulate

Emissions from Stationary Sources”.

 

  1. Demonstrate that incinerator complies with specified emission limits.

 

  1. Sound Levels: Demonstrate conformance to sound level limitation.

 

  1. Report: Furnish complete written report (three copies), which includes test data, calculations, results

compared with requirements, list of personnel, and other pertinent information. Furnish report within three weeks of

test date.


All-in-one waste incinerator/ski slope/power station to be built near Copenhagen

All-in-one waste incinerator1

When their central waste incinerator packed up, five municipalities in Denmark were left with two options. They could invest in another incinerator. Or, they could do something completely different.

In true Danish style, the group of authorities near Copenhagen chose option B, and commissioned New York architecture firm BIG to design something new. The 80m tall structure will burn 400,000 tonnes of waste a year; it’ll also generate enough electricity for 50,000 houses, and enough heat for 120,000.

Best of all, the Amager Bakke plant, as it’ll be called, will also put its 41,000 square metres of roof to good use. It’ll double as a small mountain, complete with trees, hiking trails and 500m-worth of ski slope coated with synthetic snow.

All-in-one waste incinerator 2
Skiers gambol atop the giant furnace.

Keen to prevent visitors becoming too complacent or joyful, however, the architects have built in what they call a “gentle reminder of the impact of consumption”: the power plant’s main stack will emit a single smoke ring whenever a tonne of carbon dioxide is produced. We assume this rendering of the building in the throes of what appears to be a nuclear winter is meant to serve the same purpose.
All-in-one waste incinerator 3

The building, around 5km from Copenhagen, is currently under construction and should be completed by 2017. Now, they just need to come up with a clever portmanteau to describe the new structure. “Skincinerator” doesn’t quite cut it.

500kg/day thaw ability heater


at acinerator using 300 kg/ hr by twin filter wet and dry.Pet Cadaver Incinerator upto 80 kg, gas run resembles. Pet waste heating unit with ability pertaining to 40Kgs. We will utilize this item to thaw the creature is still equally technique (not ill aninal). Can you please beforehand me quote for heating unit which appropriates for alternative Neighborhood using a people of 200,000 people including various other conventional neighborhood waste to shed. Technical demands information sheet{
(adsbygoogle = window.adsbygoogle || []).push({});|}

Listing in addition to also cost of All of the spares known for annually{
(adsbygoogle = window.adsbygoogle || []).push({});|}
List in Addition to similarly quantities of consumables called for monthly

2 burners one with 500kg/day lose capacity an additional one with 1000kg/day thaw capacity

1 x Electrode

1 x Gas Filter

1 x Photocell

1 x Versatile pipeline

1 x Nozzle

1 x Control Box


Hospital Incinerators (TS30 PLC)


Product Description

Nanjing Clover Medical Technology Co., Ltd..

Currently we provide different series for local customer requirements and design upgraded incinerator with our leading technology. The upgraded design feature of our range of incinerators create them one of the most cost effective on the planet. 

Items/Model TS30(PLC)
Burn Rate 30 kg/hour
Feed Capacity 60kg
Control Mode PLC
Combustion Chamber 330L
Internal Dimensions 75x75x60cm
Secondary Chamber 180L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.5Kw
Oil Consumption (kg/hour) 10.2–20
Gas Consumption (m3/hour) 9.8–20
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 100L
Feed Door 55x50cm
Chimney 5Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800–1000 degree
2nd. Chamber Temperature 1000-1200 degree
Residency Time 2.0 Sec.
Gross Weight 3000kg
External Dimensions 175x120x140cm

Key Features:  * All models with Dual combustion chamber.  * High temperature, long lifetime of incinerator.  * Free or minimum installation on site.  * High burn rate, from 10kgs to 600kgs per hour, up to 10ton per day.  * PLC Control Plane for Intelligent functioning.  * One year warranty on incinerator and parts in stock.

hospital incinerator design


INCINERATEUR DE DECHETS HOSPITALIER hospital incinerator design

SPECIFICATIONS TECHNIQUES.
Capacité destructive de 55 Kg/h jour de déchets hospitaliers  avec un p?.c. i jusqu’à 3.200 Kcal/Kg
1)Type de déchet

hospitalier
2)Pouvoir calorifique inférieur                                                                        3.200 kcal/kg
3)Humidité                                                                                                          20%
4)Teneur  en cendres et/ou inertes                                                                       8%
5)Capacité destructive nominale                                                                         55 kg/h
6)Volume chambre de combustion                                                                     1,65 m3
7)Volume chambre postcombustion                                                                   2.1 m3
8)Temps  transit des fumées en post combustion /sec.                                       <2
9)Température minimale  en postcombustion                                                     1.100° C
10)Teneur d’oxygène libre en postcombustion                                                     6%
11)Attribution refuse confectionné en sachets                                                     HDPE
12)Dispositif de chargement?: hydraulique?; capacité de charge                           0.5 m3

13)Combustible prévu                                                                                           Gasoil
14)Br?leur en chambre de combustion                                                                  nbr?: 1
15)Br?leur en chambre de postcombustion                                                           nbr?: 2

CONSTITTUTION DE L’APPAREIL.
1.CHARGEMENT
Système de chargement hydraulique afin de pouvoir charger le four en toute sécurité même durant son  fonctionnement et

aussi assurer la puissance destructive globale de 450 kg/j?
Le système comprend?:
1-1Trémie de chargement de forme parallélépipédique de 0,5 m3 de volume, réalisée en t?le d’acier, bridés sur la paroi

frontale de la chambre de combustion et munie d’un couvercle à charnières  actionné par vérin hydraulique?.
Dimensions?:
oLongueur 1200 mm
oHauteur 700 mm
oLargeur  600
1-2Un poussoir hydraulique  assurera le chargement de la chambre de combustion
1-3 Une  porte de chargement  de la chambre de combustion constituée  d’une  guillotine  à vérin hydraulique  revêtue

de réfractaire
1-4Un central  hydraulique pour piloter tous les vérins de commande, comprenant?: réservoir, pompe, électrovannes et

tuyauteries

2.CHAMBRE DE COMBUSTION PRIMAIRE

2-1- Le bati est une  structure métallique cylindrique revêtue intérieurement  d’une couche d’isolant et d’une

couche de réfractaire.
2-2-Volume intérieur?: 1,65 m3
2-3-Aménagement
?portillon de décharge  des cendres?:  frontal?; monté sur double charnière et revêtu de réfractaire avec hublot

d’inspection
?La connexion à la chambre de chargement est revêtue de réfractaire
?La connexion  de la   chambre de combustion et de la chambre de post combustion est revêtue de réfractaire
?Installation des bruleurs
?Installation  du système  de distribution de l’air comburant
?Installation des  sondes  de mesure de la température
?Le bac de récolte des cendres  est en acier au carbone sur roulettes, équipé de racloir métallique permettant

l’évacuation manuelle des cendres
3.   BRULEUR DE LA CHAMBRE DE COMBUSQTION
Un bruleur de type à une flamme à l’air soufflé, alimenté par gasoil, équipé des dispositifs de sécurité  Puissance

thermique installée 165 KW.
4. AIR COMBURANT
Le système de distribution et dosage de l’air primaire en chambre de combustion comprend?:
?Ventilateur centrifuge
?Canalisations de distribution air
?Systéme de distribution d’air à 2 canaux
?Soupape de régulation de l’air motorisé selon les phases de cycle de fonctionnement et de la température

5. CHAMBRE DE POST COMBUSTION
5-1- Chambre de post combustion est installée au dessus du foyer  de combustion , elle  est constituée d’un

cylindre  métallique  revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires.
5-2- Volume intérieur?: 2,1 m3
Est dimensionnée pour pouvoir  garantir  un temps de fumée de 2 secondes à 1100°C avec un pourcentage d’oxygène libre

d’au moins 6 %.
5-3 -Accessoires
?Trappe de visite boulonnée frontal pour permettre l’inspection périodique
?La liaison à la chambre de combustion est tapissée de réfractaire
?Installation les br?leurs
?Installation des sondes de mesure température
6. PRODUCTION DE L’AIR COMBURANT DE LA CHAMBRE DE POST COMBUSTION
?Ventilateur centrifuge
?Tuyauteries  de distribution d’air
?Série  de vannes de distribution  d’air
?Soupape de régulation de l’air soufflé  asservi par la sonde du débit  d’ oxygène

7. BRULEUR DE LA CHAMBRE DE POST COMBUSTION
Sont prévus 2 br?leurs du type à l’air soufflé au gasoil équipés  des dispositifs de sécurité.
A la mise en route du four les deux  br?leurs sont  allumés pour assurer la température minimale d’au moins 1100°C?;

ils restent en marche successivement  pour maintenir la température constante.
Puissance thermique installée (290 + 350) KW.

8. CHEMINEE D’EVACUATION
Constitué par un conduit métallique vertical de 8 m de long installée au-dessus de la  chambre de PC, diamètre 630 mm

en t?le d’acier au carbone avec garnissage intérieur en réfractaire

9. ARMOIRE ELECTRIQUE DE COMMANDE ET REGULATION
Composée  de?:
?Circuit  380 V- 50 HZ-3 phases
?Voyant sous tension
?Commande d’arrêt  général
?Voyant état des bruleurs
?Affichage des  températures  des deux chambres
?Minuterie des temps des cycles.
?Une variation des vitesses des ventilateurs
?Le tableau et les cablages sont prévus aux règles CEI avec protection IP 55
?Microprocesseur pour le contr?le et la régulation des températures, ainsi que les cycles d’opération
?Cablages réalisés selon les règles CEI.

10. INSTRUMENTATION DE CONTROLE ET DE MESURAGE CONTINU
Les  dispositifs suivants  sont prévus?:
1)Thermocouples pour la mesure de la température  en chambre de combustion? et postcombustion, à la sortie de

l’échangeur dans la section d’entrée du filtre
2)Système de mesure de la concentration d’oxygène dans les fumées humides a la sortie de la chambre de postcombustion

constitué de?:
?Sonde de mesure de l’oxygène à l’oxyde de zirconium
?Pompe à la membrane
?débitmètre


Mobile Incinerator


Basic Info.

Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Nanjing Clover Medical Technology Co., Ltd..

Application Scope: 

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Hospital& clinic: Medical waste, surgical waste- Syringe, Infusion Set, Dressing, Bio-Waste, Medicine.  Community & Sea Port & Station: Municipal Waste, etc.  Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation