![]()
Version
YD-30 Mobile Type
Photo
![]()
![]()
Burning Rate
Average 30 kgs/hour
Feed Ability
Typical 60 kgs/feeding
Chamber Text
Stainless Steel
Mobile Feature
With Wheel and also Brake
Primary Burning Chamber
280 Liters
Secondary Combustion Chamber
150 Litres
Mix Burning Chamber
Yes
Feed Setting
Handbook
Voltage
220V
Power
1.5 Kw
Gas Kind
Diesel Oil
Burner
Italy Original
Oil Intake (Diesel Oil)
Standard 13.3 kg/hour
Inner Dimensions
80 x 60 x 60cm (main chamber)
Exterior Dimensions
125 x 90 x 260cm (without smokeshaft)
Temperature Level Display
Yes
Oil Container Capacity( if oil fuel)
100 Litres
Door Opening
50 x 50cm
Smokeshaft Size
2.0 Meters
Chimney Type
Stainless-steel
Equipment Gross Weight
1600 kgs
Operation Technical Specifications
Key Chamber Temperature
800 ℃–– -1000 ℃
Secondary Chamber Temperature
1000 ℃ -1200 ℃
Residency Time
2.0 Sec.
Burning Effectiveness
> 98%
Waste Lower Calorific Power
3000Kcal
2020-06-28
Waste Incineration HICLOVER Model TS75
Items/Model
TS75( PLC)
Picture
![]()
Principle
Waste Incineration
Burn Price
Average 75 kg/hour
Feed Ability
Typical 150kg
Control Setting
PLC( Programmable Reasoning Controller Incinerator)
Burning Chamber
770L
Inner Measurements
100x81x95cm
Second Chamber
385L
Smoke Filter Chamber
Yes
Feed Mode
Handbook
Voltage
220V
Power
0.7 Kw
Oil Consumption (kg/hour)
Typical 16.9
Gas Consumption (m3/hour)
***
Temperature Level Monitor
Digital Display
Temperature Level Security
Yes
Oil Storage Tank
100L
Feed Door
99x91cm
Smokeshaft
3Meter
Smokeshaft Type
Stainless-steel
1st. Chamber Temperature Level
800 ℃–– -1000 ℃
2nd. Chamber Temperature
1000 ℃ -1200 ℃
Residency Time
2.0 Sec.
Gross Weight
4500kg
External Measurements
2.30 mx1.30 mx2.55 m
Nanjing Clover Medical Technology Co., Ltd.
Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China.
Key Features: * All versions with Dual combustion chamber. *according to order Stainless Steel chimney/stack, long lifetime. *according to order * High temperature, long lifetime of incinerator. * Free or minimum installation onsite. * High burn rate, from 10kgs to 500kgs per hourto 6ton per day. *according to order New Design for pet animal cremation business. * One year warranty on incinerator and parts in stock.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
The mill workshop local in liuhe Economic Development Zone, suburb of Nanjing and company office local in downtown region. Presently, incinerator line products marketplace cover former Soviet Union region, Africa countries, Asia countries and Middle East region. From year 2010, we negotiated with updated technologies from Europe and America producers and establish alliance relationship in the land of China marketplace. Unfortunately, competition in different countries market, nation discrimination and worries of intellectual property rights cause collapse finally. Presently, we investment more attempt, funds and technology development in our brand, we’re to be one of the most significant incineration equipment in the world. We have trading branch company for expert export company service.
heaters that can manage Bio-Medical waste (red bag) from lab with level 2 in addition to 3, pet search study, and wellness centers. There are additionally a percentage of Pharmaceutical waste to be damaged. I would certainly like your referrals on what heaters would surely deal with these demand depending upon the sticking to routine monthly kgs of substance.
Website 1– – 4,650 Kgs routine monthly (I have suggest that I put up two burners at this location given that It’s a medical research center along with the use Is Quite large )
Web Site 2– – 1000Kgs each month (this center deals additional with animal study study nonetheless also has red bag waste from their study study side, they now have a Huge animal carouse heater)
Website 3– – 1000Kgs each month (this centre is a region medical care centre with bio-waste from Managing people)
A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
Refractory concrete :
Thickness : ≥150 mm
Nature: 65% of Al203
Insulate in fibrous panel :
Thickness: ≥85 mm
Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition,
permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19.A control box ensuring the complete cycle of combustion.
20.Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and
following the control of the automatic cycle.
21.Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.
batch de ashing.
22.The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23.The installed incinerator must bear a one year guarantee.
24.The supplier shall perforn an onsite installation of the incinerator.
the factory; it will consist of curative and preventive maintenance, and the use of machine, etc
Technical requirements for shedding gadget, animal waste incinerator supplier
1. 2 systems are required to be mounted in the south of the Kingdom of Saudi Arabia. Both systems will be utilized by tailored authority to melt various kind of medications. All need gadgets require to be given.
2. Warranty: booth systems need to be supplied 3 years service warranty from the day of approval. All called for extra components, preventative maintenance repair work as well as likewise corrective upkeep demand to be consisted of in the price as well as supplied to the client.
3. All needed electric in addition to water links need to be offered.
4. Both systems need to be of superior quality as well as must be ecological friendly.
5. The ability of each system need to be up to 100 kg/hr.
6. The system has to have actually automated feeding.
7. Each system needs to includes two melting areas, one primary area for melting the medication and additionally another room for melting the gases that release as an outcome of major burning.
8. The oven should be created from steel that is rust resistance and with density not less than 6 mm.
9. Each system needs to be of high trusted in shedding various kind of medicines, and also should certainly have 99.9% effectiveness for melting natural products.
10. Waste items need to not go beyond 5%.
11. System needs to have automated ignition system.
12. System requires to use diesel (HSD) as gas and should not consume greater than 8 to 10 lt/hr.
13. Each system ought to be given with fuel storage tank of measurement appropriate to run the system for one total day.
14. The temperature level in the primary area must be 850 C ± 50 C. the system require to additionally be qualified to operate as long as 1050 C ± 50 C. the system should can proceeds procedure in addition to needs to be supplied with concrete layer insulator with proper thickness.
15. Stove ought to be offered with cozy insulator to permit simple operation.
16. Gas should certainly stay in the additional location for not above 1.5 second.
17. The primary burning area have to contend the very least 2 heating systems.
18. The 2nd burning location require to have one heating system.
19. Each system must have doors for ash, leave for air to the smokeshaft and also windows to allow looking inside as well as for upkeep.
20. Each system must have filtering system for gas handling with 2 tanks utilizing average water. Each water container need to have capacity of 1000 lt and should certainly be repaired to the system in addition to provided with water degree sign.
21. Each system has to have unique technology for dividing waistline items and additionally humidity after gas handling.
22. Each system requires to have cooling off capability after treatment.
Each system m should be supplied with exhaust pipe with 250 mm size and also 10 m high. The base of the exhaust system ought to be 1000 mm. The exhaust system should be provided with stress indicator.
24. Electric power: require to be 220 volt, 3 phase, 60 Hz, as well as the electric motor needs to not be much less than 15 HP.
25. Each system has to be supplied control panel and also signs as well as required protection devices as well as alarm. The control panel ought to expose at the very least temperature degree in both the secret as well as added locations and additionally injectors of the filters as well as additionally tons.
26. Each system should certainly be provided with safety and security system for any break down or issue of any type of type of part of the system.
27. The following individual safety tools have to be offer:
a.Heat immune garments for 20 people.
b.Heat immune goggles for 20 persons.
28. All elements of each system should be painted with silver color that is warmth resistant.
1 Basic Plant Design An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated sections may include but not limited to:
Overall plant layout.
Feed chamber/ charging
Primary Combustion Chamber.
Secondary Combustion Chamber.
Particulate Scrubbers
Acid Gas Scrubbers
The stack/ chimney.
2 Feeding And Charging Controlled hygienic, mechanical or automatic feeding methods have to be used which will not influence the air temperature in the primary and secondary chambers of the incinerator negatively.
No waste is to be fed into the incinerator:
1. Until the minimum temperatures have been reached.
2. If the minimum combustion temperatures are not maintained.
3. Whenever the previous charge has not been completely combusted in the case of batch feeding.
4. Until such time as the addition of more waste will not cause the design parameters of the incinerator to be exceeded.
3 Primary Combustion Chamber The primary combustion chamber must:
1. Be accepted as the primary combustion zone.
2. Be equipped with a burner/s burning gas/fuel or low sulphur liquid fuels. Other combustion methods will be judged on merits.
3. Ensure primary air supply is controlled efficiently
4. Ensure minimum exit temperature is not less than 850oC
4 Secondary Combustion Chamber (Afterburner). The secondary combustion chamber must:
1. Be accepted as secondary combustion zone.
2. Be fitted with secondary burner/s burning gas or low sulphur liquid fuel or any suitable fuel.
3. Ensure secondary air supply is controlled efficiently.
4. Ensure flame contact with all gases is achieved.
5. Ensure residence time is not less than two (2) seconds.
6. Ensure the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100oC.
7. Ensure the oxygen content of the emitted gases is not less than 11%.
8. Ensure both primary and the combustion temperatures are maintained until all waste has been completely combusted
5 Particulate Removers A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:
Cyclone separator
Electrostatic precipitators
Fabric filters
6 Chimney / Stack 1. The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings within 50 meters radius should be taken into account.
2. If possible the chimney should be visible to the operator from the feeding area.
3. The addition of dilution air after combustion in order to achieve the requirement of these guidelines is unacceptable.
4. The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting gases.
5. Point for the measurement of emissions shall be provided.
7 Instrumentation Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers.
2. An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to below the required temperature.
3. In addition to the above the following instruments may also be required.
A carbon monoxide and/or oxygen meter/recorder
A smoke density meter/recorder
A gas flow meter/recorder
A solid particulate meter/recorder
Any other instrument or measurement that may be considered necessary
8 Location / Siting 1. Must be sited in accordance with the relevant local municipal authority planning scheme, the topography of the area and be compatible with premises in the neighborhood,
2. Must be housed in a suitably ventilated room.
9 Emission Limits 1. Combustion efficiency:
Combustion efficiency (CE) shall be at least 99.00%
The Combustion efficiency is computed as follows;
C.E= % CO2 x 100
% CO2 + CO
2. The temperature of the primary chamber shall be 800 ± 50o C
3. The secondary chamber gas residence time shall be at least 1 (one) second at 1050 ± 50o C, with 3% Oxygen in the stack gas.
4 Opacity of the smoke must not exceed 20% Viewed from 50 meters with naked eyes
5. All the emission to the air other than steam or water vapour must be odourless and free from mist, fume and droplets.
6. The Authority may require that the certificate holder have tests carried out by an accredited institution to determine stack and/or ground level concentrations of the following substances.
Cadmium and compounds as Cd
Mercury Hg
Thallium Tl
Chromium Cr
Beryllium Be
Arsenic As
Antimony Sb
Barium Ba
Lead Pb
Silver Ag
Cobalt Co
Copper Cu
Manganese Mn
Tin Sn
Vanadium V
Nickel Ni
Hydrochloric HCL
Hydrofluoric acid HF
Sulphur dioxide S02
7. A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where:
DRE = [(Win – Wout)/Win]*100
Where: Win = mass feed rate of the POHC in the waste stream fed to incinerator, and
Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.
8. The average dioxin and furan concentration in the emissions should not exceed 80ng/m3 total dioxins and furans if measured for a period of 6 to 16 hours.
Note:
All pollutant concentrations must be expressed at Oo C and 1.013 x 10 5 N/m2, dry gas and 11% oxygen correction.
Oxygen correction is computed as:
Es = 21 – Os x EM
21 – OM
Where: Es = Calculated emission concentration at the standard percentage oxygen concentration
EM = Measured emission concentration
Os = Standard oxygen concentration
OM = measured oxygen concentration
10 Operation 1. Materials destined for incineration should be of known origin and composition and must be only incinerated in a furnace that is registered for the particular type of waste.
2. A record must be kept of the quantity, type and origin of the waste to be incinerated.
3. The incinerator must be preheated to working temperature before charging any waste.
4. The incinerator must not be overcharged.
5. The incinerator must be in good working order at all times and must not be used if any component fails. Any malfunction should be recorded in a log book and reported to the relevant authority.
6. The incinerator operator and all relevant staff must be trained to the satisfaction of the relevant control authority.
11 Housekeeping The site where the incinerator is built must:
1. Have running water.
2. Have a solid floor.
3. Have lighting if 24hrs operation
4. Have fly ash containerization and storage before disposal.
12 Health & Safety (Protective Gear) 1. Staff handling waste must be well trained on safe handling of hazardous wastes
2. Staff must be provided with appropriate protective gear such as, gas mask, aprons, gumboots, helmets, gloves, goggles.
3. Caution and Warning signs must be provided.
4. Fire fighting equipment must be provided
5. There should be no smoking or eating on the site.