NB.; Civil functions as well as any various other applicable solutions for the installation as well as training of drivers need to be contained in the burner’s rate.
Requirements for the shelter of the burner:
House of the incinerator comprehensive in deal (your home should have toilet as well as hand washing centers as well as firefighting). The size of the shelter shall quantify 4 meter by six meter and will be provided with appropriate air ventilation.
This substance as well as equipment should include at the drop of the burner: foundation in debris stone, isolation roof covering versus humudity; elevation together with block of 20 centimeters (bloc concrete), continuing lintel (linteau) in strengthened concrete; steel frame (charpente en alloy ); roofing covering in sheet B.C.A. 28 BG
25. The technical training of drivers will need to be supplied and provided by a professional from the.
> Nature: Calcium silicate.
6. The incinerator has to avoid the launch of black smoke as well as fine dust, (Smokeless) throughout the.
8. It should be able to hold exhaust at the next burn with gas residence of not much less than two seconds.
* A timer with adjustable temporization for the coverage of every heater.
– The Temperature levels of combustion: Minimum will be 850 ° C as well as maximum 1400 ° C. – Message combustion: > 1100 ° C.
Temperature outside sheet steel.
Control box watertight to grime, such as:.
Ought to be Automatic or hand-operated put de ashing. Refine Filtering system: Scruber to be mentionned as optional
23. Discharge Standards Compliance: BS 3316 or comparable conventional
23. Ability to treat Plastic: Not less than 40% by weight
24. The provider should give sets of additional parts of very first necessity as well as consumable of these.
Having a high substance of aluminum and shields blocks in order to make sure a minimum.
* A regulatory authority with watch for the temperature of postcombustion.
Carried out by valves as well as following the constraint of the automatic cycle. Controls as well as guidelines:.
valve.
* An extra shot of air to be sure excellent oxygen web content.
19. A control box which makes certain the whole cycle of combustion. Fan:.
* A regulator with watch to your temperature level of combustion,.
>> Thickness: > 85 mm.
5.
* Perfectly tight doorway to the hand-operated loading of waste. The loading ought to be Guidebook, Place.
* Plate of burning Carborundum, preventing the dealing with glass as well as slags.
18. A chamber of post burning of gases.
* Carcass in strong sheet steel with help of link.
10. The lower volt electricity (L.C.P) of this waste will surely be 3,500 kcal/kg.
incinerator. The installed burner has to birth a 1 year warranty.
> Thickness: > 100 mm “.
>> Character: 65% of A1203.
14. Heater procedure need to be Automatic On/Off.
– Protect in fibrous panels.
* A gadget of shot air allowing a entire recombustion of gases,.
Private centers, research labs, institutes, etc…….
2. It should Be Able to operate not less than 10 hours/day
22. The supplier should give sets of extra parts of very first necessity as well as consumable of the.
incinerator.
23. The installed burner has to birth a one year warranty.
24. The supplier will perforn an onsite installation of the burner.
25. The technical training of drivers will need to be provided and also provided by a professional from the.
manufacturing facility; it will certainly consist of medicinal as well as precautionary maintenance, and making use of equipment, etc
NB.; Civil works as well as any various other relevant solutions for the installment as well as training of drivers need to be included in the burner’s rate.
Requirements for the shelter of the burner:
House of the incinerator comprehensive in deal (your house must have toilet as well as hand washing centers and also firefighting). The dimension of the shelter shall measure 4 meter by six meter and shall be offered with appropriate air ventilation.
This material as well as equipment must include in the shed of the burner: foundation in debris rock, isolation roof covering versus humudity; elevation with block of 20 centimeters (bloc concrete), continuing lintel (linteau) in strengthened concrete; steel framework (charpente en metal); roof covering in sheet B.C.A. 28 BG