incinerator type of pyrolytic medical waste incinerator capacity

Including:Incinerator: Structure to be specified
The mark to be specified
Water temperature: 800 to 1000 ° C;
Refractory
Temperature of more than 1100 ° C + obtained;
Capacity: 20-50 kg / hour
Fireplace: 4 to 6 meters high;
Dimension 70 cmx70 crn
Height: 1.10 meters
Fuel: coal;
Aspiration: natural

– A receiving cage for biomedical waste;

– A combustion chamber with a chimney with a filter to retain the ashes;

Chimney section: about 300 cm; With a minimum height of 6 m

Door size: approximately 50×60 cm

Supplied with a 500 liters fuel tank and all necessary accessories for installation.
–                          INCINERATOR for pharmaceutical waste treatment with                  a scrubbing system

With the following technical data:

1.      One pharma solid waste incinerator unit containing two combustion chambers and based on steel base with scrubbing

system.

2.      Working hour /day: minimum 10 hours/day.

3.      Capacity: Approximated 150 kg/hr. Over 10 hrs.

4.      Wastes characteristics:

·         BULK density: 70 – 100 kg/ bm³.

·         Calorific value: 2000-3000 kcal / hr.

·         Moisture content: 20-30%by weight.

·         Ash content: 2 – 8 % by weight.

·         Plastic content: 15-20 % by weight.

5.      Two combustion chambers.

6.      Operating temperatures:

·         First chamber: not less than 700 – 800 °c.

·         Second chamber: not less than 1200 °c (during steady operation).

7.      The burners should be automatically switched off if any of the combustion chambers doors is open.

8.      The burners of the first and second combustion chambers are selected for burning diesel oil (light fuel).

9.      Automatic loader and unloader to be provided.

10.     Exhaust gases to be comply with International Environmental code and requirements.

hospital incinerator manufacturer

Up to 600kgs per ten-hour day of Type IV pathological waste or red bag waste rated at 2200 BTU’s per kg, based on batch

loading twice daily.
Incinerator, 20 kg/hr  Burn Capacity (min. 1200 kgs. Waste Feed Capacity per day) (4-6 hours operations) (Power Supply

380V, 50Hz, 3Ph)
Capacity: 30 kg/hr.

Number item: 01 unit

Could you please send us cataloge detail for Pet Cremation of dogs, cats.

– Please services require: General about Cremation system which is suitable
for your products, technical transfer and training for operators.
Containerized Incinerators Operational Capabilities • PROCESS 1+ TONS / DAY • OPERATED WITH LIMITED TRAINING • REGULAR

MAINTENANCE CAN BE COMPLETED WITH LIMITED TRAINING • COMPLIES WITH EURO / OR US-EPA EMISSION STANDARDS • ABILITY TO BURN

WASTE LUBRICANTS (POL) • HANDLE ORGANIC SOLIDS (TO INCLUDE RMW) • DEPLOYABLE • MOBILE • 24 HRS OF CONTINUOUS USE •

AUTOMATIC LOADING SYSTEM • AUTOMATED ASH REMOVAL SYSTEM • GAS SCRUBBING SYSTEM • 95% REDUCTION OF SOLID WASTE • OPERATE

OFF DIESEL OR FUEL OIL • CAPABLE OF BURNING 4 UNITS OF WASTE PER UNIT OF FUEL • ABLE TO TAKE ALL COMBUSTIBLE WASTE TO

INCLUDE: PAPER, PLASTIC, CARDBOARD, FOOD, USED OILS, SLUDGE, OILY RAGS, WOOD PALLETS. • NO PRE-TREATMENT OF WASTE

REQUIRED • VENDOR REPAIR OFFERED AT POINT OF SHIPMENT • FIVE (5) YEAR COMPONENT WARRANTY FROM DATE OF ACCEPTANCE

Technical Specifications • OPERATION MANUAL AND TRAINING MANUAL FOR EACH INCINERATOR • SET UP AND INSTALLATION

INSTRUCTION MANUALS • BLUE PRINT/ SCHEMATIC PROVIDED THAT OUTLINES THE PHY SICAL DIMENSIONS OF THE 20’ INCINERATORS •

INCINERATORS COMPOSED WITH HEAVY DUTY WELDED CONSTRUCTION • OPERATED AND TRANSPORTED IN 20’ INCINERATORS (CONTAINERS) •

FULL FRONT AND OPTIONAL REAR ACCESS • PRIMARY / SECONDARY TEMPERATURE CONTROLS • COMBUSTION AIR DAMPER • VAPOR TIGHT

LIGHT FIXTURES & 120V OUTLET • OUTDOOR PLU-IN RECEPTABLE FOR ELECTRICAL SOURCE • OUTDOOR FUEL TRAIN WITH SHUT-OFF • LOAD

RAMP • SKID – MOUNTED FUEL TANK • ELECTRICAL AND FUEL OIL CONNECTORS • CONTROL PANEL AND AIR LOUVER • AIR MANIFOLD

ACCESS AND UTILITY BULKHEAD • GALVANIZED SHIPPING COVERS • FUEL, WATER AND OIL CONNECTOR LINES • PRIMARY AND SECONDARY

BURNERS • FULLY INTEGRATED PLC CONTROL SYSTEM • FACTORY TESTED, WIRED PRIOR TO SHIPMENT • MOBILITY: NO HEAVY LIFT

EQUIPMENT NEEDED FOR SET UP OR TEAR DOWN • HEIGHT RESTRICTED TO THE HIGHEST POINT ON BASE OR UNDER 15FT TALL

Incinerators – 2


Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER
Origin:Nanjing
Production Capacity:1000 Sets Per Year

Product Description

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

PLC Incinerator (TS50 PLC)


Basic Info.

Model NO.:TS50 PLC
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:Clover
Packing:Full Container
Standard:50 kg per hour
Origin:China
Production Capacity:1500 Units/Year

Product Description

Items/Model TS50(PLC)
Burn Rate 50 kg/hour
Feed Capacity 100kg
Control Mode PLC
Combustion Chamber 560L
Internal Dimensions 100x80x70cm
Secondary Chamber 280L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.7Kw
Oil Consumption (kg/hour) 12.1–24
Gas Consumption (m3/hour) 9.9–26.1
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 100L
Feed Door 70x55cm
Chimney 5Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800–1000 degree
2nd. Chamber Temperature 1000-1200 degree
Residency Time 2.0 Sec.
Gross Weight 4500kg
External Dimensions 230x130x155cm

medical waste diesel incinerator

medical waste diesel incinerator Burning Rate:47.5–50kg/hour
Minimum Operating Temperature:850o C(primary combustion)
Maximum Operating Temperature:1450 oC(Afterburner chamber)
Secondary Burning Capacity:Compulsory
Density Insulation:20mm High
Refractory Casting:Minimum 65mm
Heavy duty refracting lining to withstand:1500 oC
Average burn out time :maximum:3 hrs
Fuel type:Diesel
Fuel Consumption in L/hr:7.5 to 9
Residence time in secondary chamber:2sec
Residue ash post 100kg:Max 3.8kg
Device for preventing infectious spatter and/or cross-contamination by safely sterilizing needles, rings, etc. by infrared heat.
Electrical characteristics
1) A 120V, 60Hz mono-phase electrical source with line connection plug NEMA 5-15 type.
2) Protections against over-voltage and over-current line conditions.
3) Compliance with applicable Haitian standards and regulations.

Operational characteristics
4) Fast complete sterilization in around 5-7 s.
5) Fully isolated quartz/ceramic tube, to grant safety for the user (no open flame).
6) Working temperature around 820°C.
7) Mounted on a stable base, as per example below.

waste incinerator manufacturers china


5-1- Chambre de post combustion est installée au dessus du foyer  de combustion , elle  est constituée d’un

cylindre  métallique  revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires.

5-2- Volume intérieur?: 2,1 m3

Est dimensionnée pour pouvoir  garantir  un temps de fumée de 2 secondes à 1100°C avec un pourcentage d’oxygène libre

d’au moins 6 %.

5-3 -Accessoires

?Trappe de visite boulonnée frontal pour permettre l’inspection périodique

?La liaison à la chambre de combustion est tapissée de réfractaire

?Installation les br?leurs

?Installation des sondes de mesure température

  1. PRODUCTION DE L’AIR COMBURANT DE LA CHAMBRE DE POST COMBUSTION

?Ventilateur centrifuge

?Tuyauteries  de distribution d’air

?Série  de vannes de distribution  d’air

?Soupape de régulation de l’air soufflé  asservi par la sonde du débit  d’ oxygène

 

  1. BRULEUR DE LA CHAMBRE DE POST COMBUSTION

Sont prévus 2 br?leurs du type à l’air soufflé au gasoil équipés  des dispositifs de sécurité.

A la mise en route du four les deux  br?leurs sont  allumés pour assurer la température minimale d’au moins 1100°C?;

ils restent en marche successivement  pour maintenir la température constante.

Puissance thermique installée (290 + 350) KW.

 

  1. CHEMINEE D’EVACUATION

Constitué par un conduit métallique vertical de 8 m de long installée au-dessus de la  chambre de PC, diamètre 630 mm

en t?le d’acier au carbone avec garnissage intérieur en réfractaire

 

  1. ARMOIRE ELECTRIQUE DE COMMANDE ET REGULATION

Composée  de?:

?Circuit  380 V- 50 HZ-3 phases

?Voyant sous tension

?Commande d’arrêt  général

?Voyant état des bruleurs

?Affichage des  températures  des deux chambres

?Minuterie des temps des cycles.

?Une variation des vitesses des ventilateurs

?Le tableau et les cablages sont prévus aux règles CEI avec protection IP 55

?Microprocesseur pour le contr?le et la régulation des températures, ainsi que les cycles d’opération

?Cablages réalisés selon les règles CEI.

 

  1. INSTRUMENTATION DE CONTROLE ET DE MESURAGE CONTINU

Les  dispositifs suivants  sont prévus?:

1)Thermocouples pour la mesure de la température  en chambre de combustion? et postcombustion, à la sortie de

l’échangeur dans la section d’entrée du filtre

2)Système de mesure de la concentration d’oxygène dans les fumées humides a la sortie de la chambre de postcombustion

constitué de?:

?Sonde de mesure de l’oxygène à l’oxyde de zirconium

?Pompe à la membrane

?débitmètre

 

An Incinerator is to be supplied by the Contractor on a rental basis at a location established by the Company. The

Contractor is to provide trained and competent personnel with initial installation, commissioning and operational

training under the supervision of the manufacturer’s technician. The incinerator is to be maintained and operated to

manufacturer’s specifications by trained personnel. Contractor must have sufficient personnel trained and competent to

operate the incinerator throughout the contract period. Specifications for the incinerator are attached in Appendix A.