incinerator


  1. l) Ease of Use and maintenance
  2. i) The unit should be simple to learn to use, operate, and maintain.
  3. ii) The unit should have abbreviated operating instructions included on or with the unit (e.g., on a laminated card

attached to the unit).

iii) The unit should be easy to clean, disinfect, and/or sterilize, as appropriate. iv) The unit should be designed for

easy access to serviceable parts.

 

  1. m) Special maintenance tools, spare-parts and consummables
  2. i) Where necessary or required, the supplier must include any special tools required for the maintenance of the

proposed equipment

  1. ii) Each equipment must be supplied with the recommended spare-parts
  • The new incinerator is to be used for burning mostly paper but also cigarettes confiscated by customs.

 

  • The design is to be based on 1200 bags per year, standard brown bags for burning “ BANNER”, Product Code

971-0003, capacity 75 litres;

 

  • The quantity of cigarettes is not known but is not expected to be the deciding factor, at least in terms of

capacity.


pet incinerator price


  1. j) Controls
  2. i) The controls (i.e., switches, knobs, etc.) should be visible and clearly identified, and their functions should

be self-evident.

  1. ii) Device design should prevent misinterpretation of displays and control settings.

iii) Switches and controls should be protected against accidental setting changes (e.g., due to someone brushing

against the panel).

  1. iv) Controls should be sealed against penetration of liquids.

Capacity: 30 kg per hours for a maximum load of 120 kg.

GLP Gas

Voltage: 110V-120V

Semiautomatic control board

Stainless steel chimney, 3.5 meters above the incinerator.

High temperature painting for all the incinerator.

Front door for loading and unloading.

Hours of  Operation the burn 4000kg/day ( if to fed as batches , please mention )

 

  1. k) Labeling
  2. i) Labels and markings should be clear and legible.
  3. ii) Labels and markings should be durable enough to withstand routine cleaning and normal wear.

iii) Appropriate warning legends should be provided on the unit.


clinical facility incinerator manufacturers



SCHEDULE 2

  • TECHNICAL SPECIFICATIONS OF THE INCINERATOR
  • General Description

Previous experience in the supply, installment as well as appointing of burners

  1. Overall plant layout
  2. Feed chamber/charging
  3. Primary combustion chamber
  4. Particulate scrubbers
  5. Acid gas
  6. The stack/chimney.
  7. Minimum capacity of primary chamber = 10cubic meters
  8. Burn rate (rate of waste incineration) = 10 kg per hour
  9. Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
  10. The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.
  • Scope Of Work

at least10kg per day

  1. Supply, install and commission an incinerator as provided   in the technical specifications
  1. Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this
  1. Assessment and preparation  and construction of  a standard incinerator shed with one waste  storage room  ( see the design )
  1. Provision of operation and maintenance manuals and drawings complete with maintenance schedule and
  1. Fuel oil storage tank- Mild steel 1000 liters capacity
  1. Onsite training for operation and maintenance

Basic Strategy design to Supply Overall plant layout.

Genuine estate center with one waste storage room

Deal Real estate designs with ideal cross air circulation

  1. TECHICAL SPECIFICATIONS OF THE INCINERATOR

Chamber (Afterburner Optimum departure temperature must not be much less than 1100oC

Security interlock, Fan Newbie, Heating System on/ off switch/door safety button, Vehicle layer button, temperature levels regulate device.

  • Primary Combustion
  • This chamber should be equipped with burners that use low sulphur
  • The chamber should ensure a minimum exit temperature of 850 degrees
  • This unit should operate at over 1100 deg C to ensure complete
  • This chamber should be equipped with burners that use low sulphur
  • Heavy-duty steel casing
  • High quality refractory lining and insulation
  • Large full size top load door and liquid retention
  • 1 x oil fired ignition burners operated on/off
  • Secondary Combustion Chamber (After burner)
  1. Heavy-duty steel casing
  2. High quality refractory lining and insulation
  3. 1 x oil burner
  4. Should be fitted with burners that use low sulphur
  5. Ensure secondary air supply is controlled.
  6. Ensure residence time is not less than two seconds.
  7. Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees
  8. Ensure the emitted oxygen content of the emitted gases is not less than 11%
  9. Ensure both primary and secondary combustion temperatures are maintained until all waste is completely
  • Particulate Removers

Key Combustion Chamber Minimum departure temperature level need to not be much less than 850oC

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters
  • Chimney/Stack
  1. The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  2. The chimney should be visible to the operator from the feeding
  1. The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  2. The point for measurement of emissions shall be
  • Instrumentation
  1. Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary
  2. An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required
  3. A carbon monoxide and oxygen meter/recorder should be
  4. A smoke density meter/recorder should be
  5. A solid particulate meter/recorder should be
  6. Any other instrument that may be considered
  • Location / Siting of the Incinerator
  1. a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the
  • Emission Limits
  1. Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
  2. The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
  3. The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack
  4. Opacity of the smoke must not exceed 20% viewed from 50 metres with naked
  5. All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and
  6. A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x

Second Burning Optimum leave temperature level need to be not a lot less than 1100oC

  1. The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16
  • Ease of Use
  1. Auto
  2. No pilots to
  3. Automatic control and temperature monitoring
  4. Built-in skid facilitates placement
  • Fuel Efficiency
  1. Rapid incineration means low fuel
  1. Up to 20kgs per hour (dependant on application).
  2. Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing
  • Quality Built to Last
  1. Heat resistant 3mm
  2. Stainless steel
  • Key Features
  1. Low running and maintenance costs
  2. Fully Automatic and simple to operate control panel
  3. Afterburner Preheat
  4. Incineration Temperatures in Excess of 900 degrees C
  5. 3 mm Steel Casing and Fully insulated
  6. Dense Refractory Concrete Lining Rated to 1400 degrees C
  7. Solid Hearth to Allow Maximum Burnout
  8. Large Top Opening Lid For Easy Loading
  9. Stainless Steel Flue as standard
  10. 12 Months or 1000 hours
  11. Optional Stainless Steel Casing
  12. Heat Recovery System option
3.13 Fuel and Capacity  
1. Low sulphur fuel
2. Capacity (Cubic Mtr) .10
3. Average Capacity 40kg
4. Fuel Consumption (ltrs / hr) 3
  • External Dimensions
1. Length (mm)               735  
2. Width (mm)                500
3. Height Incl. Flue (mm) 1960
4. Door Opening (mm) 325 x 325
  • Internal Dimensions
1. Length (mm) 620
2. Width (mm) 390
3. Height 500
  • Operation
  1. Minimum Operating Temperature 950
  2. Maximum Operating Temperature 1320
3. Burn rate per hour 5-20kgs
4. Temperature Monitoring Available
  • Particulate Removers

SECTION VII

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters
  • Chimney /Stack
  • The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  • If possible the chimney should be visible to the operator from the feeding
  • The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
  • The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  • Point for the measurement of emissions shall be
  • Control Panel
  1. Control of 2 burners
  2. Timer control 0- 12 hours
  3. Integral fan timer control
  4. Temperature and thermostatic control

COST TIMETABLE FOR THING

NO: REQUIREMENTS SUPPLIER’S REMARKS
1. Experience

Price schedule for Supply, Installment, Checking out as well as Appointing of an incinerator for Turkwel Power Terminal

 
2. 1 Year Maintenance Contract  
3. Work rate

WONDERFUL BARGAIN

 
4. Design

1

49,50,51,60,61,77,78,79,80,81,100

ENTIRE WHOLE LOT

GREAT DEAL

Offer Housing styles with appropriate cross air flow

Chamber (Afterburner Maximum departure temperature should not be less than 1100oC

 
5. Standard control panel

Security interlock, Follower Beginner, Heater on/ off switch/door safety switch, Car fold button, temperature levels regulate device.

 
6. Combustion Chambers

Key Combustion Chamber Minimum departure temperature level must not be much less than 850oC

Second Combustion Optimum leave temperature level need to be not much less than 1100oC

 

SECTION VII

PRICE SCHEDULE FOR ITEM

Rate schedule for Supply, Installment, Examining as well as Commissioning of an incinerator for Turkwel Power Station

1 2 3 4 5 6
Item Description Unit of sale Quantity Unit price Total price
1. Supply, install, and commission the incinerator as specified. LOT 1    
2. Construct a standard incinerator housing facility as per the drawing and architectural notes provided  

GREAT DEAL

 

1

   
4. Construct one  waste  storage  room (provide specs on room size, construction material etc) LOT 1    
5. Supply / adhere to  the requirement of OSHA 2007 act

49,50,51,60,61,77,78,79,80,81,100

LOT 1    
6. Onsite training of Operation and Maintenance staff. LOT 1    
7. All the key Spares (Attach a separate List) LOT 1    
8. Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level. LOT 1    
9. Supply of Operation and Maintenance Manuals.  

WHOLE LOT

1    
10. All other items not specified but necessary to complete the Installation.   A separate list of these items to be attached.  

LOT

1    
11. Fencing of  a compound  of 10 meter length  by 10 meter  width   using Concrete  poles  high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate) LOT 1    
  Sub Total        
           
  Discount  (%) if any        
  Applicable Taxes and Duties        
           
  Total Cost in Kshs        



burner kind of pyrolytic clinical waste burner capacity



Including:Incinerator: Structure to be specified
The mark to be specified
Water temperature: 800 to 1000 ° C;
Refractory
Temperature of more than 1100 ° C + obtained;
Capacity: 20-50 kg / hour
Fireplace: 4 to 6 meters high;
Dimension 70 cmx70 crn
Height: 1.10 meters
Fuel: coal;
Aspiration: natural

– A receiving cage for biomedical waste;

– A combustion chamber with a chimney with a filter to retain the ashes;

Chimney section: about 300 cm; With a minimum height of 6 m

Door size: approximately 50×60 cm

Supplied with a 500 liters fuel tank and all necessary accessories for installation.
–                          INCINERATOR for pharmaceutical waste treatment with                  a scrubbing system

With the following technical data:

1.      One pharma solid waste incinerator unit containing two combustion chambers and based on steel base with scrubbing

system.

2.      Working hour /day: minimum 10 hours/day.

3.      Capacity: Approximated 150 kg/hr. Over 10 hrs.

4.      Wastes characteristics:

·         BULK density: 70 – 100 kg/ bm³.

·         Calorific value: 2000-3000 kcal / hr.

·         Moisture content: 20-30%by weight.

·         Ash content: 2 – 8 % by weight.

·         Plastic content: 15-20 % by weight.

5.      Two combustion chambers.

6.      Operating temperatures:

·         First chamber: not less than 700 – 800 °c.

·         Second chamber: not less than 1200 °c (during steady operation).

7.      The burners should be automatically switched off if any of the combustion chambers doors is open.

8.      The burners of the first and second combustion chambers are selected for burning diesel oil (light fuel).

9.      Automatic loader and unloader to be provided.

10.     Exhaust gases to be comply with International Environmental code and requirements.



diesel oil fired medical waste incenerator



Heat Waste Incinerator Layout D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimum Weight( Kg) -4000 kg Added Chamber

(double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, solitary

phase 50-60Hz Minimum operating temperature degree 1200 oC One year extra parts bundle for full maintainability 10m pipe

pipe. 1100 litre fuel Storage tank +pipeline system Containerised (the container will definitely function as housing) Added smokeshaft development

1 metre high One (1) year warranty.

Heater of 20 Kg: 03 Gadgets

Electrically controlled burner.

Two-compartment heater with a capacity of 20 kg/ hour.

Burner with minimized upkeep as well as operating expense; Prepared with an automated control board as well as very simple to utilize with

electro-magnetic securing of the door.

A major waste decline chamber of 900 ° C. A post second burning chamber of gases developed in the main chamber

at the minimum 1100 ° C.

Carbon deposits in ash much less than 5% by weight in accordance with European Directive 2000/76/ EC.

With refractory cellular lining in products of better
1/ Cost of a 200kgs/Hr medical waste heater.
2/ (CIF Term) Cost of distribution from making center to PAPUA NEW GUINEA port of LAE, Morobe district
3/ Cost of 2 Clover engineers to Oversee, Setup, Educating our engineers and designating the clinical; waste

incinerator.



incinerator for medical waste


MINIMUM REQUIREMENTS FOR ENGINE OF INCINERATION
CAPACITY OF INCINERATION 30KG / H

1. GENERAL SPECIFICATIONS:

The incinerator for medical waste must be designated for the destruction of all types of waste produced by the Center for Health (waste type hospital, clinic, medical laboratory for destructive capacity of 30kg / h) .

Pyrolytic gasification combustion control shall:

? Prevent development of black smoke and dust formation tine loading of waste;
? Provide regular and complete combustion of the waste;
? Provide controlled guaranteeing the absence of color, cloud of smoke or burning odor;
? Allow limited fuel consumption

The incinerator with pyrolytic combustion must have:

a. Combustor:

– Chamber strong steel support legs sheet;
– The lining is made of refractory bricks and a thermal insulation ensuring a minimum temperature of the sheet;
– The sole combustion is composed of a refractory lining specially designed to meet the thermal, mechanical and corrosive liquid waste requirements and molten glass;
– The dimensions of the floor are equipped laterally primary air nozzles that fuel combustion;
– The hearth is equipped with a stirring system of waste combustion is controlled switch;
– The recovery operation of the ashes will take place once a day line before starting the day’s operation.

Composition of the refractory lining:
* Insulation:
– Operating temperature:             1000 ° C max
– Nature:                    Calcium Silicate
– Thickness:                    80 mm
* Refractory:
– Operating temperature:             1650 ° C max
– Nature:                    Refractory bricks with 42 alumina
– Thickness:                    110mm

Burner combustion:

– The combustion chamber is equipped with a burner to line to ensure correct temperature for the total destruction of waste combustion;
– Automatic monobloc burner and flame plunge equipped with an electronic ignition system and permanent ventilation.
Air fan:
– A primary air and secondary air fan provides the necessary oxygen delivery
– There is a motor operated valve that controls the flow according to the combustion.
– The pressure of the fan is 500 mm CE to pierce the mass of waste during combustion.

b. Post – combustion chamber:

– Treat the gas has a minimum temperature of 1100 ° C with a minimum residence time of two seconds the afterburner is to;
– A secondary air injection is expected and provides perfect oxygen content;
– The burner ensures a minimum temperature of 1100 ° C continuous;
– The design of this burner is similar to combustion burners;
– The afterburner is equipped with access doors in order to ensure regular cleaning of dust;
– The afterburner is lined with high thermal insulation with a thickness of 150 mm

c. Cabinet, control and regulation:
– The entire installation will conform to European standards (EU)
– The electrical power is 220V 50Hz single phase.
– Regulators of temperature with digital display:
? 1 to regulate the temperature of the combustion chamber
? 1 for controlling the temperature of the afterburner
? The manual controls are provided on each item.

2. PRODUCT DIMENSIONS

Description    Dimensions
Destructive capacity    30 Kg / hour
Operation    12h/24, 6d / 7
Fuel    diesel oil
Chimney    Height: 5m, Diameter: 280mm
Volume of combustion

chamber Combustion: 0.3 m3
Post combustion: 0.2m3
Mixed combustion chamber: 0.3m3
` TEMPERATURES:
. Combustion
. Afterburner
900 ° C
1100 ° C
POWER BURNER
Combustion
Afterburner

0.11 KW
0.11 KW0

Fan power    0.37 kW


Economic incinerators


Temperature level Controlled Heater. Modern modern technology: Heavy-duty covering, for a high quality, sturdy, trustworthy, budget friendly Heater with considerable control, really straightforward to operate and likewise self-supporting.

Notice: Comparable Modern Innovation and also/ or Tenderers Proposals price.

RECYCLABLE WASTE PLASTIC (NON-PVC) 218,693
PAPER 4,956
PVC 15,115

USED ENGINE OIL FILTERS 85,423
The distribution will compose the unique tools for dependable waste surveillance as stated over to get a fresh personal setting agreement management firm using ready remedies 2013 in Indonesia along with Thailand, as well as 2015 in West & & & & East Malaysia to execute these skilled solutions so as to comply with the federal authorities security disposal requirements for animal waste in the region along together to please the greater technological requirement in this particular location so as to protect the general public as well as contain contagious & & & & infectious ailments and likewise pet actuated ailments. The spread of a fresh illness of pigs, furthermore the” Nipah Infection Health problem’, initial visible in 1998 in S.E.Asia, which induces sickness and also casualty in both human beings as well as pigs, gets about the surge once again; in addition to the abrupt passing of plants as well as also boars was recorded in pig farms in Malaysia as well as various other areas in S.E. Asia.

Temperature Controlled Heating Method. Contemporary technology: Heavy-duty covering, for a high quality, rugged, dependable, inexpensive design with significant control, exceptionally easy to run and likewise independent.


waste incinerator


Burring Ability 100/ / 200 KG/ human resources Please develop your bargain right here
Kind of Paint Heat Resistance tooth paint Please compose your bargain listed below.1. Ability: to cremate (carrion and spoils) 350-400kg/ hr

4.

Type of Paint Warm Resistance tooth paint Please compose your offer below.1. Capacity: to cremate (carrion and also spoils) 350-400kg/ hr

4. Burner weight: 1800-2000 kg

7. Quantity: 0.70-0.80 m/cube

8. External measurement: 1.4-1.6 * 1.0-1.15 m (L * W)

Main Chamber{
(adsbygoogle = window.adsbygoogle || []).push({});|}
(adsbygoogle = window.adsbygoogle || []).push({});
Burner Kind Double Chamber
Warmer Time 20 mins please create your deal listed below
Packing System Manual/ / Batch Kind please make your offer below
Gas to be taken advantage of Gas/ Deisel Please write your bargain right here|Gas to be taken advantage of Gas/ Deisel Please write your bargain right here

Burring Ability 100/ / 200 KG/ human resources Please develop your bargain right here
Kind of Paint Heat Resistance tooth paint Please compose your bargain listed below.1. Ability: to cremate (carrion and spoils) 350-400kg/ hr

4.