laboratory heater



the entire carcass of animals (cattle, steeds,
Sheep, pigs, and more), along with normally contaminated materials
Products in the gas stove.
? Opening Doors – – – – the closure as well as additionally dependency automatic system,
Which are dealt with from another area by the operator.
? made to work in long mode in addition to quick
Activity (Running Start EP – – – – i). – –? Completely mobile – set up on wheeled chassis.
Throughout the treatment. Burners require to be provided.
As usual tools a special truck

air retention for at least 2 secs at a temperature level of less than 850C, the combustion.
In order to attain the suitable effect.
? ought to be a two-chamber heaters, main in addition to additional.
Gas stoves.
? The waste things to minimize the preliminary amount.
Feasible to reduce (about 5% sterile and also tidy ash.
Type).

Heaters should be supplied in the fuel container (diesel ).
? The minimum capability of the family pet carcass burner.
The destruction of 1000 kg/ human resources. Heater ability is calculated.
8MJ/kg- product as well as additionally 60 % moisture.
? It has to be possible to use the burner +40.
C to – – – – 15 0C lab incinerator.
Temperature level in addition to 5% – – – – 95 % – of moisture problems.
? PLC controller along with an integrated temperature level panelita complete.
Automatic control, a control computer system, which is kept.
Information on the version of temperature degree relative to time in addition to.
Graphic images.
? have to have gas with automated control as well as malfunction.
Exploration system.
? the ability to pre- workout, body waste burning on along with off.
Uniformity is independent of the second as well as very first chambers.
? assuring the burner with electrical energy, it.
Must be set up on the generator.
? clean the heater should certainly be simple devices,.
Without making use of any type of sort of added devices



healthcare facility burner



Supply, arrangement and also screening of medical waste burner with an ability of 75 kg/ human resources gas (LPG) total amount with all devices and also as a result with the chimney based on the technical specs along with problems of public wellness
make a room for the burner that fit 3 burners as in thing 3.1.1 as well as affixed to the heater space waste store that match waste for a duration of 7 days as well as all the structures of boosted concrete with preparingg heater structure as well as also store with all the job of wiring, electric as well as illumination systems, water as well as likewise sanitation
supply incinerator structure in addition to the waste storeroom with a fire snuff out sprinkler system counts on the resource of the water from network of teh basic website, in addition to a fire alarm system consists of noticing systems for cozy, smoke as well as this system is related to the medical facility emergency situation alarm system systems
Supply, arrangement along with testing of the air circulation system of the burner room and additionally the stockroom with fans ROOF COVERING LEADING EXHAUET FANS supplying them with filters with high efficiency (HEPA FILTER trip to draw followers with taking the air modification price of 5 times per human resources with streams and additionally air needed grilles
Supply, arrangement, checking various conditioning system for waste database DUCTED SPLIT UNITES and capability sufficient to maintain the interior temperature level at 14 levels Celsius in summer season as well as winter season
Supply, setup, testing of the air conditioning store of shielded premade wall surfaces inside the waste space with an ability of 35 cubic meters to save the clinical waste at a temperature of no Celsius till losing consisting of the cooling device and also all accessories
RISKY wood.
play hardwood.
petroleum residual waste.
hydraulic hose system.
calcium hydroxide bags.
bags or wood boxes including cyanide.
medical waste.
filters.
pharmaceuticals.
NO HAZARDOUS sawdust.
plastic.
plastic as well as likewise textil awnings.
wood.
plastic bathtubs.
rubber.
hygienic waste.
EPPs.
plastic bags.
structure and also building and construction reoccuring.
infected dustcloths or towels.
plastic or packaging of food.
polyestirene recipes, glasses, spoon, fork, etc.Capacity burner medical waste to high burning temperature degree.
With an electric gizmo to shield the setting as well as with 2 combustion chambers furnished with burner or oil.
– – heater to lose big volume things of 70 centimeters.
discrepancy: Automatic Control System.
– – harmful ability from 20 to 30 kgs.
First-room/ Temperature level = 900 ° C combustion.
2nd space/ Temperature degree = 1200 ° c afterburner



dispose Medical waste IV



the incinerator can be made use of to do away with Clinical waste IV, used needles, utilized syringes, scalpels, made use of dressing product, private security gadgets like gown, gloves and so on truncated body components, excreta from clients and also various other research laboratory waste.incineration tools that can deal with a mix of clinical as well as contaminateds materials. The professional wastes contain (yet are not restricted to) products polluted with blood, physical liquids, feces, as well as additionally human tissue/organs from medical treatment. The dangerous substances include (however are not restricted to): xylene, toluene, chloroform, methylene chloride, trichloroethylene, acetonitrile, formaldehyde wastes, radiation treatment wastes (e.g., Chlorambucil, Cytoxin, Daunomycin, and more) radiology wastes (e.g., glutaraldehyde), as well as mercury-containing compounds.includes dismembered body components, body fluids consisting of polluted blood, blood products, excreta from people, cultures of communicable infections along with different other research laboratory wastes e.t.c.
Medical might also contain made use of needles, taken advantage of syringes, taken advantage of, ended or infected clothes items like plastics, plasters and plasters, e.t.c. The Burners ought to also allow disposal of other wastes created in medical care facility environment.Technical Needs for Portable Incinerators

The Chamber quantity of around 0.37 m3 and likewise a.
1 combustible lots amount (amount of product) of.

around 0.30 m3

2 Burner power of around 189,000 kcal/hour.
Optimum Burning Temperature level Level of approximately 1250

Degree Celsius.
Type of sent Gas: Inert as well as absolutely no ecological air pollution impact.
Electric Power: 220V/50 or 60 Hertz

Gas: Diesel

Electric consumption of approximately: 0.35 kw/hr

Gas usage selection: 7 – – – – 11 ltrs/hr

Controls: Burner control consisting of control board, timer, display screen for watching on combustion temperature level, system blunder present screen, and more
. Packaging/Installation: Heater totally established in addition to prepared to be linked in power source

Customer’s handbook: Bundle needs to be supplied user’s hands-on including defined info to installation, procedure, upkeep, analysis of issue shooting signals and also get in touch with telephones. numbers/emails of neighborhood or abroad provider’s specialists that can be required assistance on treatment of the gadgets, if needed.

training guide/manual on a cd consisting of a demonstration for installation, operation and also. maintenance, in addition to security criteria, etc.

Range of Supply: Package requires to be supplied consisting of. all the called for devices for installment as well as likewise must. contain spare parts/consumables that are required for a. one year period at a burning price of about 8 hrs. daily

Warranty need to be provided for a 5-years duration. starting with the heater’s arrangement and. including the arrangement of devices along with.
consumables



Medical Center Waste Monitoring



Hospital Waste Management as well as Competitive prices as Pakistan is a competitive market. We have a complete setup with Office, Customer Relations, Import / Export, Biomedical Department, Application Support Department & Project Designing Department.Description        Minimum Requirements
Design standard    Multiple chamber incinerator to the design of EPA  standards, Air pollution control
Description of the Chimney    Top mounted, self supporting
Incinerator performance    150kg/hr
Refuse     Hospital waste and carcasses
Recommended Temperatures    Minimum 1000⁰C
Dimensions:
Length
Width
Height
Extra width for burners    At least 3000mm
Loading door opening    Minimum 700mm x 600mm
Hearth area    5.00square meters
Description or grate/hearth    A full hearth supplied to prevent contaminated liquids from flowing into the ash pit without being incinerated
Primary chamber volume    At least 3 cubic meters
Mixing chamber volume    At least 1 cubic meters
Settling chamber volume    At least 3 cubic meters
Weight excluding chimney    15, 000kg at manufacture
Firing tools supplied    Hoe, Poker and rakeMaterial of construction    Case – 5mm mild steel.
Bracing – Heavy angle and channel.
Hearth – 1550⁰C castable general purpose high strength, high abrasion resistant monolithic refractory concrete.
Ashing door – High grade cast iron.
Loading door – 5mm mild steel lined with 1550⁰C castable  general purpose high strength, high abrasion resistant monolithic refractory concrete.
Refractory  concrete:
Alumina content of refractory
Refractory thickness
Minimum 49%
At least 127mm.
Insulation  to walls     1000⁰C Castable insulation
Chimney stack:
Chimney
Height from base    3.5 mm mild steel
9 meters above ground level and clear the highest point of the building by not less than 3 meters
At least 560mm
At least 750Kg
Controls:
Draught

Air supply

Electric

Barometric indicator, door operated draught limiter

Built-in forced heated air ducts, primary and secondary (intensifier)
Control panel – Circuit breakers, main switch, timer, pilot lights, 2 set point pyrometer and one set point pyrometer.
Electricity supply required    415 Volts Three phase.
Auxiliary  fuel    Electrically operated only
Emission     Multiple chamber design with inbuilt emission control
Paint: Case and stack    400⁰C Heat Resistant Grey
Temperature of case    100⁰C



Melt blown Production Line 400mm and 1600mm and ES Fiber Production Line and N95 Mask Machine and Disposable Mask Machine


1. N95 and Disposable Mask Machine

 

2. 400mm and 1600mm Melt blown Production Line

3. ES Fiber Production Line

 

 

 

N95 Face Mask Machine Production Line

Melt blown Production Line

 

A.)Optional Capacity: 1600mm

Efficiency: 95-97%

FOB Term Price: USD per set

Price Valid: 5days.

Ave.60 Days ready for shipping.

In stock Price: USD per set

 

 

B.)Optional Capacity: 400mm

Efficiency: 40-50% .

FOB Term Price: USD per set

Price Valid: 5days.

Ave.20 Days ready for shipping.

Payment: TT 70% In advance, TT 30% before leave factory

Shipping: 1*20′ container per set, Ave. 2000Kgs.

 

Main Parts: Extruder, mold, winder, oven, ultrasonic

Daily Capacity100-150Kgs/24Hours

Screw extruder100-150Kgs

Motor power: 15KW frequency conversion speed regulation
Reducer speed ratio: 1:10 or 1:16
Screw length to diameter ratio: 30: 1
Screw diameter: 50mm
Winding machine diameter:
630mm
Winding machine drive motor power: 0.55kw
Speed ratio of winder drive reducer (if any): 1:71
Air heater power: 15kw
Power of vacuum calciner: 12kw
The size of vacuum calciner: 500 × 300 × 200
Ultrasonic power: 1800, frequency 28kHZ
Ultrasonic sink size: 800 × 300 × 250

 

 



HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-20


Double Combustion Chamber Incinerators 30kgs per hr



*** Double Combustion Chamber
*** PLC auto control operation
*** stainless steel chimney
*** smoke filter chamber
*** Italy oil/gas burner
*** whole design, mini. installation working
*** cheaper cost
*** long lifetime design
*** better material and spare parts

Items/Model

TS30( PLC)

Image

Melt Price

Common 30 kg/hour

Feed Capability

Normal 60kg per feeding

Control Setting

PLC( Programmable Thinking Controller Heater)

Burning Chamber

330L

Inside Measurements

75x75x60cm

Extra Chamber

180L

Smoke Filter Chamber

Yes

Feed Mode

Manual Feeding

Voltage

220V

Power

0.5 Kw

Oil Use (kg/hour)

Normal 13.3

Gas Intake (N.G, m3n/Hour)

Common 16

Gas Usage (L.P.G, m3n/Hour)

Ordinary 11.7

Temperature Screen

Four Digital Display

Temperature Level Protection

Yes

Oil Container

100L or More( Optional)

Feed Door

55x50cm

Smokeshaft

5Meter or Also More( Optional)

Smokeshaft Kind

Stainless-steel

1st.

Gross Weight

4000kg

Outside Measurements

175x120x140cm

Item

Requirements

Design

TS30 PLC

Main Item Checklist per 01 set


Main Combustion Chamber

Secondary Burning Chamber

Smoke Filter Chamber

Heater PLC Control Situation

Smokeshaft:5.0 Meters

*( upgrade to Stainless Steel, complimentary rate)

Italy oil/gas burner: 02 collections

Oil Container (if oil gas): 100Liters

2020-02-10

*( upgrade to Stainless Steel, complimentary price)

Italy oil/gas burner: 02 collections

Oil Container (if oil gas): 100Liters


HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-02-10



hiclover 10kgs per hour incinerator



Smallest waste incinerator for small hospital 
average 10kgs per hour. 
with double(2) sets burner.

Tools Technical Specifications

Version

YD-10

Feed Capability

Typical 20 kgs per feed

Burning Cost

Regular 10 kgs per hour

Burning Time per Feed

2 humans resources

Voltage

220V

Gas

Diesel oil

Heater

Italy Heater

Feed Establishing

Guidebook

Gas consumption (Oil)

5.4-12.6 Kgs/Hour

External Capacities

100 x 100 x 160cm (mainbody)

Inner Dimensions

50 x 50 x 80cm( Secret Chamber)

Waste burning chamber

200Liters

Article Burning Chamber

100Liters

Oil Container Capacity

50 Litres

Door Opening

35 x 35cm

Chimney

3.0 M

Gross Weight

1000kgs

Chamber Item

Refractory Concrete

Max. Warmth Worth

126,000 Kcal/Hr.

Procedure Technical Specs

Chamber temperature

8000C -10000 C

Chamber Anti-Rate

13500C

Residency time

0.5 Sec.

Burning effectiveness

> 98%

Waste Lower Calorific Power

3000Kcal

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-02-08



domestic incinerator


Documents to be submitted as following ;

  • Fabricators accreditations
  • Test report to prove ZERO harmful emission level provided as samples form other installations
  • Test report to prove sterility achieved at 6log to 10 level to be provided upon commissioning report and validation.

 

Technical proposal include:

  • The hospital should provide the necessary space: building & infrastructure, sufficient power steam supply and

connection up to room water & sewage line to the room

  • Room preparation: preparation, Renovation & Modification of the room is suppliers responsibility
  • The supplier should submit the necessary drawing showing space requirements ( room size (LxWxH) dimensions of

processors & ancillary equipment

  • Supplier must give the proposal of the total power requirement of the whole unit and on which the hospital will

ensure the power supply. However connections inside the room is suppliers responsibility

  • The connection/fittings form the processor and ancillary equipment to water and sewage line is suppliers

responsibility.

  • A detailed training proposal including the duration of staff training on how to operate and maintain the processor
  • A detailed maintenance schedule.
  • List of spare parts and accessories required for maintenance of the system

 

Warranty & After Sales Services:

  • Warranty period will be minimum 03 years or as offered by the manufacturer which comes later.
  • Warranty period will be counted from the date of handing over of machine over of machine to the user in functioning

condition i.e date of commission.

  • In warranty period supplier have to provided all maintenance & repair services.
  • Breach time will not be counted in warranty period.
  • At least 10 years back up service (including warranty period) has to be ensured by the supplier.
  • The repair/maintenance work should be carried out within 72 hours after getting request for such from the user.

 

Quality standard: CE/FDA certificate of the offered item must be submitted with the offer.

  • For verification of the certificate bidder must submit the following :
  1. i) Mailing address of the issuer of the certificate.
  2. ii) Website, Email address & Fax & Telephone Number of the issuer.
  • The bid will be non-responsive if:
  1. i) The certificate issuer can not be reached
  2. ii) The issuer fails to authentic the certificate within the bid validity

iii)   The issuer confirms that the submitted certificate is defective in terms of authenticity or validity.